2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

38.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.
39.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard easement
      terms. Draft easement documentation must be submitted to Council for endorsement.
40.   All works must be kept clear of any existing or proposed easements on the subject land,
      unless agreed otherwise in writing by the Grantee.
      Earthworks and Retaining Walls
41.   All fill and associated retaining structures/batters must be undertaken in accordance with
      an Operational Works approval and be generally in accordance with drawing numbers
      1856-R04 Revision K, 1856-R05 Revision K, 1856-R06 Revision J and 1856-R07-2
      Revision J prepared by Barlow Shelley. All works must be contained entirely within the
      subject site unless written permission from the respective landowner(s) is provided to
      Council.
42.   All retaining walls must be designed and constructed in accordance with the planning
      scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
      walls that are publicly accessible and exceed 1.0m in height must be fitted with a
      commercial grade safety fence.
      Damage to Services and Assets
43.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      a. where the damage would cause a hazard to pedestrian or vehicle safety,
         immediately; or
      b. where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.




                                                                                                   Page 103
Log in to download the original file

2020-08-31 SM - Item 2 - Attachment 2 - Infrastructure Agreement(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.