50. Copies of all inspection reports by engineers are to be submitted to Council within 5 business
days of the inspection taking place.
51. The geotechnical engineer will be required to be on site for the whole of the time during the
basement excavation. No work of any such kind relating to the excavation of the basement
shall be carried out if he is not on the site supervising and directing this work. The consulting
geotechnical engineer shall carry out regular site inspections (and testing as required). Site
inspections shall be carried out prior to and during critical stages of construction (eg.
commencement of excavation, installation of piles, excavation near sensitive structures).
Such works shall only be carried out during dry weather conditions and if there is a risk of
sand movement occurring, all work shall be suspended until such steps, approved by the
geotechnical engineer have been taken to ensure that no further slippage will result.
52. The builder, landscaper and all workers associated with the construction of the works on this
site shall at all times comply with the directions of the consulting geotechnical engineer.
53. The applicant shall pay Council’s reasonable costs in relation to any geotechnical advice
sought by it in relation to this development provided that a quotation of the likely costs to be
incurred be obtained from the Council’s consultants Messrs Coffey Geosciences Pty Ltd and
that the amount of such costs be agreed to by the applicant before the advice is obtained.
54. Link wall movement shall be monitored throughout construction by an engineer and if
movement occurs construction is to be stopped immediately and appropriate action is to be
taken to arrest the movement. Further work shall only take place after a re-assessment of
the conditions on site by the engineer.
55. The client is to engage the services of a suitably qualified engineer to oversee the piling
works and copies of all inspection reports are to be submitted to Council within 5 business
days of the inspection taking place.
Additional Condition:
56. Water saving devices shall be included for all dwelling units with a maximum 9L per minute
restrictor on all showers.
57. The 3rd storey façade to the front boundary shall be setback a minimum of 8.5m.
58. Both reversing bays shall be provided with a signpost and painted pavement markings to
clearly define the area as “No Parking - Reversing Area Only”.
59. The developer must provide a suitably screened imperviously paved area large enough for
all refuse and recycling containers
5. REFERRAL AGENCIES
Not applicable
6. ADVISORY NOTES
1. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
making noise from:-
1.1. Monday to Saturday, before 7:00am or after 6:30pm
1.2. Sunday or public holiday, at any time.
A maximum penalty of $1,500 applies to an offence under these provisions
In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it
could reasonably be expected to move into a roadside gutter, stormwater drain or a water course.
On the spot fines apply for such offences
7. PROPERTY NOTES
Not applicable
Page 7 of 9
Document Set ID: 20570273
Version: 4, Version Date: 01/05/2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Minor Change Existing Approval 132002 220460 4 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 205 KB (small file)
- File type
No other editions are linked here.