MAX WATTERSON+ASSOCIATES CONSULTING SURVEYORS & PLANNERS 28" February 2021 Ref: 20/5255 Your Ref: RAL20/0025 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Attention: Lisa Pienaar Dear Madam, Re: Development Application for Reconfiguration of a Lot — 1 Lot into 2 Lots Lot 174 on RP884826 19 Key Court, Noosaville Applicant: Gershon Dorfman | refer to the above-mentioned matter and your letter of Information Request dated 4th November 2020 and | respectfully supply the following information: Issue 1 Access The existing driveway is proposed to be utilized by proposed Lot 2. It is proposed that a driveway is constructed to Lot 1 between the poinciana trees on the footpath. The trunks of the trees are 7.2 metres apart, which provides a sufficient space for the construction of a functional and safe crossover. An amended Plan of Proposed Reconfiguration of the property is contained within Appendix A, included the location of the crossovers. Issue 2 Stormwater Drainage A box culvert (0.6m x 0.3m) is located along the north-eastern boundary of the property which provides drainage from Key Court to the Canal at the rear of the property. It is proposed that an overland flow path is excavated above the box culvert. The overland flow path is created by an excavation to a maximum of 0.25 metres; which includes the removal of 12m of soil. The soil removed with the overland flow path will be utilized within the driveway of Lot 2 to raise it to the minimum floor level; therefore, there is a nett Om? removal of the floodway volume of the property. The combination of the existing box culvert and the overland flow path cater fora 1% AEP. A Stormwater Management Plan of the proposed Reconfiguration prepared by Callaghan & Toth is contained in Appendix B; which concludes that the box culvert and the overland flow path with cater for the 1% AEP and that the box culvert and overland flow path can be contained within a 3 metres wide Easement for Drainage. The Plan of Proposed Reconfiguration contained in Appendix A also shows the extent of the Easement for Drainage. PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252 Max L. Watterson PH 07 5442 6121 Cadastral Surveyor (Qld) FAX 07 5442 5125 B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.