Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Coastal Protection and Management Regulation 2003

Schedule 4A Assessment of Compliance

 

Specific Outcome

A probable Solution

(b) subject to paragraph (c), the bottom
edge of the base of a retaining wall,
revetment or seawall is reasonably
likely to prevent any adverse effects
from potential erosion of the soil
under the retaining wall, revetment
or seawall for at least 50 years;

(c) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph (a)
or (b)—the relevant planning
scheme standard, to the extent it is
more stringent than the standard
mentioned in paragraph (a) or (b).

Comments

 

 

19.4 Prescribed tidal work that is a
retaining wail, revetment or seawall, is
not adversely affected by hydrostatic
pressure behind the retaining wall,
revetment or seawall.

 

The design and construction of the
retaining wall, revetment or seawall is
consistent with the following

standards—

(a) subject to paragraph (b), airetaining
wall, revetment or seawall provides for
drainage holes, and suitable filter material
behind the holes, to

telieve any hydrostatic pressure

behind the retaining wall, revetment or
seawall;

(b) if a relevant planning scheme standard
is more stringent than the

standard mentioned in paragraph
(a)—the relevant planning scheme
standard, to the extent it is more
stringent than the standard

mentioned in paragraph (a).

 

Geotextile behind the rock wall will provide necessary
protection against hydrostatic pressure.

 

15|Page

 

 

Used in these records

About this file

File size
14.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW1_0370 Operational Works Application for Prescribed Tidal Works.pdf · 14.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.