GENERAL COMMITTEE MEETING MINUTES                                                  16 MAY 2022


                c.   A Marine Plant and Water Quality Monitoring Plan designed to monitor the
                     composition of marine plant assemblages at habitat restoration sites and
                     appropriate sites upstream and downstream; and
                d.   A Marine Biosecurity Management Plan for construction vessels.
                The CEMP should be submitted to Council for approval 20 business days prior
                to the commencement of works.
         15.    A monitoring report must be provided to Council on a six-monthly basis for the
                first year (and annually for the following 4 years) following completion of
                construction works which details the results of restoration monitoring and
                evaluation, including adaptive management measures taken and the success or
                otherwise of those measures.
         16.    Upon completion of construction works, any construction debris or waste must
                be removed from site and disposed of appropriately.
         17.    Lighting associated with the construction phase must be designed, installed,
                operated and maintained in accordance with Section 3 of AS4282 Control of the
                Obtrusive Effects of Outdoor Lighting.
         18.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
         19.    Any construction and post construction activity must not impact on the condition
                of the waterway, and is to be conducted so as not to breach the Environmental
                Protection Act EPA (1994) and the Environmental Protection (Water) Policy
                2009.
         20.    Certification by a Registered Professional Engineer of Queensland that states
                that the oyster habitat restoration substrates are constructed in accordance with
                best practice methods and is structurally sound must be submitted to Council.
                This certification must be submitted to Council within three (3) months of the
                completion of the works.
         21.    After completion, the proposed works must be maintained in a sound state of
                repair in accordance with the approved plans
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


    Procedural Motion
    Moved:           Cr Finzel
    Seconded:        Cr Stewart
    That the item lay on the table until such time as the previous resolution from the Ordinary
    Meeting dated 21 April 2022 with audit details be received.

    The Procedural Motion was considered ultra vires and the Chair ruled the motion
    invalid.


    Procedural Motion
    Moved:           Cr Lorentson
    That the item lay on the table until the Ordinary Meeting dated 19 May 2022.

    Cr Lorentson withdrew the motion.




                                                                                   Page 11 of 15
Log in to download the original file

2022-05-16 General Committee Meeting Minutes(PDF, 467KB).pdf · 478 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.