Appendix H - Slope Stability Assessment
Brett Hage 22328-001-Rev0
14 September 2022
Detailed design of the effluent disposal systems must be carried out by a NC registered evaluator to
accompany the plumbing application at the building stage, once the building designs are finalised.
5.3.4 Maintenance and Inspection
Operation and maintenance of a HSTP is the responsibility of the property owner. A licensed service agent
must be appointed to undertake routine servicing works in line with regulatory authority approval conditions.
To comply with NC requirements, the following management and inspection shall be implemented once the
effluent disposal systems are established:
Continuous monitoring by the property owner for any signs of system failure such as septic odour,
seepage, soil and/or plant discoloration.
Should any signs of system failure be observed by the property owner, including the in-built HSTP
failure alarm, the manufacturer shall be contacted immediately to arrange for the necessary repairs.
Quarterly inspection, testing and repair (if necessary) to the HSTP and irrigation area by a Licensed
Inspector (normally a service provided by the HSTP manufacturer).
6.0 SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
impacting the proposed development. This advice is subject to implementation of the recommendations
given in this report.
This assessment relates only to the proposed subdivision for the development application
process. Existing structures, batter slopes and road connections may be subject to risk of slope
instability but assessment of those matters was beyond the scope of our commission. Also excluded
from this assessment are any future building works, which would be subject to site specific assessment
and review by a geotechnical RPEQ prior to construction.
7.0 LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.
Please contact the undersigned should you wish to discuss any of the above matters.
Yours faithfully
TECTONIC GEOTECHNICAL PTY LTD
Robert Gibb BSc (Hons) Ashley Davey BEng (Geological) RPEQ 8159
Engineering Geologist Principal Geotechnical Engineer
Attachments: Figure 1 – Site Plan
Borehole Logs & Explanatory Notes
Laboratory Test Certificate
Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction
Limitations
19/19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.