2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                             Source of   Assessment and
 #               Prompt                             Notes
                                                                                                                             information recommendations.
                                                    Phase 3 additional restoration activities, subject to phase 2 results,   Project
                                                    availability of additional sites and community licence11.                Plan Table
                                                                                                                             1, pg. 10-15
                                                    The MER Plan addresses Phase 2.
                                                    Annual and six-monthly project reporting. The annual project
                                                    report is prepared by TNC, endorsed by the TAG, and presented to
                                                    NSC for approval.
 17              Is an independent party            Evaluation of the Queensland Reef Water Quality Program                  MER Plan       Sufficient.
                 evaluating the project?            recommends independent evaluation as highly desirable for large          pg. 57
                                                    projects ($500K-$10M) or projects of medium risk (Roberts et al.,
                                                    2019).
                                                    An independent evaluation is not proposed for this project. A
                                                    Technical Advisory Group (TAG) has been established. The role of
                                                    the TAG includes providing expert advice to support project
                                                    implementation. The TAG provides a degree of independent
                                                    oversight of the project’s implementation and its evaluation.
 Reporting
 18              Are reporting commitments          Yes, 6-monthly, annual and final project reports are specified in        Project        Met
                 to project partners and            the Project Plan. Table 1 specifies the content of the reports and a     Plan Table
                 investors clear (what, when,       process for the TAG and then Noosa Council to review and                 1, pg. 10-15
                 how)?                              endorse the report.
                                                                                                                             MER Plan
                                                    A reporting template is provided as Annex 5.                             pg. 83-88
 19              Are reporting commitments          27 groups of project stakeholders from government, the                   Project        Met
                 to community stakeholders          community, private sector and research organisations have been           Plan pg. 16
                 clear (what, when, how)?           identified.
                                                                                                                             Project
                                                    A Project Communication Plan is included as Appendix 1.                  Plan pg. 47-
                                                                                                                             50


11
     To be considered after the completion of phase 2.

                                                                                      18
Log in to download the original file

2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.