28 March 2022
Patrick Murphy
Noosa Council
RE: Change Representations – RAL21/0017 – 25 Pavilion St, Pomona
The following change representations are based on agreed meetings between the
applicant (Noel Shipp), Doug Reynolds (Engineer) and Council. The relevant conditions
are included below with the suggested deletions (strikethrough) and additions (bold).
Condition 4
4. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 3 February 12
April 2026, unless an application to extend the currency period is approved by Council.
The approval should match the negotiated decision notice issue date.
--------------------------------------------------------------------------------------------------------------------
Condition 29b)
29. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. extension of the site stormwater system to accommodate stormwater from
Pavilion Street;
b. cut off drains at the eastern interface of Lots 1 and 9 to intercept runoff from
external properties, including registration of drainage easements over these drains
in favour of the upslope properties;
c. collection and discharge of stormwater to the proposed detention basin,
including the provision of Level II inter-allotment drainage for lots which do not fall
to the street and provision of kerb adapters for all new lots which do fall to the
street.
Council’s development engineer has agreed to delete the condition.
Condition 35
The new road must join smoothly with the existing formation of Pavilion Street. The works
must be undertaken in accordance with an Operational Works approval, generally in
accordance with TOD Consulting’s plan 21556-SK101: “Preliminary Design – General
Arrangement”, Rev C, dated 11/11/2021 and be designed and constructed in accordance
with Council’s Planning Scheme Policy 6 – Engineering Design Standards. The works
must include in particular:
a. reserve and formation widths to a “Local Road” standard;
b. sealing, drainage, kerbing and channelling;
c. construction of pedestrian footpaths in accordance with the conditions of this
Decision Notice;
d. installation of street and pathway lighting;
See the original