Original source · versioned page text
Compiled Reference Document - MCU25/0020 (As Published)
ADG Consulting Pty Ltd 6 Water quality management 6.1 Responsibility The Site Manager is ultimately responsible for implementing the water quality management procedures described in this DMP. 6.2 Operational policy To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to discharge from the site. 6.3 Performance criteria The performance criteria for the discharge of extracted groundwater are the water quality objectives provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the environmental values of the waterway are maintained. Receiving waters data will also be assessed against background monitoring data if non-compliant results are obtained at the receiving waters monitoring location. 6.4 Implementation strategy All extracted groundwater will be treated on-site using available technologies prior to discharge to the stormwater network. The treatment system described in Section 6.4.1 will be adopted, installed and operational prior to the commencement of dewatering. 6.4.1 Groundwater treatment systems Subject to final appointment of shoring and dewatering contractors (who all generally have different treatment systems), the following treatment systems are generally proposed for dewatered groundwater treatment prior to discharge. Regardless of the contractor employed, groundwater treatment systems should be installed with capability for treating flow rates of up to 10 to 12 L/sec, as a contingency against higher than anticipated flow rates exceeding the estimated 9 L/sec as a result of varying ground conditions across the extent of excavation or construction during wet weather. Primary treatment A groundwater treatment system will be installed to provide primary treatment of the extracted groundwater. The system will provide the following capabilities: A baffled treatment tank with 5 kL minimum capacity Automated in-line chemical dosing systems for the addition of buffering solutions and coagulants A filtration system to reduce fine particulates (if required) Emergency response alarms for non-routine situations. FWnNr Based on the estimated extraction rate, this system will provide approximately nine minutes contact time during the initial chemical dosing, prior to secondary treatment using a sedimentation tank. Primary treatment tank will be vertically stacked on the secondary treatment tank wherever practicable to minimise site area required for groundwater treatment equipment. Secondary treatment A 23 kL sedimentation tank will be utilised to provide the necessary residence time for secondary treatment of the groundwater prior to discharge to the stormwater system. Based on the estimated groundwater extraction rate of approximately 32,400 L/hr (equivalent 540 L/min) from Section 5.3.1 of this Report, one sedimentation tank will provide approximately fourty-two minutes retention time following primary treatment of the extracted groundwater. This is considered to be sufficient secondary settling / retention time based on extensive prior experience on other sites in similar ground conditions. ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.