23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
144. The person acting on this permit shall apply and obtain for all other necessary permits including
crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any
other approvals required under any other Act.
145. Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter, or other Council property damaged as a result of
construction of the proposed development.
If any person acting under this permit damages any Council property or facilities (such as
underground drainage, water supply and sewerage) , through any cause whatsoever in the
course of, directly or indirectly carrying out development, that person shall forthwith notify the
Manager - Land Development and shall forthwith rectify that damage at its cost and to the
satisfaction of the Manager - Land Development. Alternatively, the Applicant may request the
Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the development
approval conditions.
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Approval of this development application will trigger an Infrastructure Charge in accordance with
the Coastal Major Road Network Infrastructure Charges Plan. An estimate only of the amounts
payable for each Stage is as follows:-
Per Staging Plan PMM Group - Ref 6812-61H dated 8 September 2003
Stage
A B1 B2 B3 C D
Current at December March March March March December
CPI 2004 2010 2010 2010 2010 2004
CMRNICP $ 195,132 $ 54,644 $ 66,787 $ 103,217 $ 176,076 $ 12,765
These amounts will subject to variations in the Consumer Price Index, All Groups Brisbane until
the date of payment. Infrastructure Charge Notices will be issued in accordance with Chapter 5
of the Integrated Planning Act 1997 and will require payment of the charges prior to the
endorsement of the Plan of Survey for each Stage.
With regard to Stage D, the future development of the Forest Cluster Precinct will attract further
Infrastructure charges that will be assessed at the time of the future applications.
2. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge notices issued
separately.
Page 22 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.