23616DA - Change to Existing Approval [As Published] · 132003.221132.6

of 26

Text shows just the words. Original shows the document exactly as it was published.

                                              Officer:          Denis Wallace
                                              Direct Telephone: (07) 5449 5179
                                              Response Address: Locked Bag 72
                                                                Sunshine Coast Mail Centre QLD 4560
                                              Email:            [email protected]]
                                              Our Reference:    23616DA
                                              Your Reference:   PR100103-1012BKW.za
22 June 2010

Stockland Lake Doonella Pty Ltd
CARE RPS (Sunshine Coast) Pty Ltd
PO Box 149
WURTULLA QLD 4575



Dear Sir / Madam

                          Change to an Existing Approval
                                   Sustainable Planning Act 2009v

I refer to your request to make a change to an existing approval. On 21 June 2010 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:               23616 DA
    Street address:               Beckmans Road, Noosaville
    Real property description:    Formerly Lot 800 SP 153455
    Planning Scheme:              The Noosa Plan

2        DECISION DETAILS
Council on 24 February 2005 decided to issue the following type of approval:-
     Material Change of Use - 181 Dwelling Houses, Group Housing Development of 43 Dwelling Units
      and Estate Sales Office.
     Lot Reconfiguration - 185 Residential Lots & 43 Group Title Lots
In relation to a request to change the development approval, Council on 19 February 2007 decided to:
A.       Approve a change to Conditions 35 and 66
B.       Issue a Compiled Decision Notice
In relation to a request to change the development approval, Council on 7 May 2008 decided to:
A.       Approve a change to Condition 66
B.       Issue a Change to an Existing Approval
In relation to a request to change the development approval, Council on 21 June 2010 decided to:
A.       Approve a change to Conditions 81 & 95 and Advisory Note 1.
B.       Include additional Advisory Note 4
C.       Issue a Change to an Existing Approval


                                                                                                Page 1 of 26
Full text of the other 25 pages

Page 2

                                                                                               23616DA


3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager conditions.
4     ASSESSMENT MANAGER CONDITIONS

1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are numbered 6812-58F prepared by
      PMM Group and dated 22 October 2004 and as may be amended by these conditions.
2.    An amended Plan of Development shall be provided to Council within one month of Council’s
      approval revising:
      2.1.   the ‘Key Development Requirements’ consistent with the approved Plan of Development
             issued with the Development Approval 22402 DA and conditions of same:
      2.2.   the ‘Key Development Requirements’ to incorporate the specific acoustic measures for
             allotments 159-171, 174 – 181 as required by condition 4.
3.    The Estate Sales Office shall comply with the following:
      3.1.   Not more than 2 employees are to be engaged in the operation at any one time;
      3.2.   The estate sales office shall not be used between 6:00pm and 8:00am.
      3.3.   The estate sales office shall cease operations within 2 years of the commencement of its
             use.
      3.4.   Any advertising devices shall be erected upon the allotment which the estate sales office
                                                                    2
             is located, shall not exceed a total display area of 3m and not include the use of bunting.
      3.5.   The applicant shall submit a layout of the car parking (four spaces) for the real estate
             office for Operational works approval. The car park design shall ensure the retention of
             vegetation.
      Acoustic Measures
4.    Dwelling houses on allotments 159-171, 174 – 181 shall be constructed in accordance with
      Australian Standard AS2107-2000 and AS3671, to a minimum of Category 2, with the formal
      external open space area of allotments designed and/or located to reduce road traffic noise.
      This may include the use of barriers outside of the Private Open Space Precinct or by location
      of recreation areas on the ‘quiet’ side of dwellings (ie. the façade that is shielded from road
      traffic noise from Beckmans Road).
      A property note shall be included on the titles of lots 159 -171, 174 -181 noting the architectural
      acoustic requirements are required for these dwelling houses.

      Residential Design Guidelines
5.    All Dwelling houses and Dwelling units shall be designed and constructed to accord with the
      Residential Design Guidelines prepared by PMM Group and stamped approved. An amended
      Residential Design Guidelines shall be provided to Council prior to approval of Operational
      Works and include the following amendments:-
      5.1.   No dwelling house (including garage/carport) shall be located within 6 metres of the front
             boundary, unless approval is given otherwise by Council.
      5.2.   All buildings (which does not include swimming pools or other structures that do not
             present a fire hazard) located on allotments adjoining either private open space or public
             open space shall be located in accordance with the setback requirements contained in
             the Fire Management Plan.
      5.3.   The Energy Efficiency criteria shall include the requirement for all dwelling houses to
             have a solar hot water system.


                                                                                           Page 2 of 26

Page 3

                                                                                             23616DA


      5.4.   A provision shall be included requiring all pools constructed to be fitted with a rope to
             allow for a Koala to exit the pool.
      5.5.   Rainwater harvesting provisions shall be included for Forest Cluster Precinct, including a
             rainwater tank of 15kL.
      5.6.   Water saving devices shall be included for all dwelling houses with a maximum 9L per
             minute restrictor on all showers.
6.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
7.    Any advertising sign or device is to comply with the provisions of Council's policies on
      advertising.
8.    The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this
      approval to effect compliance with conditions.
9.    This Development Permit for a material change of use of premises lapses if:-
      9.1.   the use or erection of a building or other structure associated with the use, has not been
             commenced by 26 February 2009, unless application is made and approved by Council
             for an extension; or
      9.2.   the use of any premises pursuant to the Development Permit ceases.
10.   The developer must obtain all of the required Development Permits for each Stage referred to in
      the Decision Notice, prior to obtaining a Development Permit for building works.
Community Management Statement
11.   Group housing development shall be subject to a Community Management Statement (CMS)
      which shall include provisions making specific reference to this approval and in particular the
      measures contained in the approval that ensure the protection of the environmental values of
      the private and public open space areas including stormwater management, native flora, fauna
      and fauna habitat, and significant trees to the satisfaction of Council. To this end the CMS will
      make specific reference to all relevant Management Plans.
Environmental Covenant
12.   An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994, shall
      be registered, in favour of Council, on the title of any property of a Group Housing development
      over the private open space precinct area. The environmental covenant shall be for the
      protection of the site’s environmental values. Environmental values of the site mean the
      following environmental values:
      12.1. the native flora and plant communities on the site and their habitat;
      12.2. the corridor habitat connections; and
      12.3. water quality.
Fees Payable
13.   The developer shall pay Council all reasonable costs for the assessment of the management
      plans and also the costs associated with ensuring the development complies with the
      requirements of this approval. These costs shall be limited to a maximum of $25,000 including
      the cost of external consultants should they be required.
      The further approvals required to allow development to occur shall be subject to the fees
      contained in Council’s Fees and Charges Schedule.




                                                                                         Page 3 of 26

Page 4

                                                                                            23616DA


Public Open Space Management Plan
14.   The development shall be undertaken in accordance with the Public Open Space Management
      Plan prepared by Rob Friend & Associates Pty Ltd and dated December 2004 and as may be
      amended by these conditions.       An amended Public Open Space Management Plan
      incorporating the required amendments shall be lodged for approval prior to issue of a
      Development Permit for Operational Works.
15.   The Public Open Space Precinct shall be named Lake Doonella Conservation Reserve.
16.   A ‘Compliance Checklist’ shall be included in its entirety in the Public Open Space Management
      Plan, as follows:-
      Boundary Fence And Access Points
      16.1. Construction of the fence along the common boundary of the Public Open Space and the
            residential development as shown on Map 8. The fence is to be designed to deter the
            public and adjacent residents from entering the Public Open Space, other than through
            the approved access points. The fence is to be fauna-friendly. Approximately 3,000 m
            long.
      16.2. Construction of 4 vehicle-access gates with locks, and the construction of 6 pedestrian-
            only access points/gates at the locations shown on Map 8.
      Maintenance Track/Fire Trail And Access Points
      16.3. Construction of the maintenance access track/firebreak adjacent to Lots 1 – 17 and 24 as
            shown on Map 7.
      16.4. Construction of 2 vehicle-access gates with locks at the locations shown on Map 7.
            These gates are to be designed and located to deter all public access.
      Pedestrian Pathways And Sewer Mains
      16.5. Construction of the sewer mains and all connections located within the Public Open
            Space area. To comply with Eraland Drawing No. 01691-130B.
      16.6. Construction of the pedestrian pathway shown on Map 6. To be a 2.0 m wide concrete
            path, with 0.5 m wide gravel shoulders, and approximate length of 2,300 m.
      16.7. Construction of the minor pathway to lake viewing area shown on Map 6. To be a 1.0 m
            wide gravel track, approximately 80 m long.
      16.8. Construction of the minor pathway shown as P1 on Map 6. To be a 2.0 m wide concrete
            track with no gravel shoulders, approximately 50 m long.
      16.9. Rehabilitation of all sections of the sewer main alignment, which are not included in the
            pedestrian pathway.
      16.10. Rehabilitation of all areas of bushland disturbed by the construction of the pedestrian
            pathways, the sewer main and connections to the sewer main.
      16.11.No weeds in rehabilitated areas.
      16.12.All planted stock in rehabilitated areas is healthy and robust.
      Lake Viewing Area
      16.13.Define the boundary of the lake viewing area by logs.
      Neighbourhood Park
                          2
      16.14.To be 600 m in area.
      16.15.Provision of:-
            16.15.1. 1 set of multi-use play equipment,
            16.15.2. 3 seats,

