Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

34.        Unless otherwise stipulated by telecommunications legislation at the time of
           construction, the development must be provided with all necessary conduits, pits and
           pipes to accommodate the future connection of optic fibre technology
           telecommunications.
35.        Certification must be submitted to Council from all relevant service providers which
           certifies that the development has met the requirements of this Decision Notice and all
           applicable legislation at the time of construction.
           Easements
36.        The easements for the development must be in accordance with the schedule indicated
           on drawing number 034389.59 sheet 4 of 4 prepared by Bennett and Francis dated 15
           January 2020 except as modified herein:
      a. Lot 1:
               i.     Combine Easement AM & AN with a width of 6m, which will require amendment
                      to Covenant J to accommodate the combined easement.
              ii.     New Easement AF must be created between Lots 2 and 7 to include the area
                      of the adjacent “new road” connecting to Walter Hay Drive, along with
                      secondary access to Lot 24 by way of left in and left out access along the full
                      northern boundary of Lot 24. It is noted that primary access to Lot 24 is by way
                      of the new roundabout.
      b. Lot 3:
               i.     Easement AL – benefit lots 1, 4 and Public Thoroughfare, with a minimum width
                      of 4m
              ii.     Easement AK – benefit lots 1, 6, 7, 8, 9
              iii.    Easement AP – benefit lots 10, 11, 12, 13, 14, 15, 16
      c. Lot 4:
               i.     Easement AO – benefit lots 1, 3, and Public Thoroughfare, with a minimum
                      width of 4m
      d. Lot 11:
               i.     Easement AY – benefit lots 1, 3, Emergency vehicles and Council
      e. Lot 12:
               i.     Easement AX – benefit lots 1, 3, Emergency vehicles and Council
      f.    Lot 13:
               i.     Easement AW – benefit lots 1, 3, Emergency vehicles and Council
      g. Lot 14:
               i.     Easement AV – benefit lots 1, 3, Emergency vehicles and Council
      h. Lot 15:
               i.     Easement AQ – benefit lots 1, 3, Emergency vehicles and Council
37.        The private road easement AK between lots 3 and 7 must have a minimum width of 25m
           and be sufficient to accommodate an ultimate “main street” environment as described in
           Figure 6.4.1.5 – Section A2 – 25m Main Street without median of the New Noosa
           Plan and as shown below:




                                                                                                         Page 102
Log in to download the original file

2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.