Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

    

Performance outcomes

 

  

Acceptable outcomes

and include a statement of why nourishment (in whole or part)
has not been adopted as the preferred means of controlling the
erosion risk.

AND

   

Response

  
   

beret

 

AO5.5 Development involving reclamation:

(1) does not alter, or otherwise minimises impacts on,
the physical characteristics of a waterway or the
seabed near the reclamation, including flow regimes,
hydrodynamic forces, tidal water and riverbank
stability

(2) is located outside the active sediment transport area,
or otherwise maintains sediment transport processes
as close as possible to their natural state

(3) ensures activities associated with the operation of the
development maintain the structure and condition of
vegetation communities and avoid wind and water
run-off erosion.

Editor's note: Applications for reclamation should be supported

by a report certified by an RPEQ that demonstrates how the

engineering solutions sought by the work will be achieved

na

 

PO6 Erosion prone areas in a coastal
management district are maintained as
development free buffers, or where
permanent buildings or structures exist,
coastal erosion risks are avoided or
mitigated.

 

AO6.1 Development locates built structures outside the
part of the coastal management district that is the erosion
prone area unless the development is listed under AO1.1
(1) -().

AND

The development meets AO1.1 (2). Repair of the revetment
is necessary to protect existing permanent structures.

 

AO6.2 Development is located outside the erosion prone
area unless it is redevelopment.

AND

The revetment is replacement of an existing structure.

 

AO6.3 Coastal-dependent development:

(1) locates, designs and constructs relevant buildings or
structures to withstand coastal erosion impacts,
including by use of appropriate foundations, or

(2) installs and maintains coastal protection works to
mitigate adverse impacts to people and permanent
structures from coastal erosion at the location.

AND

The revetment is necessary to protect the adjoining road
from coastal erosion and therefore complies with AO6.3.

 

 

AO6.4 Development that is temporary, readily relocatable
or able to be abandoned, or essential community service

 

 

Na. The revetment wall will facilitate repair and
reinstatement of existing infrastructure.

 

 

State development assessment provisions
10 October 2014 V1.5

Module 10 — Coastal protection

10.1 Tidal works, or development in a coastal management district state code

Page 5 of 16

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.