Decision Notice MCU25 0096 & OPW25 0146 (As Published)
Services
28. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
29. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with the conditions of this
Decision Notice, be generally in accordance with Ingeniir’s Proposed Earthworks Layout Plan
(C08 Issue 2) and Proposed Earthworks Sections (C09 Issue 2).
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - STORMWATER, DRAINAGE,
EARTHWORKS, LANDSCAPING & CROSSOVER – OPW25/0146
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Currency Period
2. The currency period for this development approval lapses if the development has not
substantially started by 11 November 2031 unless an application to extend the currency
period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
C04 2 Proposed Site Layout Prepared by 03/11/2025
Ingeniir
C05 2 Proposed Stormwater and Site Level 03/11/2025
Layout Prepared by Ingeniir
C07 2 Proposed Stormwater Details Prepared 03/11/2025
by Ingeniir
C08 2 Proposed Earthworks Layout Plan 03/11/2025
Prepared by Ingeniir
Page 5 of 16