                                                                                        Page 4 of 26

Page 5

                                                                                          23616DA


        16.15.3. small grassed areas,
        16.15.4. fence along the common boundary of the neighbourhood park and the Public
                 Open Space is child-proof,
        16.15.5. bollards along roadside to prevent vehicle access.
Swanbourne Way Connection
16.16.The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lots
      109 - 110 to the northern constructed end of Swanbourne Way in the form of a concrete
      path and timber bridge 2 metres wide as part of Stage B. This will necessitate the
      creation of a wide enough easement or a road reserve over the public open space on the
      Plan of Survey for Stage A.
Maintenance Track/Fire Trail And Access Points
16.17.Provision and erection of the following identification and regulatory signs:-
        16.17.1. 6 x identification and regulatory signs: located at each access point onto the
                 pedestrian pathway;
        16.17.2. 5 x identification and regulatory signs: located at access points into the Public
                 Open Space near Beckmans Road;
        16.17.3. 1 x identification and regulatory sign: located in the neighbourhood park;
        16.17.4. 1 x identification and regulatory sign: located at the northern end of the main
                 spine road through the estate;
        16.17.5. 1 x identification and regulatory sign prohibiting swimming and access to the
                 lake at the lake viewing area;
        16.17.6. 2 x identification and regulatory signs: located at the Swanbourne Way access
                 point;
        16.17.7. 2 x regulatory signs: located on each gate on the maintenance access track
                 adjacent to Lots 1 – 17 and 24;
        16.17.8. 2 x direction signs at pathway junctions;
        16.17.9. 2 x safety warning signs at farm dam.
16.18.All signs are vandal-proof and to Council’s specifications.
Bushfire Control
16.19.Fire fuel loads do not exceed 10 tonnes/ha in any location in the Public Open Space.
16.20.Fuel reduction activities undertaken as specified in the Fire Management Plan.
Erosion Control And Remediation
16.21.No active erosion, particularly in gullies.
16.22.Rehabilitation of all disused tracks, and along the existing sewer main.
16.23.No declared plants or environmental weeds in rehabilitated areas.
16.24.All planted stock in rehabilitated areas is healthy and robust.
Weed Control
16.25.No declared plants or environmental weeds.
Other
16.26.No rubbish or graffiti.
16.27.No evidence of vandalism.


                                                                                      Page 5 of 26

Page 6

                                                                                              23616DA


      16.28.All trees in close proximity to the pedestrian pathway and access points certified by an
            Arborist to be safe.
17.   The following corrections and amendments shall be incorporated into the Public Open Space
      Management Plan.
       Throughout the            Delete all references to the Developer being ‘Lensworth Lake
       document:                 Doonella Pty Ltd. Replace with ‘the Developer’.
       Page 7; dot point 6:      Delete and replace with ‘The boundary of viewing area is to be
                                 defined by logs’.
       Page 16; Item 5:          The concrete part of the pedestrian pathway is 2 m wide, not 3 m
                                 wide.
       Page 19; Item 9:          Delete last sentence and replace with ‘The residual area is to be
                                 revegetated with plants indigenous to the site.’
       Page 23; Section 5.4,     Delete ‘local indigenous plant species’ and replace with ‘plant
       Item 2 and Page 24;       species indigenous to the site’.
       Section 5.4, Item 6:
       Page 24; Item (iii)       Delete first sentence and replace with ‘Gates and signage are
                                 erected at all access points to the pedestrian pathway.’
       Page 24; Desired          Add the additional item.
       outcomes:                 ‘(iv) Two locked gates on maintenance track.’
       Page 25; 2(e)             Delete.
       Pages 27 – 29:            Amend in accordance with the ‘Compliance Checklist’.
       Pages 40, 41 and 42       Amend in accordance with the Conditions of Approval for the Fire
       and Appendix III:         Management Plan.
       Page 56; 3.2.13           Delete the words “where necessary”
       Page 58                   Incorporate a requirement that Noosa Council to view
                                 documentation of consultation with QPWS re: approval/relocation to
                                 suitable site.


       Appendix IV:              Amend in accordance with Conditions of Approval for the Flora and
                                 Fauna Management Plan.
       Definition of Ecologist   Include a definition of ecologist requiring a tertiary education person
                                 in the field of ecology with at least 3 years field experience.
18.   Prior to the dedication of the Public Open Space area to Council, all works in the Public Open
      Space Precinct shall have been undertaken by the Developer, to Council’s satisfaction, apart
      from the requirements of conditions 15.14 & 15.15 - Neighbourhood Park and condition 15.16 -
      Swanbourne Way Connection, which shall be completed with Stage B.
The Environmental Management Plan
19.   The development shall be undertaken in accordance with the Environmental Management Plan
      Revision B prepared by PMM Group and dated 22 October 2004 and as may be amended by
      these conditions. An amended Environmental Management Plan incorporating the required
      amendments shall be lodged for approval prior to issue of a Development Permit for
      Operational Works
20.   The following corrections and amendments shall be incorporated into the Environmental
      Management Plan:-
      20.1. The Developer’s corporate Environmental Policy shall be included in the Environmental
            Management Plan (refer to Condition 58.3 of the Preliminary Approval 22402 DA);
      20.2. Condition 55 shall be addressed in the Environmental Management Plan;


                                                                                          Page 6 of 26

Page 7

                                                                                            23616DA


      20.3. The Environmental Management Plan shall be amended so that it is consistent with the
            Fire Management Plan as amended may be amended by these conditions.
      20.4. The following errors shall be corrected:-
           Page 17:    the neighbourhood park is to be constructed in Stage B, not Stage D.
           Page 22;    in the Replace ‘3.5 m’ with ‘3.0 m’Rehabilitation box:
           Page 38:    Delete reference to ‘acoustic fencing’.
           Throughout the document, delete all references to the Developer being ‘Lensworth Lake
            Doonella Pty Ltd and replace with ‘the Developer’.
The Fire Management Plan
21.   The development shall be undertaken in accordance with the Fire Management Plan prepared
      by Rob Friend & Associates Pty Ltd and dated December 2004 and as may be amended by
      these conditions. An amended Fire Management Plan incorporating the required amendments
      shall be lodged for approval prior to issue of a Development Permit for Operational Works
22.   The Fire Management Plan shall be amended and corrected to:
      22.1. incorporate the following Conditions,
      22.2. remove all substantial and significant inconsistencies,
      22.3. fix all significant errors and omissions, and
      22.4. ensure consistency with the other management plans and the Decision Notice, dated 5
            September 2003.
      Fire Protection Zones
23.   The Fire Protection Zones shown in the attached Figure 1 shall be provided and incorporated
      into the Fire Management Plan and other relevant management plans.
24.   Within all Fire Protection Zones:
      24.1. individual large trees (200 mm DBH or greater) may be retained but their crowns should
            not touch the dwelling or vegetation in the adjacent bushland;
      24.2. all existing understorey shrubs and all vegetation greater than 300 mm in height shall be
            removed;
      24.3. mowable ground cover plants not exceeding 300 mm in height such as the grasses,
            sedges and small herbaceous plants are permitted;
      24.4. understorey shrubs and trees shall not be planted;
      24.5. flammable structures and landscaping materials, such as timber fences, timber pergolas,
            timber decks and timber sleeper walls, are prohibited;
      24.6. non-flammable structures such as paved areas and swimming pools are permitted.
      Maintenance Track in the Public Open Space Area
25.   A 3 m wide maintenance track/fire trail, for the use of Council’s maintenance vehicles and
      emergency vehicles, is to be provided within the Public Open Space area adjacent to the
      northern boundary of Lots 1 – 17 and 24. It will be on the alignment indicated on the Survey
      Plan dated 612-66 by PMM, and will be included as an easement or included in the Public Open
      space. If included in the open space, the 10 metre fire buffer will measured from the original
      Plan of Development Boundaries of the Lots.
26.   Significant trees and groups of trees are to be retained. The trees and groups of trees to be
      retained will be determined by Council’s Manager – Environmental Services. All shrubs and
      woody understorey plants shall be removed. Existing grasses, sedges and small herbaceous
      plants (less than 300 mm in height) will be retained.

