Decision Notice MCU25 0096 & OPW25 0146 (As Published)

of 16

Page text shows just the words. Original shows the document exactly as it was published.

                        C09             2          Proposed Earthworks       Layout   Plan 03/11/2025
                                                   Prepared by Ingeniir

                        7341_L01-       A          Landscape Notes & Schedules               July 2025
                        01_A

                        7341_L03-       A          Landscape Planting Plan                   July 2025
                        01_A

                        7341_L07-       A          Landscape Details                         July 2025
                        01_A

               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               4.     All necessary approvals from external service providers (e.g. Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               5.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               6.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               7.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      (a)     Civil engineering works;
                      (b)     Landscape works;
                      (c)     Erosion and sediment control works;
                      (d)     Other relevant parties
               8.     A Construction Management Plan must be submitted prior to the prestart meeting and must
                      address the following:
                      (a)     Traffic management during all phases of construction;
                      (b)     Adequate parking arrangements for works and deliveries;
                      (c)     appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      (d)     provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               9.     Prior to the commencement of municipal works associated with this development, Council
                      requires the provision of a bank guarantee, or a cash bond, of not less than 10% (minimum
                      of $5000) of the value of the municipal works.
               10.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               11.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.




                                                                                                      Page 6 of 16
Document Set ID: 24296454
Version: 4, Version Date: 13/11/2025
Log in to download the original file

Decision Notice MCU25 0096 & OPW25 0146 (As Published).pdf · 193 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.