Original source · versioned page text
P0025138_500 PL-PL-503
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
PLOT STYLE: URBIS_A1.CTB
EXTENT OF WORKS
Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2 Fe2
Fe
1
13 CAR apr
Fe
16 DIA cae
1
10 DIA rev 3 CAR apr
E2
16 LOM lon 3 DIA cae
PAGE SETUP: ----
6 PHI xan 2 DIA rev
Fe
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 3 LOM lon
1
1 PHI xan
E2
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2
E2
Fe
E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 E2 29 CAR apr
1
E2
36 DIA cae
E2
22 DIA rev
E2
Fe
3 XAN joh^ 36 LOM lon
E2
1
Fe
15 PHI xan
4
E2
37 CAR apr
E2
PLOTTED BY: ELISE LIM
1 CYA tha 47 DIA cae E2
Fe
1 XAN joh^
E2
28 DIA rev
1
Fe
E2
4
47 LOM lon E2
E2
19 PHI xan E2
E2
REFER TO PL-502
Fe
E2
1
Fe E2
4 E2
E2
E2
E2
2 MAC mo Fe
4 E2
Fe
E2
1
4 XAN joh^ E2
E2
Fe
4 E2
E2
2 MAC mo E2
Fe E2
Fe
4
1 LIC ram
1
E2
E2
Fe E2
4
PLOT DATE: 26.05.2023
E2
UP
E2
Fe
5 CAR app (tube)
1
E2
5 LOM hys
E2
Fe
5 GAH asp 3 XAN joh^
E2
4
E2
E2
Fe
1
E2
Fe
EX
E2
4
E2 E2 E2 E2
E2
TE
Fe
NT
1 CYA tha
1
E2
Fe
OF
4
E2 E2 E2 E2 E2 E2 E2
W
Fe4 Fe4 Fe4
OR
FE05B
Fe
27 CIS hyp 1 XAN joh (1)
KS
1
PATH: \\file03.urbis.local\Projects\PROJECTS\P0020000\P0025138_Sunrise Beach RAC\10_Construction Docs\4.02_CAD\Layouts\P0025138_500 PL.dwg
3 COR pet
FE05B
Fe
1
1 CYA tha 3 PHI xan
Fe
FE05B
1
5 XAN joh^
Fe
4 XAN joh^
1
FE05B
1 MAC luc 65 FIC nod
65 JUN usi
Fe
56 LOM hys
1
3 COR pet
FE05B
64 DIA cae
Fe
1
51 LIR mus 2 XAN joh (1)
64 MOL cap
FE05B
34 PHI xan REFER TO 504PL FOR PLANTING
Fe
25 VIO hed
1
FE05B
Fe
2 XAN joh^
1
1 CYA tha
Fe
FE05B
1
1 MAC mo
Fe
201 CAR app (tube)
1
FE05B
2 LIC ram REFER TO 504PL FOR PLANTING
1 XAN joh (0.5) 201 LOM hys
1 XAN joh^ 172 GAH asp
1 XAN joh^
Fe
1
FE05B
2 XAN joh^ REFER TO PL-504 1 XAN joh^
Fe
1 LIN mon
1
SCALE: 1:300
PROJECT KEY PLAN . . . . . DISCLAIMER CLIENT ISSUE PROJECT NO.
Copyright by Urbis Pty Ltd. This drawing or parts thereof may not be reproduced
. . . . .
for any purpose or used for another project without the consent of Urbis other than SUNRISE BEACH FOR CONSTRUCTION P0025138
SUNRISE See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 section
Section 2
BEACH .
.
.
.
.
.
.
.
.
.
reproduction for the purposes of actual ordering, supply, installation or construction.
This drawing must be read in conjunction with all relevant contracts, schedules,
. SCALE NORTH
. . . . .
FOR CONSTRUCTION . . . . .
specifications, drawings and any other issued written instructions. Do not scale
from drawings. Written figured dimensions take preference to scaled dimension
. 1:100 @ A1 1:200 @ A3
1 2 3 4 5m
. 03 FOR CONSTRUCTION JM SM 10.10.2022 and must be verified on site before proceeding with any work. All discrepancies
. 02 FOR TENDER JC SM 08.10.2021 must be referred to the superintendent for a written decision prior to ordering, DRAWING TITLE DRAWING NO. REVISION
supply or installation. Urbis must be notified in writing of any discrepancies.
01 FOR TENDER JC SM 04.10.2021
Level 32, 300 George Street | Brisbane QLD 4000 Australia | +61 7 3007 3800 | URBIS Pty Ltd | ABN 50 105 256 228 REV DESCRIPTION DWN CHK DATE PROJECT DIRECTOR: GLEN POWER PLANTING PLAN PL-503 03