Council archive · source document
OPW1/0370 Operational Works Application for Prescribed Tidal Works · OPW14/0370
Very large file (14.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Coastal Protection and Management Regulation 2003 Schedule 4A Assessment of Compliance Specific Outcome A probable Solution standard, to the extent it is more stringent than the standard mentioned in paragraph (a). Comments 19.2 Prescribed tidal work that is a retaining wall, revetment or seawall, is designed and constructed in a way to ensure it can withstand— (a) any tendency of overturning or sliding; and (b) any other effects of waves or changes in water levels on the retaining wall, revetment or seawall. (s 6(2) solution) The design and construction of the retaining wall, revetment or seawall is consistent with the following standards— (a) subject to paragraph (c), a retaining wall, revetment or seawall has a factor of safety of no less than 1.5; (b) subject to paragraph (c), a retaining wall, revetment or seawall is able to withstand the effect of waves, or waves and water levels, resulting from a storm or other natural event of a magnitude that has a 2%.or lower probability of occurring in any calendar year; : (c) if a relevant planning scheme standard is more stringent than the standard mentioned in paragraph (a) or (b}—the relevant planning scheme standard, to the extent it is more stringent than the standard mentioned in paragraph (a) or (b). The RPEQ responsible for the project has certified the design of the proposed works is in accordance with the projects objectives. The objectives require structural integrity adequate for the purpose. 19.3 Prescribed tidal work that is a retaining wall, revetment or seawall not founded upon rock, is designed and constructed to protect the seaward side of retaining wall, revetment or seawall from erosion. (s 6(2) solution) The design and construction of the retaining wall, revetment or seawall is consistent with the following standards— (a) subject to paragraph (c), a.retaining wall, revetment or seawall provides for a sub-layer or enough filter material to ensure it is reasonably likely to remain in place for at ieast 50 years; The construction technique for the revetment wall is detailed on Drawing 0000009 Sheet 09 and certified by the inhouse RPEQ to meet the project objectives. 14/Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW1/0370 Operational Works Application for Prescribed Tidal WorksRelated documentApplication case desk ↗
About this file
- File size
- 14.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.