Original source · versioned page text
Annual Report 2020-21
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Shire Council
Trunk infrastructure Trunk infrastructure Locality Method of Value
description network delivery ($’000)
Tewantin, Ernest St/Hilton Transport (Roads) Tewantin Council 1,436.1
Tce. Upgrade T intersection to
roundabout
Orealla Bridge Upgrade Transport (Roads) Sunrise Council 2,716.9
Beach
Tewantin Doonella Bridge Transport (Roads) Tewantin Council 23.4
Cooroy Hinterland Playground Public Parks Cooroy Council 1,486.2
Noosaville, Sea Eagle Drive Transport (Roads) Noosaville Council 181.7
pathway upgrade
Doonan, Landfill site Cell 2.3 Public Parks Doonan Council 234.9
and part Cell 2.4 expansion –
site preparation works
Tewantin Bypass Transport (Roads) Tewantin Council 486.6
Garth Prowd Bridge Transport (Roads) Noosa Heads Council 45.7
Wapunga Lane Bridge Transport (Roads) Cootharaba Council 96.4
Council’s long term financial plan, adopted as part of the 2021-2022 budget, provides a forward
projection of anticipated infrastructure charges revenue and expenditure.
Page 60
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2020-21(PDF, 6MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.