Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes land surrender for freehold land to the satisfaction of the chief executive administering the Land Act. ler g PO2 Development maintains or enhances general public access to or along the foreshore, unless this is contrary to the protection of coastal resources or public safety. AOQ2.1 Reconfiguring a lot that abuts the foreshore or tidal waters is designed to enhance public access if it involves the creation of 10 or more lots or the opening of anew road, unless it is for coastal-dependent development. PO3 Development in connection with a canal enhances public access to coastal waters. AOQ3.1 The canal avoids intersecting with land or tidal land where the passage, use or movement of vessels in water could be restricted by the registered proprietor of the land. AND AO3.2 The area of the canal relating to the development is surrendered to the State as a public waterway. AND AO3.3 The plans of subdivision for the canal are consistent with Requirements for plans of subdivision of an artificial waterway, Department of Environment and Heritage Protection, 2013. State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 16 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.