Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
10.1 Tidal works, or development in a coastal management district state code Table 10.1.1: All development Performance outcomes PO1 Development in a coastal hazard area is compatible with the level of severity of the coastal hazard. Acceptable outcomes A01.1 Development is located outside a high coastal hazard area unless it is: (1) coastal-dependent development, or (2) compatible with inundation due to its nature or function, or (3) temporary, readily relocatable, or able to be abandoned, or (4) essential community service infrastructure, or (5) small - to medium-scale tourist development, or (6) redevelopment within an existing built-up urban area, or is redevelopment of built structures that cannot be relocated or abandoned. AND | Response column key: MM Achieved P/S Performance solution N/A Not applicable Comment The proposed revetment wall is designed to withstand inundation and is redevelopment of an existing unmaintained revetment wall. The proposed revetment wall and pathway meet AO1.1 (2) and (6) AO1.2 Development referred to in AO1.1(6) avoids being located within a high coastal hazard area, or where this is not practicable, minimises the exposure of people and permanent structures to coastal hazard impacts. The reconstruction of the revetment wall is proposed to protect road infrastructure and therefore minimises the exposure of people and permanent structures to coastal hazard impacts. PO2 Development siting, layout and access in a coastal hazard area responds to potential inundation due to a defined storm tide event and minimises associated risks to personal safety and property. AO2.1 Development within a coastal hazard area is located, designed, constructed and operated to maintain or enhance the community's resilience to defined storm tide events by limiting the exposure of people and structures to associated impacts. AND Given that the development layout of roads and houses is already established, this performance outcome is not relevant to the construction of the revetment wall. Nevertheless, the reconstruction of the revetment wall is proposed to protect road infrastructure and therefore allows the community to become more resilient to coastal hazard impacts. AOQ2.2 Development mitigates any residual impacts from storm tide inundation in a coastal hazard area including by ensuring: (1) habitable rooms of built structures are located above the defined storm tide event level and any additional freeboard level that would ordinarily apply in a flood prone area under a relevant planning scheme standard, or (2) a safe refuge is available for people within the premises during a defined storm tide event, or (3) atleast one evacuation route remains passable for emergency evacuations during a defined storm tide Given that the development layout of roads and houses is already established, this performance outcome is not relevant to the construction of the revetment wall. Nevertheless, reconstruction of the revetment wall will is necessary to reduce potential undermining of the road and therefore increase evacuation routes/reduce recovery time after a surge event, thus satisfying A02.2. State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 1 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.