                                                                                        Page 7 of 26

Page 8

                                                                                            23616DA


27.   Locked gates will be provided at either end of this maintenance track. This track is not part of
      the public pedestrian pathway and public access will be prohibited. Signs prohibiting public
      access shall be provided at both ends of the maintenance track.
28.   The maintenance track and locked gates shall not be located within 10 m of the scar tree.
29.   Prior to the dedication of the Public Open Space to Council, the developer shall maintain the
      maintenance track.
      Fire Fuel Reduction
      Public Open Space post-dedication to Council
30.   After dedication of the Public Open Space to Council, fire fuel loads in each of the four Fire
      Management Blocks will be assessed annually. In the Fire Management Blocks where fuel
      loads exceed 10 tonnes/ha in more than 4 assessment plots, fuel reduction will be undertaken
      manually using hand tools. A prescribed burn within a Fire Management Block will only be
      undertaken if Council’s Manager – Environmental Services deems it necessary to maintain the
      ecological values of the vegetation. The applicant will undertake this procedure for a period of
      three (3) years after the registration of the final stage of the development.
      Private Open Space in Conservation Residential Precincts
31.   The fire fuel loads in the Private Open Space areas of the three Conservation Residential
      Precincts will be assessed annually. If the fire fuel load in a Private Open Space area exceeds
      10 tonnes/ha in more than 3 assessment plots, fuel reduction will be undertaken manually using
      hand tools.
32.   Prescribed burns will not be permitted, unless the Council’s Manager – Environmental Services
      agrees, in writing, that a prescribed burn is necessary to maintain the ecological values of the
      vegetation. Written applications requesting permission to undertake a prescribed burn must
      include an ecological justification supported by ecological data.
      Undeveloped Stages
33.   Following completion of Stage A, fuel loads in the undeveloped Stages are to be assessed
      annually. When fuel loads exceed 10 tonnes per hectare in more than 4 assessment plots, the
      fuel load is to be reduced by either a low intensity prescribed burn (provided that adequate
      firebreaks are constructed adjacent to all Public and Private Open Space areas, the school and
      the Stage A residential areas) or by the physical removal of the fuel load by hand or machine).
      Fire Hydrants and Water Points
34.   Fire hydrants shall be provided throughout the development in accordance with the Building
      Code (BCA) and the requirements of the Q.F.R.S.
35.   Each residential allotment that includes Private Open Space, or abuts Public or Private Open
      Space shall be provided with a 20 – 25 mm water connection and garden tap, located within 2
      m of the Open Space area. Each tap shall have a permanently attached 20 m long garden
      hose and hose reel. The installation and maintenance of these requirements shall be the
      responsibility of future residents, with the requirements included within the Residential Design
      Guidelines.
36.   For the Forest Cluster Precinct, 20 – 25 mm water connections and garden taps shall be
      provided at a maximum spacing of 40 m along its common boundaries with Open Space areas.
      Each tap shall have a permanently attached 20 m long garden hose and hose reel.
      Other Bushfire Protection Measures
37.   Lots 91 to 94 and 106 to 111 shall be totally cleared of all existing trees, shrubs and woody
      understorey plants prior to building commencing on these Lots. Grasses, sedges and small
      herbaceous plants shall be retained.




                                                                                        Page 8 of 26

Page 9

                                                                                                    23616DA


38.   The Fire Management Plan for the Development Area shall include the requirement that a
      Bushfire Information Kit will be provided to all purchasers of allotments on the site. The
      Bushfire Information Kit will be submitted to Council with the Survey Plan for Stage A of the
      development.
39.   Burning of rubbish, cleared vegetation, surplus materials, etc., on the site is prohibited.
      Other
40.   Access easements through the Conservation Residential Precincts ‘building envelopes’ to the
      Private Open Space boundaries are not required.
Flora And Fauna Management Plan
41.   The development shall be undertaken in accordance with the Flora and Fauna Management
      Plan prepared by James Warren & Associates Pty Ltd and dated December 2004 and as may
      be amended by these conditions.       An amended flora and Fauna Management Plan
      incorporating the required amendments shall be lodged for approval prior to issue of a
      Development Permit for Operational Works
42.   The following corrections and amendments shall be incorporated into the Flora and Fauna
      Management Plan:
       Page 3; Last             Add the following to the end of the paragraph:
       paragraph:               ‘A suitably qualified and experienced Ecologist or Environmental
                                Scientist will be engaged by the Developer to implement the
                                requirements or the Flora and Fauna Management Plan and monitor
                                the Contractor’s compliance with the Flora and Fauna Management
                                Plan and the Environmental Management Plan. The Site Ecologist
                                will provide information for the monthly Environmental Compliance
                                Reports for Council.’
       Page 6; Section          Add the following to the end of the sentence:
       3.2.3:                   …… ‘ , except for the construction of the approved sewer main and
                                pedestrian pathway.’
       Page 6; Section          Add the following to the end of the sentence:
       3.2.4:                   …… ‘ , except for the construction of the approved sewer main and
                                pedestrian pathway.’
       Page 8; Section          Delete the first sentence and replace with:
       3.3.1:                   ‘Erosion and sediment control works shall be undertaken in
                                accordance with the approved Environmental Management Plan and
                                all other approved Erosion and Sediment control Plans.’
       Page 11; Section         Add the following to the end of the second sentence:
       4.2.12:                  ‘The number, type, sizes and location of the nest boxes shall be
                                determined in consultation with the Council’s Manager –
                                Environmental Services.’
       Page 12; Section         Replace the last sentence with the following:
       4.2.17: first            ‘Bicycles and other wheeled-recreation equipment (eg. scooters, trail
       paragraph, last          bikes, skateboards, etc.) are prohibited on the pedestrian pathway
       sentence:                and in the Public and Private Open Space areas.’
       Page 15; Section         Add the following to the end of the second sentence:
       4.3.3.5:                 ‘The number, type, sizes and location of the nest boxes shall be
                                determined in consultation with the Council’s Manager –
                                Environmental Services.’
       Page 18; Section         Add the following to the end of the paragraph:
       6.4:                     ‘The number, size and location of the hollow limbs placed in Public
                                and Private Open Space areas will be determined by the Site
                                Ecologist in consultation with the Council’s Manager –
                                                                                             Page 9 of 26

Page 10

                                                                                                 23616DA


                               Environmental Services.      These logs should not create a fire
                               hazard.’
       Page 20; Section        At the end of the third sentence add the following:
       8.1:                    ‘This monitoring of the gully vegetation will be co-ordinated with, and
                               take into account the results of, the water cycle analysis (via a mass
                               water balance approach) required by Condition 55.’
Landscape Management Plan
43.   The development shall be undertaken in accordance with the Landscape Management Plan
      prepared by EDAW Gillespies and dated October 2004 and as may be amended by these
      conditions. An amended Landscape Management Plan incorporating the required amendments
      shall be lodged for approval prior to issue of a Development Permit for Operational Works.
44.   The following corrections and amendments shall be incorporated into the Landscape
      Management Plan:
       Page 4:                Delete reference to Viewing Platform from the Key to the Site Access
                              Map.
       Page 7:                Delete ‘50’ in the seventh box in the key and replace with ‘30’.
       Page 17; fourth dot    Delete the current words and replace with the following:
       point in the ‘On-      ‘. Access to the Private Open space within the Conservation Residential
       going maintenance’     Precinct is restricted to the owners of properties within the
       column:                Conservation Residential Precinct. There is no public access.
                              Access to the Private Open space areas is restricted to pedestrians. All
                              vehicles, horses, bicycles, trail bikes and motorbikes are prohibited.’
       Page 27; last          Delete the last sentence and replace with the following:
       sentence:              ‘Design and construction details for the fauna friendly fence are to be
                              provided as part of the Operational Works Application for the first stage
                              of the development. All of the fauna-friendly fence and all of the gates
                              and signage are to be provided during the first stage of development.’
       Page 31; Figure        Correct this figure so that it is consistent with Figure 2-9 in the
       showing network of     Stormwater and Water Quality Management Plan by WBM Oceanics.
       swales and detention
       basins:
       Page 33; Master        Add the pedestrian/bikeway connection to Swanbourne Way.
       Plan:
       Pages referring to     Correct pages 4, 8, 11, 19, 23, 24, 25, 26, 30 and 33 in accordance
       the Fire               with the conditions of approval for the Fire Management Plan.
       Management Plan:
Sediment and Erosion Control
45.   Detailed staged Sediment and Erosion Control Plans are to be prepared for the site and shall be
      prepared to the reasonable satisfaction of Council and in accordance with the Institution of
      Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June
      1996) and in particular using Checklist No. 3 from that document. The sediment and erosion
      control plans shall cover all development on site (during the construction, establishment and
      operational phases) including rehabilitation and remediation.
46.   The Sediment and Erosion Control Plans will deal with the staging of the development generally
      in accordance with WBM’s Report ‘Lensworth Lake Doonella – Stormwater and Water Quality
      Management Plan – Version 2, Revision 3’ of 30/3/03.
47.   The Sediment and Erosion Control Plans shall also include the Public Open Space area and
      shall:
      47.1. Identify existing erosion problems, and

