Skip to the record
The gold standard in government transparency.

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

 
 

Specific Outcome

work’s immediate surroundings
and the locality within which the
work is located;

(b) if the relevant planning scheme
states the desired character or
amenity for the work’s

immediate surroundings or the
locality within which the work

is located—the stated desired
character or amenity.

 

.1 Prescribed tidal work is of a height,
scale and size to ensure the work is
compatible with the character and
amenity of its location, having regard to
the following—

(a) the height, scale and size of the
natural features of the work’s immediate
surroundings and the locality within
which the work is located;

(b) the height, scale and size of the
existing buildings or other

structures in the work’s

immediate surroundings and the

locality within which the work

is located;

(c) if the relevant planning scheme
states the desired height, scale or size

 

jalactelsanalanie nitva Me lghiteca lela ngise

 

A probable Solution

purpose does not extend past the
side boundary or extended side
boundary of the lot connected to the
work;

(b) subject to paragraph (c), prescribed
tidal work used for a commercial
purpose is not roofed unless it is the
main access to land;

(c) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph (a)
or (b)}—the relevant planning

scheme standard, to the extent the
standard is more stringent than the
standard mentioned in paragraph (a)
or (b);

(d) any other relevant planning scheme
standard that is not inconsistent

with the standards mentioned in

 

     

The height, scale and size of the
prescribed tidal work is consistent with
each relevant planning scheme standard.

 

re LLLS LESS)

the existing revetment walls on either side of the proposed
works and therefore will be consistent with the existing
visual character and amenity of the immediate
surroundings. The repair of the revetment wall and footpath
will ensure safe pedestrian access for pedestrians walking
alongside the river to maintain socia! and recreational
purposes.

  

The proposed revetment wall will be made of similar rock to
the existing revetment walls on either side of the proposed
works and therefore will be consistent with the existing
visual character and amenity of the immediate
surroundings.

There is no particular planning scheme standard specific to
the type of revetment wall proposed. However, it is relevant
to note that the revetment wall is designed by Noosa
Council's inhouse designers and signed off by the in house
RPEQ who will be responsible for maintenance of the wall.

 

 

~ 2|Page

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.