Decision Notice MCU25 0096 & OPW25 0146 (As Published)
Landscaping Works
12. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
13. Prior to requesting a pre-start meeting, a condition report of all Council assets, including
stormwater structures, grassed areas, kerb and channel, footpaths, in the frontage of the site
works must be provided to Council.
14. All works must be constructed and work procedure undertaken in accordance with:
(a) The approved plans/documents and conditions detailed in this Decision Notice.
(b) The relevant conditions of the higher order Material Change of Use approval viz.
MCU25/0096 to which this approval relates.
(c) All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
(d) The latest version of Water Sensitive Urban Design Technical Design Guidelines for
South East Queensland (Healthy Waterways) for all water quality devices to be
constructed on site.
15. All tree and vegetation removal works must be undertaken by a qualified person*.
*(Refer to Advisory Note)
DURING CONSTRUCTION
Engineering
16. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
17. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
18. All works must be constructed and work procedure undertaken in accordance with:
(a) The approved plans/documents and conditions detailed in this Decision Notice
(b) All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines
(c) The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site
Works within Road Reserve/Reinstatement
19. Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out construction
works, Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
20. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition to
existing road and verge/footpath profiles.
21. The verge is to be modified such that the maximum crossfall for the verge is 5%, except in
the location of a pathway where the maximum crossfall is to be 2.5%.
Page 7 of 16
Document Set ID: 24296454
Version: 4, Version Date: 13/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original