2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Currency Period
4. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 31 August
2024, unless an application to extend the currency period is approved by Council.
Acoustic Measures for Residential Lots & Office Lot
5. Prepare and submit to Council for approval with an Operational Works application a
revised acoustic report which includes measures to mitigate noise generate from the
shopping centre operations and equipment, including deliveries, truck movements and
rubbish collection. This report should consider attenuation at the noise source as well
as a noise barrier along the shared boundary of Lots 19 and 21. All measures to mitigate
noise must be implemented prior the submission of the subdivision plan to Council.
Noise attenuation is required to achieve the following acoustic quality for potential
residential uses on Lots 17-19. The measurement location must include receivers being
placed at the closest point to the future residential and office buildings.
Criteria (measured at the receptor)
Sensitive receptor Time of Day dB(A)
LAeq,adj,1hr 1 LA1,adj,1hr2
Daytime and evening
35 45
(habitable spaces)
Dwelling (indoors)
Night-time (sleeping
30 40
areas)
1
Acoustic descriptor/noise target for continuous noise sources (eg. Mechanical plant).
2
Acoustic descriptor/noise target for transient impacts arising from loading dock
activities (e.g. truck movements, reversing alarms, compactor, trolley etc.)
Water & Sewer Connections
6. An underground connection to reticulated water and sewerage must be provided to each
lot in accordance with the standards and requirements of Northern SEQ Distributor–
Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
External Works
7. Prior to the sealing of the survey plan a vehicle access to proposed Lot 23 must be
constructed at no cost to Council. The works must be undertaken in accordance with an
Operational Works approval, be generally in accordance with drawing number 1856-
R08 Revision J prepared by Barlow Shelley and include an access extending from the
existing roundabout in Walter Hay Drive to the property boundary.
8. Prior to the sealing of the survey plan a new emergency vehicle exit from proposed Lot
23 must be constructed at no cost to Council. The works must be undertaken in
accordance with an Operational Works approval. The exit must extend from the property
boundary to the existing formation of the south bound lanes of Walter Hay Drive and be
for emergency vehicles only. The exit must:
8.1. be located in the north western section of the Walter Hay Drive frontage
Page 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.