Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes from tidal water with public areas or public access facilities, or (3) maintains existing public access (including public access infrastructure that is in the public interest) through the site to the foreshore for: (a) pedestrians, via access points including approved walking tracks, boardwalks and viewing platforms, or (b) vehicles, via access points including approved roads or tracks. AND Response Comment AO10.2 Development adjacent to state coastal land, including land under tidal water: (1) is located and designed to: (a) allow safe and unimpeded access to, over, under or around built structures located on, over or along the foreshore (b) ensure emergency vehicles can access the area near the development, or (2) minimises and offsets any loss of access to and along the foreshore within two kilometres of the existing access points, and the access is located and designed to be consistent with (1)(a) and (b). AND Repair of the revetment wall will improve reliability and safety of access A010.3 Any parts of private development that extend over tidal water are to be designed, constructed and used for marine access purposes only. Na-proposed works are not for private purposes PO11 Private marine development avoids structures attaching to, or extending across, non-tidal state coastal land abutting tidal waters. AO11.1 Private marine development and other structures such as decks or boardwalks for private use do not attach to, or extend across state coastal land that is situated above the high water mark. Editor's note: For occupation permits or allocations of State land, refer to the Land Act 1994. Na-proposed works are not for private purposes PO12 Further development of artificial waterways avoids or minimises adverse impacts on coastal resources and their values, and does not contribute to: A0O12.1 The design, construction and operation of artificial tidal waterways maintains the tidal prism volume of the natural waterway to which it is connected. AND Na — the proposal is not for development of an artificial waterway State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.