Original source · versioned page text
2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
8.2. include a crossing in the median of Walter Hay Drive that is sufficient to permit
emergency vehicles to exit the site and access the north bound lanes of Walter
Hay Drive
9. Prior to the sealing of the survey plan a new pedestrian access from Lot 23 to the existing
pathway network must be constructed at no cost to Council. The works must be
undertaken in accordance with an Operational Works approval. The pedestrian
connection must be located in the north western part of the site and extend to the existing
pathway network in the Eenie Creek Road road reserve to the east of the underpass.
10. Prior to the sealing of the survey plan a new pedestrian connection from the existing
pathway network in Hofmann Drive to proposed Lot 1 must be constructed at no cost to
Council. The works must be undertaken in accordance with an Operational Works
approval. The connection must be located to the south of the existing roundabout at the
intersection of Hofmann Drive with the internal access road for “Noosa Civic” and
connect to the existing internal pathway network within proposed Lot 1.
New Roads
11. The new public road shown on the Approved Plans (extension of Hofmann Drive) must
be constructed in accordance with the conditions of this Decision Notice and dedicated
as road reserve at no cost to Council. The works must be undertaken in accordance with
an Operational Works approval and be generally in accordance with drawings number
1856-R04 revision K, 1856-R05 revision K and 1853-R06 revision J prepared by Barlow
Shelley. The works must include but not be limited to kerb and channel, footpaths, street
lighting, services, linemarking, stormwater drainage and landscaping.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
12. Approval of the proposed subdivisional road layout is subject to final operational works
approval and any associated changes to the subdivision road layout that arise as part
of the operational works approval and any construction changes.
13. The road reserve boundaries between public and private roads must be located to
accommodate all constructed pedestrian routes within the public road reserve around
all sides of the proposed roundabouts.
14. The road reserve boundaries adjacent to the proposed emergency access gates must
be located to ensure that:
14.1. all elements of the emergency access gates are wholly contained within the road
reserve,
14.2. the swing areas (inward opening) of the gates is not impeded by fencing and is
protected by the terms of Easements AY and AQ.
15. Clearly visible signage must be erected at the threshold of the private roads. The
signage must clearly indicate to motorists and pedestrians that they are entering a
private road system.
Private Roads
16. Prior to the sealing of the survey plan, the private road within Lot 3 (Road B adjacent to
Lots 10-16) must be constructed with a centrally located 10m carriageway. The works
must be in accordance with an Operational Works approval and be generally in
accordance with drawing number 1856-R05 revision K prepared by Barlow Shelley. The
works must include but not be limited to kerb and channel, footpaths, street lighting,
services, linemarking, stormwater drainage and landscaping.
Page 98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.