2022-05-16 General Committee Meeting Minutes

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


             NROR-2021-03       A       Goat Island Restoration Site                    09/07/2021
             NROR-2021-04       A       Tewantin Island Restoration Site                09/07/2021
             NROR-2021-05       A       Noosa Sound West Restoration Site               09/07/2021
             NROR-2021-06       A       Noosa Sound East Restoration Site               09/07/2021
        Currency Period
        3.     The development approval lapses if the works have not been substantially
               started by 19 May 2024, unless an application to extend the currency period is
               approved by Council.
        General Conditions
        4.     All works must be undertaken in accordance with the Noosa Oyster Restoration
               Project – Project Restoration Plan prepared by The Nature Conservancy dated
               January 2022.
        5.     All works must be undertaken in accordance with Maritime Safety Queensland
               (MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
               to signage and aids to navigation as detailed in the Noosa Oyster Restoration
               Project – Project Restoration Plan (Section 7) prepared by The Nature
               Conservancy dated January 2022.
        6.     All works must be undertaken in accordance with DAF requirements relating to
               notifications, marking of approved boundary areas and restoration of marine
               plants/tidal profiles that are temporarily impacted as a result of the works as
               detailed in the SARA Decision Notice.
        7.     All works must be undertaken in accordance with Best Practice Erosion and
               Sediment Control (BPESC) guidelines for Australia (International Erosion Control
               Association).
        8.     All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
               Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
               The Nature Conservancy Australia dated January 2022.
        9.     All works must be undertaken in accordance with the current Queensland Acid
               Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
               Department of Science, Information Technology, Innovation and the Arts, 2014.
        10.    All materials used for construction works must be clean materials to ensure that
               the works do not contaminate the waterway.
        11.    All structures must be designed and constructed such that they are free standing
               within the waterway and are not connected to or behind the revetment wall.
        12.    All structures must have no detrimental effects on stormwater drains and/or
               easements.
        13.    In the event of collapse or failure of structural integrity of the oyster restoration
               substrates, the works must be removed from the waterway or reconstructed in
               accordance with this development approval.
        14.    All works must be undertaken in accordance with an approved Construction
               Environmental Management Plan (CEMP) which consolidates the commitments
               and management measures described in the Noosa Oyster Ecosystem
               Restoration Project – Project Restoration Plan including, but not limited to:
               a.    A Site Management Plan which describes environmental management
                     measures at the proposed load out site including details of stockpile
                     management;
               b.    An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
                     guidelines;

                                                                                    Page 10 of 15
Log in to download the original file

2022-05-16 General Committee Meeting Minutes(PDF, 467KB).pdf · 478 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.