Decision Notice MCU25 0096 & OPW25 0146 (As Published)
C09 2 Proposed Earthworks Layout Plan 03/11/2025
Prepared by Ingeniir
7341_L01- A Landscape Notes & Schedules July 2025
01_A
7341_L03- A Landscape Planting Plan July 2025
01_A
7341_L07- A Landscape Details July 2025
01_A
PRIOR TO COMMENCEMENT OF WORKS
Engineering
4. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
5. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
6. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
7. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
(a) Civil engineering works;
(b) Landscape works;
(c) Erosion and sediment control works;
(d) Other relevant parties
8. A Construction Management Plan must be submitted prior to the prestart meeting and must
address the following:
(a) Traffic management during all phases of construction;
(b) Adequate parking arrangements for works and deliveries;
(c) appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
(d) provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
9. Prior to the commencement of municipal works associated with this development, Council
requires the provision of a bank guarantee, or a cash bond, of not less than 10% (minimum
of $5000) of the value of the municipal works.
10. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
11. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Page 6 of 16
Document Set ID: 24296454
Version: 4, Version Date: 13/11/2025