Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes AND Response Cerys AO5.2 Development in a storm tide inundation area is located, designed, constructed and operated to: (1) maintain dune crest heights, or where a reduction in crest heights cannot be avoided, mitigate risks to development from wave overtopping and storm tide inundation (2) maintain or enhance coastal ecosystems and natural features, such as mangroves and coastal wetlands, between the development and tidal waters, where the coastal ecosystems and natural features protect or buffer communities and infrastructure from storm tide inundation. AND AO5.3 Redevelopment of built structures in the erosion prone area within a coastal management district: (1) avoids intensifying the use of the premises, or (2) demonstrates that any intensification of use will not result in an increase in the need for erosion control structures or riverbank hardening. AND The redevelopment is replacement of an existing revetment wall/erosion control structure. The net amount of riverbank hardening will not increase. AO5.4 Development that is coastal protection work involves: (1) beach nourishment undertaken in accordance with a program of beach nourishment works that source sediment of a suitable quality and type from outside the active beach system, or (2) the construction of an erosion control structure, where it is demonstrated that installing an erosion control structure is the only feasible option for protecting permanent structures from coastal erosion and those structures cannot be abandoned or relocated in the event of coastal erosion occurring. Editor’s note: Applications for coastal protection work should be supported by a report certified by a Registered Professional Engineer of Queensland (RPEQ) that demonstrates how the engineering solution sought by the work will be achieved. Editor’s note: Applications for erosion control structures should demonstrate the consideration of beach nourishment techniques, The proposal complies with AO5.4. The road that the revetment wall is protecting cannot be abandoned. State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 4 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.