OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance
Specific Outcome
AC haractemandlamenitya General:
2.1 Prescribed tidal work not in a canal
and for a private purpose is
compatible with its location, having
regard to the following—
(a) the character and amenity of the
work’s immediate surroundings
and the locality within which the
work is located;
(b) if the relevant planning scheme
states the desired character or
amenity for the work’s
immediate surroundings or the
locality within which the work
is located—the stated desired
character or amenity.
= proschibe ditida mworkenon Malcanal
A probable Solution
The design and construction of the
prescribed tidal work is consistent with
the following standards—
(a) subject to paragraph (e), prescribed
tidal work does not extend past the
side boundary or extended side
boundary of the lot connected to the
work;
(b) subject to paragraph (e), prescribed
tidal work is the only work of its
type along the edge of the tidal
water fronting the lot connected to
the work;
(c) subject to paragraph (e}, prescribed
tidal work that is a boardwalk or
independent deck is not roofed;
(d) subject to paragraph (e), prescribed
tidal work other than a boardwalk
or deck is not roofed unless it is the
main access to land;
{e) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph
(a), (b), (c) or (d)—the relevant
planning scheme standard, to the
extent it is more stringent than the
standard mentioned in paragraph
(a), {b), (c) or (d);
(f) any other relevant planning scheme
standard that is not inconsistent
with the standards mentioned in
paragraphs (a) to (e).
Comments
Not for a private purpose
2.2 Prescribed tidal work not in a canal
and for a non-private purpose is
compatible with its location, having
regard to the following—
(a) the character and amenity of the
The design and construction of the
prescribed tidal work is consistent with
the following standards—
(a) subject to paragraph (c), prescribed
tidal work used for a commercial
The planning scheme accepts that that the area where the
works are proposed is substantially modified from its natural
state and that the area is to provide for social needs and
accessibility to recreational opportunities.
The proposed revetment wail will be made of similar rock to
: 1|Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.