Council archive · source document
23616DA - Change to Existing Approval [As Published] · 132003.221132.6
23616DA
133. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of
the existing site stormwater drainage system shall be submitted in conjunction with a
Development Permit for Operational Works. Such calculations shall include any remedial
measures necessary to rectify defects in the existing system. Where proposed site drainage is
to be connected to the existing system, the calculations shall clearly demonstrate the adequacy
of the existing drainage network to accept the additional stormwater flows.
134. Stormwater drainage shall include measures to protect proposed allotments from run-off from or
to surrounding land. The design shall also address controls for gross pollutants, nutrient runoff,
oil and grease, and silt and sediment (in accordance with the approved Environmental
Management Plan).
135. Underground stormwater systems shall be designed in accordance with Noosa Council’s
Engineering Design Standards, and shall be connected, where possible to Council's existing
drainage systems.
136. An easement of minimum width 4.0 metres shall be granted in favour of Council over any
stormwater pipes that traverse private property.
137. The design plans detailing surface levels, which shall be controlled across the site of the
development to create a major storm event overland flow path system to cater for the 1:100
year design storm, shall be submitted in conjunction with a Development Permit for Operational
Works. Any overland flow from external catchments shall be accepted and incorporated in the
major event surface flow drainage system through the site. Overland flows shall be discharged
in a safe manner and the product of velocity time depth shall not exceed 0.4 m²/sec.
138. The design plans are to show how stormwater runoff within and from the site is to be controlled
both during construction and permanently. The plans are to indicate measures to be taken to
prevent erosion and the export of sediment from the site in accordance with the approved
Environmental Management Plan.
139. An easement for drainage in favour of Council shall be created over the full length and width of
major storm event surface flow paths within the site at no cost to Council.
140. A minimum floor level freeboard of 0.5m shall be provided for habitable and storage areas
above the top water level of the stormwater overland flows.
141. Details of any proposed estate entrance signage shall be submitted in conjunction with an
application for a Development Permit for Operational Works for either roadworks or
landscaping. A $1500 fee shall accompany the application.
The design shall conform to Council's "Signage Policy - Development Estate Entrance".
142. The proposed names of new roads (public and private) and parks shall be lodged with the
application for a Development Permit for Operational Works.
Names are to be selected from any of the following categories:-
142.1.Easily pronounced words of Murri languages.
142.2.Names or words of local significance or historical interest.
142.3.Flora, fauna, industry, topographical, geological and similar features and terms relative to
the district.
142.4.Surnames of persons of merit or historical significance. (Personal names should be
avoided.)
Approval will not be given to a name that is the same or similar to the name of another road in
the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
pronounced, or may cause confusion to emergency services are to be avoided.
143. All street signs on new roads (public and private) and parks shall be erected prior to works
being accepted on maintenance.
Page 21 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616DA - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.