Council archive · source document
18.05.29 Nc Ir_2 · MCU18/0078
Attached to the e-mail Response_ SR811902069 -Pressure & Flow Response - Lot 2 RP87781 - 165 Gympie Rd Noosaville - Kingston Developments (A5124802).eml, inside MCU18/0078 and OPW18/0117 Response to information Request.msg.
Noosa Council documents
3. Provide comment from a suitably qualified person in regard to the potential need for any
ancillary fire systems (booster pumps etc). If the systems are required provided
amended plans that clearly indicate the location and extent of any systems.
Issue – Driveway gate
Council has concerns with the location of the proposed gate on the driveway and the
potential for vehicles waiting to access the site blocking the footpath.
Information Required
4. Delete the gate or alternatively provide amended plans that indicate sufficient distance
(6m minimum) between the gate and the footpath to provide the “holding” area.
Issue – Vehicle manoeuvring
The submitted plans do not indicate the vehicle manoeuvring paths to all spaces. Council
has concerns that some spaces may be difficult to enter and exit. Please note that Council
requires sufficient room for vehicles to enter and exit the site in a forward gear.
Information Required
5. Provide amended plans that clearly indicate the vehicle paths for entry and exit from all
the spaces. The plans must:
a. be for a B99 vehicle as described in AS/NZS2890.1:2004; and
b. consider that the adjoining space is occupied.
6. Provide additional detail and comment on the indicated “car stackers”
Issue – Stormwater discharge
Council has concerns with the potential impacts of the stormwater discharge on vehicles in
Gympie Terrace and pedestrians utilising the crossing point.
Information Required
7. Indicate on the plans the expected discharge rate at each outlet point. Please note that
Council’s maximum discharge rate at any one location is 25l/sec.
8. Provide comment on the potential for the discharge to impact on vehicles in Gympie
Terrace and pedestrians utilising the crossing point.
Issue – Overland flow
The stormwater design includes a drainage line to convey surface runoff from an adjoining
property through the development site to Gympie Terrace. This drainage line will need to be
located within a private drainage easement.
Information Required
9. Indicate on the plans the necessary easement or alternatively:
a. provide certification from the design RPEQ that the development will not create
additional ponding of stormwater on any adjoining property; and
b. delete the drainage line from the plans.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 29 August 2018. Please advise Council
of your response to this information request in accordance with section 13 of the Development
Assessment Rules.
Page 2 of 3
Document Set ID: 20589896
Version: 2, Version Date: 29/05/2018 Print Date: 29 May 2018, 10:12 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
18.05.29 NC IR_2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 111 KB (small file)
- File type
No other editions are linked here.