                                                                                         Page 10 of 26

Page 11

                                                                                                 23616DA


      47.2. Specify appropriate remedial treatments.
48.   The residential precincts shall be designed to incorporate, within their boundaries all the
      necessary sediment and erosion control devices.
Stormwater Management Plan
49.   A Stormwater Management Plan for the site including revegetation and remediation of all water
      treatment areas including swales and bioretention systems shall be prepared to the reasonable
      satisfaction of Council. The Stormwater Management Plan shall be generally in accordance
      with WBM’s Report of 30/3/03.
50.   The developer shall comply with the Stormwater Management Plan and the operational stage
      components of the Stormwater Management Plan shall be referenced in the community
      management statements for all group housing developments over the site.
51.   Key water quality objectives to be reflected in the Stormwater Management Plan are the
      protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastern creek and
      within the receiving waters of Lake Doonella and the Noosa River, as well as primary contact
      recreational standards within the receiving waters. Appropriate water quality standards to be
      adopted are those as specified by Brisbane City Council (in conjunction with the South East
      Queensland Regional Water Quality Management Strategy).
52.   Stormwater Management - MUSIC modelling; Prior to the completion of the final stormwater
      management plan and the civil design drawings for operational works, any stormwater
      management assessments utilising the CRC for catchment hydrology's MUSIC modelling
      system must be corrected for a possible error in the assessment of bio-retention system
      efficiencies and performance in removal of nutrients, as recently notified by the CRC. Empirical
      calculations such as the Brisbane City Council spreadsheet method shall be use to adjust the
      MUSIC model and to demonstrate that realistic removal efficiencies are being used.
      Alternatively, once a 'patch' is available from the CRC, this corrected version of the software can
      be used, but, again, cross checking with empirical calculations is required. The error in the
      bioretention routine will result in the need for additional water quality treatment measures. Initial
      assessments indicate that MUSIC is over predicting removal by as much as twice what should
      be occurring.’
      If these checks indicate that the bioretention devices require enlarging, the applicant shall
      remove lots, if necessary, from the development in order to accommodate the devices without
      affecting the public and private open space areas. If the system requires amending, an
      amended report is to be submitted to Council for checking.
53.   Monthly reports on monitoring, incidents, corrective action and plan updates are required to be
      submitted to Council. These reports are to be submitted in a form acceptable to Council and
      are to highlight any non-standard results.
54.   Any stormwater outlet to the gullies on the site are to be stabilised with appropriate energy
      dissipation and local armouring. Regular monitoring of creek erosion is required with
      appropriate corrective action specified to ensure a stable creek system. All work to be
      undertaken to minimise impacts on the Environmental Values of the creek system.
55.   The residential precincts shall be designed to incorporate, within their boundaries, all the
      necessary stormwater and water quality control devices associated with the development.
56.   The applicant will ensure that all necessary overland flowpaths for Q100 events are provided on
      site and covered by an easement where they traverse private property.
Water Quality
57.   The Developer is to install water quality control devices generally in accordance with the
      Stormwater Management Plan. Detailed staging plans and specifications, based on and
      generally in accordance with the Plan are to be prepared and submitted (after consultation with
      officers of the Council) with the relevant applications for operational works.


                                                                                            Page 11 of 26

Page 12

                                                                                               23616DA


Drainage
58.   The Developer is to complete the drainage works progressively in conjunction with development
      of the site and generally in accordance with the approved Stormwater Management Plan.
      Detailed drainage plans and specifications, based on and generally in accordance with the
      approved Drainage Plan, the EMP and these Conditions, are to be prepared and submitted
      (after consultation with officers of the Council) with the relevant applications for operational
      works.
59.   All drainage works as required by the Drainage Plan are to be provided by the developer at its
      own cost.
Water Cycle Management
60.   Following development of the site, the vegetation in the gullies shall be monitored annually by a
      suitably qualified person (terrestrial ecologist) for three (3) years so as to detect any adverse
      effect due to rainwater tanks harvesting water that would normally flow into the gullies and
      sustain the vegetation. Monitoring of the vegetative conditions of the gullies shall include
      maintaining summer and winter photographic records at several key locations (at least 3 per
      gully) in each gully, which will be maintained for the duration of the monitoring period. The sites
      chosen for monitoring, shall be representative of the major vegetation species present in the
      gully, and also of those species which may be prone to changes in the hydrological regime of
      the gully. Details of site inspections, including photographic records shall be included in a half
      yearly report to be maintained by the site’s Body Corporate. These reports will be forwarded to
      Council. If adverse effects are evident, the water harvesting rates by the rainwater tanks shall
      be modified to overcome or other appropriate contingency measures undertaken to rectify the
      problems.
Certification
61.   Certification is required from a qualified stormwater engineer/scientist that the submitted civil
      engineering drawings accurately reflect the stormwater management treatment train in the
      approved stormwater management plan. This certification is to be submitted in conjunction with
      any Operations Works (Civil Works) application.
62.   Certification is required from a qualified stormwater engineer/scientist that the stormwater
      management treatment train in the approved stormwater management plan and associated
      design drawings has been installed on site in accordance with the approved stormwater
      management plan and is functioning as designed. This certification is to be provided to the
      Council prior to the endorsement of survey plans, or prior to Council accepting the devices ‘on
      maintenance’.
63.   All stormwater drainage lines including private drainage lines (also known as inter-allotment
      drainage lines) or as otherwise approved by Council’s Manager of Land Development shall be
      inspected by closed circuit television (CCTV) at the completion of all works and immediately
      prior to acceptance ‘On Maintenance’.
      A report of the CCTV inspection, including photographic records (which includes photos & video
      recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval.
      Any defects or substandard works shall be recorded and accurately illustrated on the drainage
      plan showing the location of the defect(s).
       Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants
       expense with a further CCTV inspection arranged once the rectification works have been
       completed.
       To this extent all CCTV inspections, including any additional inspections necessary following
       defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
       incurred by Council in reviewing the CCTV inspection results shall also be borne by the
       applicant.




