Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

Specific Outcome

A probable Solution

mentioned in paragraph

intra SinUc tune witic ding maccessmpamking SeNe Lag eranOlWalenmsenvic

  

11.1 Prescribed tidal work has
appropriate infrastructure, including, in
particular, road access, parking
facilities, sewerage services and water
services, having regard to—

(a) the nature and scale of the work;
and

(b) the number of people that may be on
or at the work at any time; and

(c) the number of vehicles that may be
on or moored at the work at any time;
and

(d) the protection of any foreshores near
the work and the vegetation and marine
lants on the foreshores.

 

   
 

12.1 Prescribed tidal work is designed
and constructed in a way to ensure it is
structurally sound, having regard to
the following—

(a) relevant engineering standards;

(b) the location of the work;

(c) the purpose for which the work is to
be used;

(d) the impact of flooding, tidal
influences and hydrodynamic
changes.

aDeSigndconstiuctionfanclsatetyseallpre scribe diidalwo

 

The infrastructure for prescribed tidal work
is consistent with each relevant planning
scheme standard.

The design and construction of the
prescribed tidal work is consistent with the
following standards—

(a) subject to paragraph (b), each
Australian Standard relevant to the design
or construction of structures,

to the extent requirements stated in the
Standard apply to the design or
construction of prescribed tidal work;

(b) if a relevant planning scheme standard
is more stringent than any standard
mentioned in paragraph

{a)—the relevant planning scheme
standard, to the extent it is more stringent
than the standard mentioned in paragraph

(a).

 

 
 

Comments

Noosa Councils in house RPEQ has certified the design and
will certify the construction.

 

12.2 Prescribed tidal work does not
adversely affect the structural integrity
of any existing revetment or seawall or
another existing structure.

 

The design and construction of the
prescribed tidal work is consistent with
the following standards—

(a) subject to paragraph (b), prescribed

 

 

The only structure connected to the revetment wall is the
footpath. The footpath is proposed to be founded on natural
ground behind the revetment wall and therefore not impose
a surcharge load on the revetment wall.

 

 

8|Page

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.