Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes
erosion
(2) degradation of water quality
(3) degradation and loss of matters of
state environmental significance
wetlands, fish habitat areas and
migratory species habitat).
(1) an increase in the risk of flooding or
Acceptable outcomes
AO12.2 The design, construction and operation of artificial
tidal waterways does not increase risk from flooding.
AND
Response
Cory g
(including, but not limited to, coastal
A012.3 The design, construction and operation of an
artificial waterway in connection with the reconfiguration of
a lot ensures:
(1) water inlet and outlets structures are of sufficient
capacity to maintain the water quality within the
waterway
(2) water discharged from the artificial waterway protects
the environmental values and water quality objectives
of the receiving waters
(3) dredged material is not disposed of to tidal water
beyond the artificial waterway unless there is a
beneficial reuse, e.g. beach nourishment.
Editor's note: For more information on environmental values and
water quality objectives see Schedule 1 of the Environment
Protection (Water) Policy 2009.
AND
na
AO12.4 The location of the artificial waterways avoids
matters of state environmental significance, or does not
result in any significant adverse impact on matters of state
environmental significance.
na
PO13 Development does not involve
reclamation of land below tidal water,
other than for the purposes of:
(1) coastal-dependent development,
public marine development or
community infrastructure
(2) strategic ports, boat harbours or
strategic airports and aviation
facilities, in accordance with a
state or region and no feasible
alternative exists
coastal protection work or work
(3)
statutory land use plan, where there
is a demonstrated net benefit for the
No acceptable outcome is prescribed.
The proposal is for coastal protection work and meets
PO13 (3)
State development assessment provisions
10 October 2014 V1.5
Module 10 — Coastal protection
10.1 Tidal works, or development in a coastal management district state code
Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.