                                                                                          Page 12 of 26

Page 13

                                                                                               23616DA


Acid Sulphate Soils Management Plan
64.   An Acid Sulfate Soils (ASS) Management Plan must be provided for any excavation works
      undertaken in areas of the site below 5m AHD. The Management Plan must outline all
      proposed ASS investigation and management procedures, which are to be undertaken in
      accordance with State Planning Policy 2/02 "Planning and Managing Development Involving
      Acid Sulfate Soils".
Reconfiguration Plans
65.   The Lot Reconfiguration for the residential areas will be in accordance with the following Plans
      by PMM Group and as may be amended by these conditions:
      65.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1 to
            4; and
      65.2. Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2
            March 2004.
Staging
66.   The staging of the Lot Reconfiguration for the residential areas will be in accordance with the
      Plan titled “Construction Staging Plan” by PMM Group - Reference 6812-61H and dated 8
      September 2003.
General
67.   Security in the form of a cash bond or trading bank guarantee to the sum of $400,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational Works. The cash bond or trading bank guarantee will be
      reduced to $100,000 upon completion of all construction works (except building construction)
      and the balance returned after the completion of the water quality monitoring and management
      plan requirements.
Plan Sealing and Easements
68.   For the purpose of these conditions, the following definitions apply: -
      68.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed
            by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
      68.2. A registered Professional Civil Engineer means a civil engineer who is registered in
            Queensland pursuant to the Professional Engineers Act 1988.
      68.3. Carparking area means a parking area as defined in the Schedule to the Shire of Noosa
            Planning Scheme inclusive of manoeuvring areas and access from the roadway.
      68.4. The person acting on this permit means any person or company who undertakes
            development pursuant to this permit.
      68.5. AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS 2890.1-
            1993.
      68.6. Principal Contractor means the person nominated by the Applicant and approved by the
            Manager - Land Development at a pre-start meeting as being responsible for the major
            component of works associated with a Development Permit for Operational Works of any
            works on the site.
69.   Conditions of any Development Permit for a Material Change of Use of premises relevant to
      each stage of this lot reconfiguration shall be complied with prior to Council endorsement of the
      Plan of Survey.
                                                                                      2
70.   The proposed contemporary residential lots shall have a minimum size of 600 m .
71.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
      documentation shall be presented to Council and shall be submitted in the correct form with the
      fees prescribed in Council's adopted fee schedule.

                                                                                          Page 13 of 26

Page 14

                                                                                              23616DA


72.   Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges
      due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to
      endorsement of the Plan of Survey for each stage.
73.   Easements will be required over any publicly owned services that traverse private land in
      conjunction with the sealing of Survey Plans for each Stage.
74.   Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant
      of Easement shall be submitted to Council for perusal. Any changes required by Council’s
      Solicitor shall be attended to prior to endorsing the Plan of Survey. Any necessary Titles Office
      forms requiring the consent of Council is to be submitted prior to the endorsing of the Plan of
      Survey.
75.   Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
      Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
      Survey at the Land Titles Office, the Title Deed and the easement documents will also be
      lodged and any additional Titles Office forms or requisitions requiring the consent of Council
      being attended to forthwith.
76.   All easements required on downstream properties draining the site either by way of
      underground drainage or overland flowpaths shall be obtained and proof of registration of the
      easements shall be submitted with the Survey Plan.
77.   A registered easement shall be created over the zone of influence of the existing and proposed
      sewer mains in the site. The easements shall generally be parallel to and centred over the
      sewer main and be equivalent in width to twice the depth to invert level of the sewer at the
      deepest point within the allotment (measured from the finished surface) and be no less than 3.0
      metres wide.
      In determining the zone of influence the existing sewer must be located on site by a licensed
      surveyor and designated, together with the finished surface levels, on any plans accompanying
      any application for this property.
      No building, swimming pool, retaining wall over 1 metre high or any other structure requiring a
      Building Permit shall be constructed within or encroach over an easement.
      No foundations or eaves shall encroach into an easement. Plans detailing any proposed
      foundations in close proximity to an easement shall be designed by a registered practicing
      Structural or Geotechnical Engineer and be submitted with the application for a Development
      Permit for Operational Works.
      No fill shall be placed over an easement without written Council approval. Council approval will
      not be considered for any fill over an easement, which causes the sewer to be more than 3.0m
      depth.
      Any increase in depth to sewer as a result of fill activity shall increase the minimum building
      setback and width of the required easement accordingly.
78.   Prior to endorsement of the Plan of Survey for each Stage, a State Survey Mark shall be
      provided within the Stage. It shall be levelled and located to the requirements of the Manager -
      Land Development. A ‘Form 6’ shall be submitted for Council's records.
      Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation,
      making it suitable for Global Positioning Equipment, and accurately connected to at least one
      real property corner by a registered Surveyor.
Contributions
79.   The applicant shall pay to Council a contribution toward the cost of upgrading the intersection of
      the new road and Beckmans Road (this contribution is $64,075, at December 2002, which will
      be adjusted by CPI current at the date of payment). If the intersection at Beckmans Road
      requires upgrading prior to Council’s planned construction date of these works, the developer
      shall undertake the necessary works at its own cost instead of making the contribution.


                                                                                         Page 14 of 26

Page 15

                                                                                               23616DA


Dedications
80.   The public open space areas, apart from the area adjacent Beckmans Road and wildlife corridor
      shall be dedicated to the Crown prior to the sealing of the first completed Stage in the Staging
      Plan of the development. The public open space area adjacent Beckmans Road and wildlife
      corridor shall be dedicated to the Crown prior to the sealing of Stage C in the Staging Plan of
      Development. The public open space will be in the condition required by the Open Space
      Management Plan.
Headworks
81.   For the residential component, contributions shall be paid to Council in accordance with
      Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks Contributions and
      Sewerage Headworks Contributions respectively at the rates applicable at the time of payment,
      subject to CPI changes.
      An estimate only of the contributions payable for each Stage is as follows:-

                            Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
              Stage
                               A           B1            B2           B3             C             D
           Current at     December        March        March         March        March       December
             CPI            2004          2010         2010          2010         2010          2004
           Sewerage       $ 258,488     $ 63,598      $ 77,731     $ 120,130    $ 204,928      $ 17,093
              Water
                          $ 285,909     $ 73,174      $ 89,434     $ 138,217    $ 235,782      $ 14,856
              Supply
            TOTAL =       $ 544,397     $ 136,772    $ 167,165     $ 258,347    $ 440,710      $ 31,949

      Contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage of
      the reconfiguration.
      With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
      contributions that will be assessed at the time of the future applications.
Roads
82.   All roads shall be constructed generally in accordance with the layout indicated on Plan of
      Development prepared by PMM, Drawing Number 4740-56b dated 21 June 2004 and the
      conditions contained in this approval.
83.   The road to the east that will connect to Swanbourne Way ultimately shall have a 20 metre wide
      road reserve between the entry road and Lot 6 on RP 80412 and can reduce to 16 metre wide
      road reserve along the eastern frontage of proposed lots 124 and 125. This road shall have an
      11 metre wide pavement (kerb to kerb) for its full length.
84.   All new roads will be required to comply with Council requirements for carriage widths. The road
      design may not be strictly in accordance with Council’s Engineering Standards but this is
      because of the required incorporation of swales, vegetation retention and pedestrian/bikeway
      paths and will be to the satisfaction of Council.
85.   The access to the new school shall be in accordance with the approved drawings in
      Development Permit 23468 DA. This roundabout will also service the contemporary parcels on
      the east of the development. Council may consider a separate egress point from the school site
      if Australian Standards requirements for sight distance and a traffic loads analysis indicates that
      roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April 2003 have
      enough capacity to cater for the increase in traffic generated by this modification.




                                                                                          Page 15 of 26

Page 16

                                                                                               23616DA


86.   The developer will also be required to undertake the necessary modifications to the existing
      school’s access and car parking in accordance with Eraland Consulting Pty Ltd Drawing Nos.
      01691-1 Amdt D, 01691-2 Amdt E and 01691-3 Amdt D Dated July 2003. The developer will
      have to construct the new road on an alignment that allows the school access to be constructed
      in accordance with this plan and will also construct the modified car park and access at the
      existing school. Discussion is to be held with Queensland Education about programming of
      construction.
87.   Access to each lot shall be constructed to the standards and requirements of the Council.
88.   The following frontage works shall be constructed across all road frontages within the site:-
      88.1. Construction of new kerb;
      88.2. Vehicular access to each lot;
      88.3. Associated stormwater drainage, generally in accordance with WBM’s Report of 2/10/02
            and as subsequently modified in their letter to Council of 14/11/02.;
      88.4. New stormwater management to correct the current problem of stormwater discharge
            from the road reserve to the Noosa Primary School;
      88.5. Hot mix correction to existing pavement as required;
      88.6. Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the
            footpath alignment.
      88.7. The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees.
      A Development Permit for Operational Works shall be obtained prior to undertaking these
      works.
89.   Alterations to lot sizes, number of lots and layout may be required following the issue of a
      Development Permit for Operational Works in respect of the internal roadworks design.
90.   The developer will construct industrial strength crossovers to two parcels at the end of the
      proposed cul-de-sacs to enable the largest service vehicle to do a three point turn and leave the
      street in a forward direction. This will be included in an operational works application.
Bikeways/Pedestrian Paths
91.   The developer will construct a path along the Beckmans Road frontage of existing Lot 7. The
      Beckmans Road and new road bikeways should be constructed generally as indicated on
      Eppell Olsen & Partners Drawing No 3866-003 Issue A dated October 2002. The bikeway on
      the Beckmans Road frontage may need to be aligned within the open space area but any
      alignment would require vegetation retention.
92.   The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lots 109 -
      110 to the northern constructed end of Swanbourne Way in the form of a path and timber bridge
      2 metres wide.
93.   Internally (that is the area of the development north of Plan 3866-003) the bikeway network
      should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03 with the exception of
      bikes being allowed in the open space area except the Swanbourne Way crossing. The
      pedestrian paths indicated in the open space on the plan will need to have their alignment and
      need agreed to in the Open Space Management Plan.
94.   The developer will also construct a bikeway within the site along the road that allows connection
      to the new road linkage, through the parcel to the east, to Swanbourne Way required by this
      permit.
95.   The developer will also be required to pay contributions towards the construction of the bikeway
      link to the Lake Entrance Boulevard Network. The amount of the contribution shall be calculated
      at the rate current at the date of payment, subject to CPI changes.
      An estimate only of the contributions payable for each Stage is as follows:-

