Original source · versioned page text
Annual Report 2020-21
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
2020 - 21 Annual Report
The following table outlines the trunk infrastructure that was funded through infrastructure charges
during the 2020-21 financial year.
Table 14 – Trunk infrastructure
Trunk infrastructure Trunk infrastructure Locality Method of Value
description network delivery ($’000)
Upgrade existing trunk Transport Noosaville Developer 21.4
footpath along frontage (Pathways)
Upgrade Bus Stop + existing Transport (Bus Stop Noosaville Developer 71.5
trunk footpath along frontage & Pathways)
Upgrade existing trunk Transport Noosaville Developer 2.1
footpath along frontage (Pathways)
Upgrade existing trunk Transport Noosaville Developer 4.4
footpath along frontage (Pathways)
Funding of loan repayment Transport, Various Council 3,046.4
costs associated with loan Public Parks,
funds raised historically to Stormwater
construct trunk infrastructure
in the Noosa Shire
Upgrade to Bus Stop (Balance) Transport (Bus Tewantin Council 38.4
Stops)
Upgrade to Bus Stop Transport (Bus Tewantin Council 18.0
Stops)
Upgrade to Bus Stop Transport (Bus Tewantin Council 10.5
Stops)
Upgrade to Bus Stop Transport (Bus Tewantin Council 30.0
Stops)
Upgrade to Bus Stop Transport (Bus Noosaville Council 34.5
Stops)
Upgrade to Bus Stop Transport (Bus Noosaville Council 26.4
Stops)
Upgrade to Bus Stop (Balance) Transport (Bus Cooroy Council 24.4
Stops)
Upgrade to Bus Stop Transport (Bus Tewantin Council 26.0
Stops)
Upgrade to Bus Stop (Balance) Transport (Bus Sunshine Council 30.0
Stops) Beach
Page 59
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2020-21(PDF, 6MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.