23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
Acid Sulphate Soils Management Plan
64. An Acid Sulfate Soils (ASS) Management Plan must be provided for any excavation works
undertaken in areas of the site below 5m AHD. The Management Plan must outline all
proposed ASS investigation and management procedures, which are to be undertaken in
accordance with State Planning Policy 2/02 "Planning and Managing Development Involving
Acid Sulfate Soils".
Reconfiguration Plans
65. The Lot Reconfiguration for the residential areas will be in accordance with the following Plans
by PMM Group and as may be amended by these conditions:
65.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1 to
4; and
65.2. Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2
March 2004.
Staging
66. The staging of the Lot Reconfiguration for the residential areas will be in accordance with the
Plan titled “Construction Staging Plan” by PMM Group - Reference 6812-61H and dated 8
September 2003.
General
67. Security in the form of a cash bond or trading bank guarantee to the sum of $400,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
reduced to $100,000 upon completion of all construction works (except building construction)
and the balance returned after the completion of the water quality monitoring and management
plan requirements.
Plan Sealing and Easements
68. For the purpose of these conditions, the following definitions apply: -
68.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed
by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
68.2. A registered Professional Civil Engineer means a civil engineer who is registered in
Queensland pursuant to the Professional Engineers Act 1988.
68.3. Carparking area means a parking area as defined in the Schedule to the Shire of Noosa
Planning Scheme inclusive of manoeuvring areas and access from the roadway.
68.4. The person acting on this permit means any person or company who undertakes
development pursuant to this permit.
68.5. AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS 2890.1-
1993.
68.6. Principal Contractor means the person nominated by the Applicant and approved by the
Manager - Land Development at a pre-start meeting as being responsible for the major
component of works associated with a Development Permit for Operational Works of any
works on the site.
69. Conditions of any Development Permit for a Material Change of Use of premises relevant to
each stage of this lot reconfiguration shall be complied with prior to Council endorsement of the
Plan of Survey.
2
70. The proposed contemporary residential lots shall have a minimum size of 600 m .
71. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with the
fees prescribed in Council's adopted fee schedule.
Page 13 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.