Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance
Specific Outcome
A probable Solution
mentioned in paragraph
intra SinUc tune witic ding maccessmpamking SeNe Lag eranOlWalenmsenvic
11.1 Prescribed tidal work has
appropriate infrastructure, including, in
particular, road access, parking
facilities, sewerage services and water
services, having regard to—
(a) the nature and scale of the work;
and
(b) the number of people that may be on
or at the work at any time; and
(c) the number of vehicles that may be
on or moored at the work at any time;
and
(d) the protection of any foreshores near
the work and the vegetation and marine
lants on the foreshores.
12.1 Prescribed tidal work is designed
and constructed in a way to ensure it is
structurally sound, having regard to
the following—
(a) relevant engineering standards;
(b) the location of the work;
(c) the purpose for which the work is to
be used;
(d) the impact of flooding, tidal
influences and hydrodynamic
changes.
aDeSigndconstiuctionfanclsatetyseallpre scribe diidalwo
The infrastructure for prescribed tidal work
is consistent with each relevant planning
scheme standard.
The design and construction of the
prescribed tidal work is consistent with the
following standards—
(a) subject to paragraph (b), each
Australian Standard relevant to the design
or construction of structures,
to the extent requirements stated in the
Standard apply to the design or
construction of prescribed tidal work;
(b) if a relevant planning scheme standard
is more stringent than any standard
mentioned in paragraph
{a)—the relevant planning scheme
standard, to the extent it is more stringent
than the standard mentioned in paragraph
(a).
Comments
Noosa Councils in house RPEQ has certified the design and
will certify the construction.
12.2 Prescribed tidal work does not
adversely affect the structural integrity
of any existing revetment or seawall or
another existing structure.
The design and construction of the
prescribed tidal work is consistent with
the following standards—
(a) subject to paragraph (b), prescribed
The only structure connected to the revetment wall is the
footpath. The footpath is proposed to be founded on natural
ground behind the revetment wall and therefore not impose
a surcharge load on the revetment wall.
8|Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.