Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes event, including consideration of the capacity of the route to support the evacuation of the entire local population within a reasonably short timeframe (for example, 12 hours). AND Comment AO2.3 Development within a coastal hazard area is located, designed and constructed to ensure exposed structures can sustain flooding from a defined storm tide event. AND Given that the development layout of roads and houses is already established, this performance outcome is not relevant to the construction of the revetment wall. Nevertheless, reconstruction of the revetment wall will allow the road to sustain flooding. At present the revetment wall is inappropriately constructed/maintained and so the road is being undermined by tidal flows. AO2.4 Essential community service infrastructure is: (1) located so that it is not inundated by a recommended storm tide event specified for that infrastructure, or (2) located and designed to ensure any components of the infrastructure that are likely to fail to function or may result in contamination when inundated by a storm tide (for example, electrical switch gear and motors, water supply pipeline air valves) are: (a) located above the peak water level for a recommended storm tide event, or (b) designed and constructed to exclude storm tide intrusions or infiltration (including by being located in the ground), or (c) able to temporarily stop functioning during a recommended storm tide event without causing significant adverse impacts to the infrastructure or the community. AND na AO2.5 Emergency services infrastructure and emergency shelters, police facilities, and hospitals and associated facilities have an emergency rescue area above the peak water level for a recommended storm tide event. na PO3 Development directly, indirectly and cumulatively avoids an unacceptable increase in the severity of the coastal hazard, and does not significantly increase the potential for damage on the premises or to other premises. AOQ3.1 Development avoids increasing the number of premises from which people would need to be evacuated to prevent death or injury from a defined storm tide event. Reconstruction of the revetment wall will not increase the number of premises from which people would need to be evacuated. Infact, reconstruction of the revetment wall is necessary to prevent road collapse and associated injuries that could be sustained in the event the road fails due to inadequate protection associated with the existing revetment State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 2 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.