OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance
Specific Outcome
RBublicfaccessmasatet
9.1 The location and design of
prescribed tidal work does not adversely
affect the safety of members of the
public accessing the foreshores.
Rei
10.1 Prescribed tidal work does not
adversely affect navigable access to, or
navigable egress from, any non-tidal
work lot.
GablEVACCO SSM ONOMCOLOSS Om MON dA WOnol
A probable Solution
mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more stringent
than the standard mentioned in paragraph
(a);
(c) any other relevant planning scheme
standard that is not inconsistent with the
standards mentioned in paragraphs (a)
and (b
Public access to foreshores near the
prescribed tidal work is consistent with
each relevant planning scheme standard.
The design and construction of the
prescribed tidal work is consistent with the
following standards—
(a) subject to paragraph (b), if the lot
connected to prescribed tidal work
{the connected lot) adjoins a
non-tidal work lot, the work does
not extend past the connected lot's
side boundary, or extended side
boundary, adjoining the non-tidal
work lot;
(b) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more
stringent than the standard
ere La ly
e The design of the footpath is 2m wide concrete.
e Compliant grades and 2% crossfalls
These details are shown on Drawing 0000009 Sheet 03.
As shown on Drawing 0000009 Sheet 03, the following
aspects of the design will allow the pathway to comply with
Noosa Planning Scheme Policy 5:
¢ The section of footpath is part of the overall pathway
network that provides access between the restaurant
and recreation areas of Gympie Terrace to
Backpackers, camping grounds etc.
e The design of the footpath is 2m wide concrete.
The works extend past the side boundary of the adjoining non-
tidal work lot. However they do not extend beyond established
quay line and will not adversely affect navigable access and
egress to the non-tidal work allotment. The location of tidal works
in relation to the established quay line is shown on Drawing
0000009 Sheet 03 Rev A.
7/Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.