Coastal Protection and Management Regulation 2003
Schedule 4A Assessment of Compliance

 

Specific Outcome

RBublicfaccessmasatet
9.1 The location and design of
prescribed tidal work does not adversely
affect the safety of members of the
public accessing the foreshores.

 

Rei
10.1 Prescribed tidal work does not
adversely affect navigable access to, or
navigable egress from, any non-tidal
work lot.

 

 

 
 
  

GablEVACCO SSM ONOMCOLOSS Om MON dA WOnol

 

A probable Solution

mentioned in paragraph

(a)—the relevant planning scheme
standard, to the extent it is more stringent
than the standard mentioned in paragraph
(a);

(c) any other relevant planning scheme
standard that is not inconsistent with the
standards mentioned in paragraphs (a)
and (b

  
 

Public access to foreshores near the
prescribed tidal work is consistent with
each relevant planning scheme standard.

   

The design and construction of the
prescribed tidal work is consistent with the
following standards—

(a) subject to paragraph (b), if the lot
connected to prescribed tidal work

{the connected lot) adjoins a

non-tidal work lot, the work does

not extend past the connected lot's

side boundary, or extended side
boundary, adjoining the non-tidal

work lot;

(b) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more

stringent than the standard

 

 

ere La ly
e The design of the footpath is 2m wide concrete.
e Compliant grades and 2% crossfalls

These details are shown on Drawing 0000009 Sheet 03.

  

As shown on Drawing 0000009 Sheet 03, the following
aspects of the design will allow the pathway to comply with
Noosa Planning Scheme Policy 5:
¢ The section of footpath is part of the overall pathway
network that provides access between the restaurant
and recreation areas of Gympie Terrace to
Backpackers, camping grounds etc.
e The design of the footpath is 2m wide concrete.

The works extend past the side boundary of the adjoining non-
tidal work lot. However they do not extend beyond established
quay line and will not adversely affect navigable access and
egress to the non-tidal work allotment. The location of tidal works
in relation to the established quay line is shown on Drawing
0000009 Sheet 03 Rev A.

 

 

 7/Page

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.