                                                                                          Page 16 of 26

Page 17

                                                                                                 23616DA


                              Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
               Stage
                                A            B1           B2            B3            C             D
             Current at     December       March         March        March        March       December
               CPI            2004         2010          2010         2010         2010          2004
              Bikeway        $ 21,944      $ 5,338      $ 6,524      $ 10,083     $ 17,200       $ 1,247

        Contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage of
        the reconfiguration.
        With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
        contributions that will be assessed at the time of the future applications.
Sewer
96.     The sewer network shall be generally in accordance with the approved ‘Sewerage Reticulation
        Master Plan’ - Drawing 01691-130B by Eraland Consulting.
97.     Design for a sewerage system to connect all new lots within the site to Council's existing
        sewerage reticulation system shall be to the standards and requirements set out in Council’s
        Engineering Design Standards. If the design requires the construction of a pump station and a
        rising main, the connection point to Council's existing system will be nominated by the Manager
        - Land Development.
98.     Detailed design drawings and calculations shall be submitted with an application for a
        Development Permit for Operational Works in respect of water or sewer works. To avoid conflict
        with other underground pipes or services, all existing and proposed services required by the
        development shall be shown on the plans.
99.     All connections to sewer system shall be carried out either by Council or by a Council approved
        Contractor and at no cost to Council. Any connection to a water main shall be undertaken by
        Council.
Water
100. The water supply network shall be generally in accordance with the approved ‘Water Supply
     Master Plan’ - Drawing 01691-140C by Eraland Consulting.
101. An application for a Development Permit for Operational Works for services shall be obtained
     prior to commencement of works.
102. A reticulated water supply system shall be provided to connect to Council’s existing systems,
     including a metered water connection to the property boundary of each proposed new lot within
     the site. All fees for the supply of water meters shall be paid to the Council.
103. Fire hydrants are to be provided throughout the development in accordance with Council and
     Queensland Fire Service standards.
104. Provision shall to be made in all parks locations for a water connection and should conform to
     the recommendations of the Bushfire Management Plans. Under-road service conduits shall be
     provided to ensure a connection is available.
Power, Telecommunications and Street Lighting
105. Any alteration of a public utility or other facility necessitated by the development of the land or
     associated construction works either internal or external to the site shall be at no cost to
     Council.
106. All lots are to be connected to underground power and telecommunications.
107. An underground electricity service shall be provided to each lot if not already provided.
        In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
        with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.


                                                                                           Page 17 of 26

Page 18

                                                                                             23616DA


      The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to Council endorsing the Plan of Survey.
      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
      be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
      purchasers of the proposed lots.
108. Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient
     rating to the reasonable satisfaction of Council and shall generally be provided in accordance
     with the principles of Council’s Engineering Design Standards, section 11.3.3.
109. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
     provision of new telephone services to the proposed lots. In this regard written confirmation
     from an approved telecommunication agency shall be submitted to the Council prior to Council
     endorsing the Plan of Survey.
Engineering Works Designs
110. A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare
     engineering drawings and specifications for stormwater designs and shall be submitted in
     conjunction with an application for a Development Permit for Operational Works.
111. All designs for engineering works involving the construction of pavements, kerb and channel,
     vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
     reticulation shall be prepared generally in accordance with the requirements of Council's
     Engineering Design Standards (except where affected by the Water Sensitive Urban Design
     Principles), shall reference where applicable to Council’s Standard Drawings and shall
     incorporate best engineering practice.
112. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil
     Engineer shall be submitted to Council for each Development Permit for Operational Works
     issued pursuant to this permit. The engineer shall certify that he has supervised those works
     and that they have been completed in a workman like manner in accordance with good
     engineering practice and in accordance with that permit.
113. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
     specifications for all engineering works, which shall be submitted in conjunction with an
     application for a Development Permit for Operational Works. In this regard a DXF/DWG file on
     GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
     application for Operational Works. To facilitate production of As Constructed drawings it is
     suggested that all design drawings are submitted in the Asset Design and As Constructed
     (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au ).
114. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
     for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
     type of all services and structures. All of which shall be submitted to Council for checking and
     for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.




                                                                                        Page 18 of 26

Page 19

                                                                                               23616DA


General
115. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
     Stock Route Management) Act 2002 are to be controlled on the site prior to Council
     endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
     pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
     threaten environmentally significant areas of the site such as riparian zones and areas of
     natural vegetation.
      Where class 3 plants are removed as a result of this condition and there is not sufficient natural
      regeneration of native species, the areas shall be replanted with endemic native species so that
      a sustainable natural ecosystem is restored.
      Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
      weed treatment and replanting is complete.
116. The following steps shall be undertaken prior to commencement of any construction:-
      116.1.The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention
            to commence works.
      116.2.The Principal Contractor or any of his subcontractors shall not undertake any works
            unless each contractor has public liability insurance in the sum of $10,000,000 and copies
            of current public liability insurance policies are submitted to Council’s inspector.
      116.3.The Principal Contractor shall nominate a site representative and give a telephone
            number that can reach the site representative at any time during a 24-hour day.
      116.4.The site representative shall arrange to meet on-site with Council's Inspector to obtain
            Council's requirements for construction of access.
      116.5.All signage, including that for safety during construction, shall be in accordance with the
            Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads
            Division) Roadworks Signing Guide.
117. Prior to excavating any material to be used for fill on this site, a Development Permit for
     Operational Works shall have been obtained for the site from which the excavated material is
     taken. A soil report shall be submitted with the application certifying that the material is free of
     acid sulphate soils and other deleterious materials.
118. The transportation of all materials to and from the site shall be undertaken in a manner such
     that no particulate matter escapes onto a public road. All vehicles carrying materials either to or
     from the site shall be covered to prevent materials including dust being windblown from the
     vehicle.
119. A program of works is to be submitted at the Prestart meeting detailing the construction
     schedule and proposed environmental protection measures.
      Where the program is changed for any reason whatsoever, a copy of the revised program shall
      be submitted to Council’s Works Inspector within seven (7) days.
120. For the following classes of work associated with development, a Development Permit for
     Operational Works must be obtained prior to commencement of works relating to that class of
     work. The application may combine any or all of these classes of work:
      120.1.Site Civil Works;
      120.2.Roadworks;
      120.3.Stormwater Drainage;
      120.4.Frontage works;
      120.5.Sewer reticulation including new mains, relocations, diversions, pump stations and rising
                 mains;
      120.6.Water reticulation;

