Original source · versioned page text
Compiled Reference Document - MCU25/0020 (As Published)
ADG Consulting Pty Ltd and at the frequencies stated in Section 6.5.2. Groundwater monitoring bores for groundwater level gauging external to the excavation footprint are expected to be unable to be established and monitored prior to and during construction on the site, due to limited space (SCG Consulting Engineers). Architectural plans of the proposed development and basement arrangement are provided at Appendix C. 5.6 Groundwater treatment All extracted groundwater will be treated on-site using available technologies prior to discharge to the stormwater network. The following treatment measures (or similar depending on final dewatering contractor selection) will be adopted, and will be installed and operational prior to the commencement of dewatering: 1. A groundwater pH buffering treatment system (primary treatment) 2. A sedimentation tank to provide additional residence time and sedimentation (secondary treatment). 3. Installation of fine media filtration to retain suspended sediments and/or heavy metals (tertiary treatment), if required. Details of the treatment systems and methodologies are provided in Section 6 of this report. Note: Consideration should be taken, regarding placement of treatment gear on site to enable easy cleaning and maintenance throughout the dewatering phase for the project. Consider the potential requirement for regular de-sludging of sedimentation tank/s to suitable area onsite, if available (cost minimisation). 5.7. Nominated Hold Points In accordance with anticipated DA Conditions, nominated hold points to be enacted during construction have been proposed to facilitate for certification by the suitably qualified person experienced with Acid Sulfate Soils, as well as Council Development Engineer to ensure all possible avenues for continual dewatering below permanent groundwater level, including around pipework bedding that outlet to waterways, are appropriately sealed. The nominated hold points regarding dewatering for this project are: 1. Prior to commencement of dewatering/initial pump out 2. At finished excavation level, prior to blinding layer application 3. External to basement service installation trench opening/s prior to backfilling. The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with council representatives and the Site Manager. ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.