Decision Notice MCU25 0096 & OPW25 0146 (As Published)

of 16

Page text shows just the words. Original shows the document exactly as it was published.

                      Pathways
               22.    All pathways must be constructed in accordance with the following requirements:
                      (a)     All footpath/cycleway must comply with Council’s Standard Drawing RS-065.
                      (b)     Provision must be made for disabled access at all kerb crossings associated with
                              pathways, in accordance with Council's current standards.
                      (c)     All paths must have a slip resistant surface.
                      (d)     Expansion and contraction joints must provide a flush finish. Installation of joints by
                              saw cutting is preferred to ensure a smooth ride for cyclists.
                      (e)     The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               23.    Pathways must:
                      (a)     Terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety.
                      (b)     Be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               24.    Driveway crossovers must be constructed in accordance with the approved plans and
                      generally in accordance with council’s Standard Drawings RS-049, RS-050.
               25.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               26.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      (a)     The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
                      (b)     The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties.
                      (c)     Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      (d)     Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path.
                      (e)     The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               27.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development.
               28.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               29.    Fall protection must be provided to retaining walls that are over 1m high.
               30.    Slope and batters are a maximum grade of:



                                                                                                        Page 8 of 16
Document Set ID: 24296454
Version: 4, Version Date: 13/11/2025
Log in to download the original file

Decision Notice MCU25 0096 & OPW25 0146 (As Published).pdf · 193 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.