Skip to the record
The gold standard in government transparency.

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance outcomes

Acceptable outcomes
from tidal water with public areas or public access
facilities, or

(3) maintains existing public access (including public
access infrastructure that is in the public interest)
through the site to the foreshore for:

(a) pedestrians, via access points including
approved walking tracks, boardwalks and
viewing platforms, or

(b) vehicles, via access points including approved
roads or tracks.

AND

Response

Comment

 

AO10.2 Development adjacent to state coastal land,
including land under tidal water:
(1) is located and designed to:

(a) allow safe and unimpeded access to, over,
under or around built structures located on, over
or along the foreshore

(b) ensure emergency vehicles can access the
area near the development, or

(2) minimises and offsets any loss of access to and
along the foreshore within two kilometres of the
existing access points, and the access is located and
designed to be consistent with (1)(a) and (b).

AND

Repair of the revetment wall will improve reliability and
safety of access

 

A010.3 Any parts of private development that extend over
tidal water are to be designed, constructed and used for
marine access purposes only.

Na-proposed works are not for private purposes

 

PO11 Private marine development
avoids structures attaching to, or
extending across, non-tidal state coastal
land abutting tidal waters.

AO11.1 Private marine development and other structures
such as decks or boardwalks for private use do not attach
to, or extend across state coastal land that is situated
above the high water mark.

Editor's note: For occupation permits or allocations of State land,
refer to the Land Act 1994.

Na-proposed works are not for private purposes

 

 

PO12 Further development of artificial
waterways avoids or minimises adverse
impacts on coastal resources and their
values, and does not contribute to:

 

A0O12.1 The design, construction and operation of artificial
tidal waterways maintains the tidal prism volume of the
natural waterway to which it is connected.

AND

 

Na — the proposal is not for development of an artificial
waterway

 

 

 

State development assessment provisions
10 October 2014 V1.5

Module 10 — Coastal protection

10.1 Tidal works, or development in a coastal management district state code
Page 10 of 16

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.