Council archive · source document
180078 - Resort Entry Drawing · 51901.3604.01
Very large file (29.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
r
XX
General Notes to External Windows & Doors
01 All dimensions ot be be checked on site prior to manufacturing.
02 Glazing is to be free of embossed or transfer motifs unless required by
window manufacturer, supplier, certifier or other. If required, allow for
transfer motifs, 10mm wide band of frost tint with semi circular ends set
in 60mm from window or door styles, positioned at typical motif height.
Contractor to ensure motifs are not embedded within glazing.
03 Door and Window Schedule shall be read in conjunction with
Architectural Drawings. Any variations from this schedule must be
notified to the Architect prior to ordering
04 Window & door sizes are nominal. Contractor to ensure windows and
doors are fabricated to match exact framing / surround dimensions and
allow for packing out of walls to accommodate door / window frame
depths.
05 Contractor to ensure that all window & door head heights are equal
distance above finished floor level unless otherwise noted.
06 All fixings of windows and doors to be 316 grade stainless steel.
07 All door sills to be set down unless noted otherwise. Contractor to allow
for set down to timber joists & concrete slabs to ensure all doors opening
onto external spaces finish flush with internal finished floor level.
Scheduled door heights do not allow for set downs
08 Stacking doors to stack so that the are flush with the jamb offering full
egress opening.
09 Where window openings occur over 1m above finished ground and do
not have a balustrade the opening of the window must be limited to
100mm above finished floor level to allow for compliance with NCC
where applicable.
40 Where the floor below the window is more than 2m above the surface
beneath the window is to be restricted or screened so a 125mm diamater
sphere cannot pass through. The device or screen must be able to
withstand an outward horizontal force of 250N. Where 102mm louvres
used, louvre system to withstand this horizontal force also.
11 ALL WINDOW AND DOOR DETAILS ARE TO BE CONFIRMED WITH
NOMINATED SUBCONTRACTOR PRIOR TO DESIGN FABRICATION.
General Notes to Internal Windows & Doors
01 All dimensions ot be be checked on site prior to manufacturing.
02 All hardware to be satin chrome or stainless steel finish
03 Door and Window Schedule shall be read in conjunction with
Architectural Drawings. Any variations from this schedule must be
notified to the Designer prior to ordering
04 Contractor to ensure that all window & door head heights are equal
distance above finished floor level unless otherwise noted.
Windows & Doors
01 Aluminium Joinery:
Commercial/architectural series aluminium framed sections. Preference
throughout is for slim line frames, maximising glass area
Finish: Powdercoated aluminium - high durability finish generally,
Colour: Black Matt TBC
Note: Contractor to advise Architect if different section is required to
achieve the type and size of glazing item.
02 Glazing:
Viridian ‘Comfort Plus’ generally tbc. All full height windows and doors to
be ‘Grade A’ toughened safety glass (tbc to sub contractors design and
relevant australian standards),
Finish: Clear (unless noted otherwise)
Note: Design in accordance with Engineers Documentation.
03 Louvres:
All louvre windows to be by 'Breezeway’. Contractor is to ensure louvre
blades are 102mm wide to comply with NCC 2016.
04 Insect Screens:
Fit fibre glass insect screens to all operable windows
Where nominated in schedules as 'rectractable' allow for centor
rectractable insect screens integral with door jambs
Door Hardware General Notes
01 All locks to be keyed alike.
02 All hardware to be supplied complete with striker plates, escutcheons etc
as required.
03 All hardware to be 316 grade stainless steel unless noted otherwise.
04 Butt hinges are to be used unless noted otherwise.
05 Any discrepancies or omissions to be referred to the Architect for
resolution
06 Swing doors to WC's to be on lift off hinges.
(sparks architects
NX
D#.
Frame W x H
Size
Elevation
Operation Type
Glazing/leaf
Finish
Hardware Set
Notes
D#.
Frame W x H
Size
Elevation
Operation Type
Glazing/leaf
Finish
Hardware Set
Notes
01
2,100x3,000
02
5,400x3,000
A
03
7,540x3,000
20.07.18 AK
04
2,700x2,920
Surface slider
Clear glass
Powder coated aluminium
frame. Colour TBC
Yet to be selected
Lockable
08
1,000x3,000
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
Surface slider
Clear glass
Powder coated aluminium
frame. Colour TBC
Yet to be selected
Lockable
09
800x2,100
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
Surface slider
Clear glass
Powder coated aluminium
frame. Colour TBC
Yet to be selected
Lockable
10
800x2,100
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
Roller door
NA
Colorbond. Colour TBC
Yet to be selected
Lockable
11
1,000x2,100
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
Detailed Design
05
2,700x2,920
Roller door
NA
Colorbond. Colour TBC
Yet to be selected
Lockable
12
800x2,100
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
06
2,400x3,000
Roller door
NA
Colorbond. Colour TBC
Yet to be selected
Lockable
13
1,200*1,200
Swing Gate
NA
Powder coated aluminium.
Colour TBC
Yet to be selected
Detailed Design )
07
1,000x3,000
Swing door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
14
2,000*2,100
Double Swing Door
NA
Paint. Colour TBC
Yet to be selected
Solid core, Lockable.
Resort Entry Alteration + Swimming Pool
5 Quamby PI, Noosa Heads QLD 4567
project
Culgoa Point Beach Resort
client
106 AK
job no. drawn
Door Schedule
DD 6.2 {
\ >)
ra,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
180078 - Resort Entry Drawing.pdfRelated documentApplication case desk ↗
About this file
- File size
- 29.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.