Original source · versioned page text
P0025138_500 PL-PL-503
Original PDF page 1, section 2. The text section number identifies this passage in the reader.
BEACH .
.
.
.
.
.
.
.
.
.
reproduction for the purposes of actual ordering, supply, installation or construction.
This drawing must be read in conjunction with all relevant contracts, schedules,
. SCALE NORTH
. . . . .
FOR CONSTRUCTION . . . . .
specifications, drawings and any other issued written instructions. Do not scale
from drawings. Written figured dimensions take preference to scaled dimension
. 1:100 @ A1 1:200 @ A3
1 2 3 4 5m
. 03 FOR CONSTRUCTION JM SM 10.10.2022 and must be verified on site before proceeding with any work. All discrepancies
. 02 FOR TENDER JC SM 08.10.2021 must be referred to the superintendent for a written decision prior to ordering, DRAWING TITLE DRAWING NO. REVISION
supply or installation. Urbis must be notified in writing of any discrepancies.
01 FOR TENDER JC SM 04.10.2021
Level 32, 300 George Street | Brisbane QLD 4000 Australia | +61 7 3007 3800 | URBIS Pty Ltd | ABN 50 105 256 228 REV DESCRIPTION DWN CHK DATE PROJECT DIRECTOR: GLEN POWER PLANTING PLAN PL-503 03
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original