Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Annual Report 2020-21

of 131

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                              2020 - 21 Annual Report


The following table outlines the trunk infrastructure that was funded through infrastructure charges
during the 2020-21 financial year.

Table 14 – Trunk infrastructure

       Trunk infrastructure        Trunk infrastructure      Locality      Method of        Value
           description                  network                             delivery       ($’000)

      Upgrade existing trunk             Transport         Noosaville      Developer         21.4
     footpath along frontage            (Pathways)

  Upgrade Bus Stop + existing      Transport (Bus Stop     Noosaville      Developer         71.5
  trunk footpath along frontage        & Pathways)

      Upgrade existing trunk             Transport         Noosaville      Developer         2.1
     footpath along frontage            (Pathways)

      Upgrade existing trunk             Transport         Noosaville      Developer         4.4
     footpath along frontage            (Pathways)

   Funding of loan repayment            Transport,           Various         Council       3,046.4
   costs associated with loan          Public Parks,
   funds raised historically to        Stormwater
  construct trunk infrastructure
       in the Noosa Shire

 Upgrade to Bus Stop (Balance)        Transport (Bus        Tewantin         Council        38.4
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus        Tewantin         Council        18.0
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus        Tewantin         Council        10.5
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus        Tewantin         Council        30.0
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus       Noosaville        Council        34.5
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus       Noosaville        Council        26.4
                                          Stops)

 Upgrade to Bus Stop (Balance)        Transport (Bus         Cooroy          Council        24.4
                                          Stops)

      Upgrade to Bus Stop             Transport (Bus        Tewantin         Council        26.0
                                          Stops)

 Upgrade to Bus Stop (Balance)        Transport (Bus        Sunshine         Council        30.0
                                          Stops)             Beach



                                                                                                    Page 59

Log in to download the original (Annual Report 2020-21(PDF, 6MB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.