                                                                                          Page 19 of 26

Page 20

                                                                                                 23616DA


      120.7.Site Filling;
      120.8.Excavation of materials to fill another site; and
      120.9.Landscaping.
121. Operational works shall be carried out in a manner that prevents:
      121.1.Pollution of a waterway;
      121.2.Dust/sand nuisance to residents in the vicinity;
      121.3.Transfer of dirt and debris onto a public road;
      121.4.Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries);
      121.5.Excessive traffic delays (less than 5 minute delays); and
      121.6.Diminution of neighbourhood amenity (long term parking of employees vehicles, parking
            of construction equipment etc.).
122. A traffic management plan shall be submitted in conjunction with a Development Permit for
     Operational Works involving road or drainage works. The plan shall address all phases of
     construction to be undertaken on site.
123. Where operational works are likely to affect nearby residents and the Noosa Primary School, at
     least 3 days notice of commencement of work, the name of the site supervisor, and a 24 hour
     contact telephone number shall be distributed to affected residents.
124. Earthworks shall be generally contained within existing and proposed road reserves. Where
     earthworks are required for the provision of services, existing contours shall be restored.
125. Fill imported to the site may only be from a site licensed with The Environmental Protection
     Agency or from a site for which a Development Permit for Operational Works has been issued
     approving the export of fill.
126. A registered practicing Geotechnical Engineer shall test the existing ground conditions for
     suitability of placing additional fill, prior to such fill being placed.
127. Any existing fill or natural materials on the site or with the extent of approved works external to
     the site which do not satisfy a Geotechnical Engineer's requirements shall be removed and
     replaced with suitable material.
128. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No.
     Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and
     shall certify that all lots have been compacted to the required standard.
129. Following completion of the filling works and prior to endorsement of the Plan of Survey, the
     registered practicing Geotechnical Engineer supervising the works shall submit compaction
     tests across the entire filled areas and a site classification report for each lot subject to filling.
     The extent of fill and each lot site classification shall be shown on a metes and bounds survey
     plan.
130. An appropriate property notation shall be placed on Council's rates records to advise
     prospective purchasers of lots that have been filled that special foundations requirements will
     apply.
131. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining
     properties to the reasonable satisfaction of the Manager - Land Development. A Development
     Permit for Building Works shall not be granted until a Development Permit for Operational
     Works has been issued in regard to the drainage scheme.
132. The stormwater discharge from the site shall be designed such that there is no net increase in
     the rate of discharge as a result of the development for storm events up to 100 year ARI.




                                                                                            Page 20 of 26

Page 21

                                                                                              23616DA


133. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of
     the existing site stormwater drainage system shall be submitted in conjunction with a
     Development Permit for Operational Works. Such calculations shall include any remedial
     measures necessary to rectify defects in the existing system. Where proposed site drainage is
     to be connected to the existing system, the calculations shall clearly demonstrate the adequacy
     of the existing drainage network to accept the additional stormwater flows.
134. Stormwater drainage shall include measures to protect proposed allotments from run-off from or
     to surrounding land. The design shall also address controls for gross pollutants, nutrient runoff,
     oil and grease, and silt and sediment (in accordance with the approved Environmental
     Management Plan).
135. Underground stormwater systems shall be designed in accordance with Noosa Council’s
     Engineering Design Standards, and shall be connected, where possible to Council's existing
     drainage systems.
136. An easement of minimum width 4.0 metres shall be granted in favour of Council over any
     stormwater pipes that traverse private property.
137. The design plans detailing surface levels, which shall be controlled across the site of the
     development to create a major storm event overland flow path system to cater for the 1:100
     year design storm, shall be submitted in conjunction with a Development Permit for Operational
     Works. Any overland flow from external catchments shall be accepted and incorporated in the
     major event surface flow drainage system through the site. Overland flows shall be discharged
     in a safe manner and the product of velocity time depth shall not exceed 0.4 m²/sec.
138. The design plans are to show how stormwater runoff within and from the site is to be controlled
     both during construction and permanently. The plans are to indicate measures to be taken to
     prevent erosion and the export of sediment from the site in accordance with the approved
     Environmental Management Plan.
139. An easement for drainage in favour of Council shall be created over the full length and width of
     major storm event surface flow paths within the site at no cost to Council.
140. A minimum floor level freeboard of 0.5m shall be provided for habitable and storage areas
     above the top water level of the stormwater overland flows.
141. Details of any proposed estate entrance signage shall be submitted in conjunction with an
     application for a Development Permit for Operational Works for either roadworks or
     landscaping. A $1500 fee shall accompany the application.
      The design shall conform to Council's "Signage Policy - Development Estate Entrance".
142. The proposed names of new roads (public and private) and parks shall be lodged with the
     application for a Development Permit for Operational Works.
      Names are to be selected from any of the following categories:-
      142.1.Easily pronounced words of Murri languages.
      142.2.Names or words of local significance or historical interest.
      142.3.Flora, fauna, industry, topographical, geological and similar features and terms relative to
            the district.
      142.4.Surnames of persons of merit or historical significance.       (Personal names should be
            avoided.)
      Approval will not be given to a name that is the same or similar to the name of another road in
      the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
      pronounced, or may cause confusion to emergency services are to be avoided.
143. All street signs on new roads (public and private) and parks shall be erected prior to works
     being accepted on maintenance.


                                                                                         Page 21 of 26

Page 22

                                                                                              23616DA


144. The person acting on this permit shall apply and obtain for all other necessary permits including
     crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any
     other approvals required under any other Act.
145. Prior to commencement of work relating to a Development Permit for Operational Works, the
     Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
     pavement, footpath, kerb and gutter, or other Council property damaged as a result of
     construction of the proposed development.
      If any person acting under this permit damages any Council property or facilities (such as
      underground drainage, water supply and sewerage) , through any cause whatsoever in the
      course of, directly or indirectly carrying out development, that person shall forthwith notify the
      Manager - Land Development and shall forthwith rectify that damage at its cost and to the
      satisfaction of the Manager - Land Development. Alternatively, the Applicant may request the
      Council to carry out the rectification works.
      Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
      undertaken by either Council or a Council approved contractor.
      In all cases, Council reserves the right to carry out rectification works in an emergency and
      where no reasonable attempt has been made to complete the rectification works as part of the
      development.
      All costs incurred by Council in any rectification works shall be repaid to Council prior to the
      endorsement of the Plan of Survey.

5     REFERRAL AGENCY CONDITIONS
Not applicable.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the development
approval conditions.

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Approval of this development application will trigger an Infrastructure Charge in accordance with
      the Coastal Major Road Network Infrastructure Charges Plan. An estimate only of the amounts
      payable for each Stage is as follows:-

                            Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
             Stage
                              A            B1           B2            B3            C             D
           Current at     December       March         March        March        March       December
             CPI            2004         2010          2010         2010         2010          2004
           CMRNICP        $ 195,132     $ 54,644     $ 66,787     $ 103,217     $ 176,076     $ 12,765

      These amounts will subject to variations in the Consumer Price Index, All Groups Brisbane until
      the date of payment. Infrastructure Charge Notices will be issued in accordance with Chapter 5
      of the Integrated Planning Act 1997 and will require payment of the charges prior to the
      endorsement of the Plan of Survey for each Stage.
      With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
      Infrastructure charges that will be assessed at the time of the future applications.
2.    Payment via credit card transaction will not be an acceptable method of payment for
      development contributions conditioned in this permit or for infrastructure charge notices issued
      separately.

                                                                                         Page 22 of 26

Page 23

                                                                                                     23616DA


3.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service levy is required to
      be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved
      form issued by the Building and Construction Industry (Portable Long Service Leave) Authority
      that confirms that the requirements of the Act have been satisfied. A statutory declaration
      outlining the cost of the operational works must be submitted to Council with the lodgement of
      any application for operational works over the site.
Additional Advisory Note
4.    The applicant is advised that development contributions and infrastructure charges applicable to
      this development approval have been based on the following Uses Class/ Uses and applicable
      quantities:-
                                                                 Approved Development
               Existing Development
                                              Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003

         Existing Use          Existing        Approved Use Class /
                                                                                  Approved Quantity
         Class / Use           Quantity               Use
                                                                          Stage A = 88 house lots
                                                                          Stage B1 = 18 house lots
                                                                          Stage B2 = 16 house lots +
      Detached House       1 x vacant lot    Detached House               6 group house lots
                                                                          Stage B3 = 34 house lots
                                                                          Stage C = 58 house lots
                                                                          Stage D = 5 house lots

      With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
      Infrastructure contributions & charges that will be assessed at the time of the future
      applications.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not harm
Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage
or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable.
9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable.




                                                                                               Page 23 of 26

Page 24

                                                                                                                23616DA


10      FURTHER DEVELOPMENT PERMITS REQUIRED

    Type of Development Permit required                        Subject of the required Development Permit

    Development Permit for Material Change of Use              Dwelling Houses and Dwelling Units

    Development Permit for Building Works                      Dwelling Houses, Dwelling Units and Estate
                                                               Sales Office

    Development Permit for Operational Works                   Landscaping, car parking and access, frontage
                                                               works, stormwater disposal, sediment and
                                                               erosion controls, filling of the site

11      SELF ASSESSABLE CODES

Not applicable.

