Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Acid sulfate Management Plan Reference Document OPW19-0239 · OPW19/0239

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
PROCEDURE C
Monitoring of Water Quality


Surface water not meeting the performance criteria specified in Section C6 will require treatment prior to
discharge.

C5 (b) Groundwater Monitoring
     During construction (excavation works) monitoring of groundwater shall comprise fortnightly monitoring
      of the following:

       Field measurements of pH, redox potential (Eh or ORP), standing water level and electrical
         conductivity (EC)

       Laboratory measurements chloride, sulfate, total acidity, total alkalinity, and total and dissolved
         aluminum and iron

     Post construction monitoring comprising four groundwater monitoring events over a period of two
      months for the following parameters:

       Field measurements of pH, redox potential (Eh or ORP), standing water level and electrical
         conductivity (EC)

       Laboratory measurements chloride, sulfate, total acidity, total alkalinity, dissolved aluminium
         (filtered), and dissolved iron (filtered)

Extension of the post construction monitoring program beyond this will be determined by a suitably qualified
Environmental Consultant following review of post construction results.

C6.      PERFORMANCE INDICATORS
C6 (a) Surface Water Performance Indicators
The following adopted performance indicators are considered as acceptable outcomes in relation to
ASS and disposal of all waters including stormwater run-off, groundwater seepage and leachate from
ASS will achieve the following quality prior to release from the site.

    Parameters                             Units                Performance Indicator

    pH                                     pH          Within the range of 6.5 – 8.5 pH units

    Suspended Solids                       mg/L                      < 50 mg/L
    Dissolved Oxygen                       mg/L                      > 6.0 mg/L
    Oil, grease, floating scum, litter     n/a               No visible plume or evidence
    Dissolved Iron                         mg/L                       <0.3 mg/L
    Dissolved Aluminium                    mg/L                       <0.2 mg/L




April 2019
J000799-003-R-Rev0 – Procedure C                       2/3

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acid sulfate Management Plan Reference Document OPW19-0239.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.