Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                          Source of   Assessment and
#    Prompt                         Notes
                                                                                                          information recommendations.
                                    Attendance at community and partner events, engagement and            MER Plan
                                    consultation and media engagement will all be tracked and             pg. 71
                                    reported.
20   Are there processes in place   The Project Plan, through regular reporting cycles, includes          Project        Partially met.
     to identify and share          processes for reflecting on the implementation of the oyster          Plan pg. 13-
                                                                                                                         Processes to build on TNC’s
     learnings into future          restoration project.                                                  15
                                                                                                                         networks and experience,
     partnership work and beyond
                                    The Partnership agreement aspires to demonstrate a ‘leading                          and promote Noosa River
     (including other shellfish
                                    example’ of a collaborative alliance that ‘achieves superior                         Plan and the restoration
     restoration projects)?                                                                               Pg. 4
                                    outcomes’.                                                                           project are addressed in the
                                                                                                                         Project Plan (objective A5)
                                    Objective A5 within the Project Plan includes a range of actions to
                                                                                                          Pg. 10         but are not part of the
                                    support Noosa Council, promote the project and develop
                                                                                                                         evaluation plan.
                                    conservation plans. A5 is not currently considered within the MER
                                    Plan (which is focussed on the oyster restoration) but actions will                  The partnering process
                                    be reported on (Table 1).                                                            should also be evaluated
                                                                                                                         and learnings shared. Refer
                                    As well as learning about oyster restoration, the project should
                                                                                                                         recommendation 5.
                                    also evaluate the partnership to support learning and
                                    improvement.




                                                                     19
Log in to download the original file

2020-09-14 GC Agenda - Item 7 - Attachment 2 - Independent Scientific Review of Monitoring and Evaluation Plan(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.