12      SUBMISSIONS
Not applicable.

13      REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.

14      RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is attached.

15      OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available on
line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Decision Notice History
24 February 2005            Original Decision Notice.
19 February 2007 -          Change to Existing Approval with amendments to Conditions 35 & 66.
7 May 2008                  Change to Existing Approval with amendments to Condition 66
21 June 2010                Change to Existing Approval with amendments to Conditions 81, 95 &
                            Advisory Note 1 and addition of Advisory Note 4.

Yours faithfully,




Denis Wallace
Senior Development Planner

Encl:   Appeal Rights
        4 x Infrastructure Charge Notices (for changes to Stages B & C)
       IC 206 Rev 1 = stage B1 (applicable to "current" registered lot: 800 SP 196520)
       New IC Rev 0 = stage B2 (applicable to "current" registered lots: 800 SP 196520 & part 500 SP 190382)
       New IC Rev 0 = stage B3 (applicable to "current" registered lot: 800 SP 196520)
       IC 207 Rev 1 = revised stage C (applicable to "current" registered lot: 7 RP 80412)


                                                                                                          Page 24 of 26

Page 25

                                                                                                           23616DA


                                                      Appeal Rights
                                                      SUNSTAINABLE PLANNING ACT      2009     &   SUSTAINABLE
                                                      PLANNING REGULATION 2009



                                                                 (3)    However, a submitter may not appeal if the
                                                                        submitter—
The following is an extract from the Sustainable
Planning Act 2009 (Chapter 6).                                          (a) withdraws     the submission      before   the
                                                                            application is decided; or
MATERIAL CHANGE OF USE, RECONFIGURING A                                 (b) has given the assessment manager a
LOT & OPERATIONAL WORKS                                                     notice under section 339(1)(b)(ii).
Division 8 - Appeals to court relating to development            (4)    The appeal must be started within 20 business
applications                                                            days (the submitter’s appeal period) after the
461      Appeals by applicants                                          decision notice or negotiated decision notice is
(1)     An applicant for a development application may                  given to the submitter.
        appeal to the court against any of the following-        463   Additional and extended appeal rights for
        (a) the refusal, or the refusal in part, of a                  submitters   for  particular development
            development application;                                   applications
        (b) any condition of a development approval,             (1)    This section applies to a development
            another matter stated in a development                      application to which chapter 9, part 7
            approval and the identification or inclusion                applies.
            of a code under section 242                          (2)    A submitter of a properly made submission for
        (c) the decision to give a preliminary approval                 the application may appeal to the court about a
            when a development permit was applied                       referral agency’s response made by a
            for;                                                        prescribed concurrence agency for the
                                                                        application.
        (d) the length of a period mentioned in section
                                                                 (3)    However, the submitter may only appeal
            341;;
                                                                        against a referral agency’s response to the
        (e) a deemed refusal of the development                         extent it relates to—
            application.
                                                                        (a) if the prescribed concurrence agency is the
(2)     An appeal under subsection (1)(a), (b), (c) or                      chief    executive        (environment)—
        (d) must be started within 20 business days                         development for an aquacultural ERA; or
        (the applicant’s appeal period) after—
                                                                        (b) if the prescribed concurrence agency is the
        (a) if a decision notice or negotiated decision                     chief executive (fisheries)—development
            notice is given—the day the decision notice                     that is—
            or negotiated decision notice is given to the
            applicant; or                                                   (i)    a material change of use of premises
                                                                                   for aquaculture; or
        (b) otherwise—the day a decision notice was                         (ii) operational work that is the removal,
            required to be given to the applicant.                                 damage or destruction of a marine
(3)     An appeal under subsection (1)(e) may be                                   plant
        started at any time after the last day a decision        (4)    Despite section 462(1), the submitter may
        on the matter should have been made.                            appeal against the following matters for the
462     Appeals by submitters - general                                 application even if the matters relate to code
(1)     A submitter for a development application may                   assessment—
        appeal to the court only against-                               (a) a decision about a matter mentioned in
        (a) the part of the approval relating to the                        section 462(2) if it is a decision of the chief
            assessment manager’s decision about any                         executive (fisheries);
            part of the application requiring impact                    (b) a referral agency’s response mentioned in
            assessment under section 314; or                                subsection (2).
        (b) the part of the approval relating to the             464   Appeals by advice agency submitters
            assessment       manager’s     decision    under     (1)    Subsection (2) applies if an advice agency, in
            section 327.
                                                                        its response for an application, told the
(2)     To the extent an appeal may be made under                       assessment manager to treat the response as
        subsection (1), the appeal may be against 1 or                  a properly made submission.
        more of the following—                                   (2)    The advice agency may, within the limits of its
        (a) the giving of a development approval;                       jurisdiction, appeal to the court about—
        (b) any provision of the approval including—                    (a) any part of the approval relating to the
            (i)     a condition of, or lack of condition for,               assessment manager’s decision about any
                    the approval; or                                        part of the application requiring impact
                                                                            assessment under section 314; or
            (ii)    the length of a period mentioned in
                    section 341 for the approval.
                                                                                                     Page 25 of 26

Page 26

                                                                                                 23616DA


      (b) any part of the approval relating to the       (1)    A person to whom a notice under section
          assessment manager’s decision under                   378(9)(b) giving a decision to change or cancel
          section 327                                           a condition of a development approval has
(3)   The appeal must be started within 20 business             been given may appeal to the court against the
      days after the day the decision notice or                 decision in the notice.
      negotiated decision notice is given to the         (2)    The appeal must be started within 20 business
      advice agency as a submitter.                             days after the day the notice of the decision is
(4)   However, if the advice agency has given the               given to the person.
      assessment manager a notice under section          For Building Works Only
      339(1)(b)(ii), the advice agency may not appeal    532    Appeals by applicants
      the decision.
                                                         (1)    If—
465   Appeals about decisions relating to
      extensions for approvals                                  (a) a person has been given, or is entitled to be
                                                                   given—
(1)   For a development approval given for a
      development application, a person to whom a                   a.        an information notice under the
      notice is given under section 389, other than a                         Building Act about a decision
      notice for a decision under section 386(2), may                         other than a decision under that
      appeal to the court against the decision in the                         Act made by the Queensland
      notice.                                                                 Building Services Authority; or
(2)   The appeal must be started within 20 business                 b.        an information notice under the
      days after the day the notice of the decision is                        Plumbing and Drainage Act 2002
      given to the person.                                                    about a decision under part 4 or
                                                                              5 of that Act; or
(3)   Also, a person who has made a request under
      section 383 may appeal to the court against a             (b) a person—
      deemed refusal of the request                                 a.        was an applicant for a building
(4)   An appeal under subsection (3) may be started                           development approval; and r
      at any time after the last day the decision on                b.        is dissatisfied with a decision
      the matter should have been made.                                       under the Building Act by a
                                                                              building certifier or referral
466   Appeals about decisions           relating   to
                                                                              agency about inspection of
      permissible changes)
                                                                              building work the subject of the
(1)   For a development approval given for a                                  approval; the person may appeal
      development application, the following persons                          against the decision to a building
      may appeal to the court against a decision on a                         and development committee.
      request to make a permissible change to the
                                                         (2)    An appeal under subsection (1) must be started
      approval—
                                                                within 20 business days after the day the
      (a) if the responsible entity for making the              person is given notice of the decision.
         change is the assessment manager for the
                                                         (3)    If—
         application—
                                                                (a) under the Building Act, a person makes an
         (i)   the person who made the request; or
                                                                    application other than        a   building
         (ii)   an entity that gave a notice under                  development application to a local
                section 373 or a pre-request response               government; and
                notice about the request
                                                                (b) the period required under that Act for the
      (b) if the responsible entity for making the                  local government to decide the application
         change is a concurrence agency for the                     (the decision period) has passed; and
         application—the person who made the                    (c) the local government has not decided the
         request..
                                                                    application; the person may appeal to a
(2)   The appeal must be started within 20 business                 building and development committee
      days after the day the person is given notice of              against the lack of the decision and for the
      the decision on the request under section 376.                committee to decide the application as if it
(3)   Also, a person who has made a request under                   were the local government.
      section 369 may appeal to the court against a      (4)    An appeal under subsection (3) must be started
      deemed refusal of the request.                            within 20 business days after the end of the
(4)   An appeal under subsection (3) may be started             decision period.
      at any time after the last day the decision on
      the matter should have been made.
467   Appeals about changing or cancelling
      conditions     imposed      by     assessment
      manager or concurrence agency



                                                                                            Page 26 of 26

Used in these records

About this file

File size
122 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616DA - Change to Existing Approval [As Published].pdf · 122 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.