Original source · versioned page text
Attachment B Eng report
Attached to the e-mail MCU14/0084 IDAS Form 1 Report, Attachment A Plans, Attachment B (1) Engineering report Email 1 of 4.
3.5 Parking would be prohibited in the access driveway running from Seaview Tce to the site, and in the Council Beach Carpark. e Contiguous Piling Complete ground injection grouting (to ensure there is absolutely minimal disturbance to surface sands,) temporary access tracks and/or platforms, and install reinforced CFA contiguous pile walls. The grout piling rig can be off-loaded in Seaview Tce and driven on rubber tracks to the site, as discussed with a Piling contractor, cement grout and reinforcing is to be delivered progressively as the piling proceeds. Temporary parking and materials storage will be at the south west corner of the site. e Excavation Works A small excavator will be sufficient to remove and load sand into normal-sized tip trucks for removal from site, perhaps with a small hoist, Conveyor or crane from lower terraced areas. Stockpiling of material on site will be limited by Geotechnical approval to avoid localised surface slips. Subject to more detailed analysis it may be possible to stockpile some materials in areas where the stiff clays and/or weathered sandstone are closer to the surface. Temporary access ramps & terraces can then be constructed below the contiguous piled walls to create additional temporary parking and storage areas across the site. Refer to our drawing 14517 - P4. e Foundations and Screw Piling Once the main bulk excavation levels have been achieved, stable terracing can be prepared to expand access, parking and material storage on-site. The Screw Piling Rig can be brought in on rubber mats from Seaview Terrace, and piles delivered in short lengths and welded together on-site as lengths of pile are installed. e Structural Works The foundation beams, pile caps, floor beams, slabs, columns, and load-bearing walls etc, can be constructed by traditional methods with materials being delivered readily via the access driveway as required. The length of construction materials will be limited by the size of delivery vehicles which can safely access the bitumen driveway. Construction of Retaining Walls and Excavations The majority of the site is sloping at approximately 26° towards the north-east while the south-east and north-west areas of the block slope much more steeply at around 32° towards the east.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.