Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance outcomes Acceptable outcomes Response Comment PO10 Development avoids or minimises | AO10.1 Development demonstrates best practice any adverse impacts on environmental environmental management to meet relevant values and water quality objectives for environmental values and water quality objectives of the receiving waters (surface and Environmental Protection (Water) Policy or relevant to the groundwater) from pollutants on site or ERA to be carried out on the site. leaving a site located in a strategic environmental area. OR AO10.2 All stormwater, wastewater, discharges and overflows leaving the site are: (1) treated to the quality of the receiving waters prior to discharge, OR; (1) reclaimed or re-used such that there is no export of pollutants to receiving waters.No acceptable outcome is prescribed. Table 10.1.3: Reconfiguring a lot eta celduir Ure MelUl Cexey T=} Acceptable outcomes Response Comment PO1 Erosion prone areas in a coastal management district are maintained as development free buffers, or where permanent buildings or structures exist, coastal erosion risks are avoided or mitigated. AO1.1 Where reconfiguring a lot is proposed within the coastal management district, the erosion prone area within the lot, or land within 40 metres of the foreshore (whichever is greater), is surrendered to the State for public use unless: (1) the development is in a port or is for coastal- dependent development, or (2) the surrender of the land will not enhance coastal management outcomes, for example, because there is already substantial development seaward of the lot. Editor's note: Land surrendered to the State for public use under AO1.1 is to be: (1) placed in a State land reserve for beach protection and coastal management purposes under the Land Act 1994, with local government as trustee, or (2) managed for beach protection and coastal management purposes under another management regime to the satisfaction of the chief executive administering the Sustainable Planning Act 2009 and Land Act 1994, if it is demonstrated that AO1.1(1) cannot be reasonably achieved. (3) The Land Act 1994 also includes provisions for voluntary State development assessment provisions 10 October 2014 V1.5 Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code Page 15 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.