RESPONSE TO FURTHER ADVICE - Waste Management Plan

of 12
                                                                                        Waste Management Plan
                                                                               Proposed Workers Accommodation
                                                                                   23 Bottlebrush Avenue, Noosa

3.0 WASTE AND RECYCLING GENERATION
3.1             TYPE OF WASTE

The development is proposed to include workers accommodation only and as such, the
anticipated waste types include general waste and co-mingled recycling material only.
Provisions will be made for each anticipated waste type.

The development will be managed by the body corporate, which will engage a suitably
qualified landscape maintenance contractor to undertake ongoing grounds maintenance. As
part of this contractual arrangement, all green waste generated on-site will be removed by
the contractor. Accordingly, the provision of a Council green waste bin is not required for the
development.

3.2        WASTE VOLUMES

Calculations of the anticipated waste quantities for the development have been undertaken
using industry-standard generation rates, as agreed in the Further Advice notice issued by
Noosa Council on 19 December 2025. The adopted waste and recycling generation rates are
considered appropriate for the proposed use of the premises as workers’ accommodation,
which differs from typical residential dwellings.

Table 1 below displays the anticipated volume of general waste and recycling material that is
expected to be generated during the operational phase of the development.

Table 1: Anticipated general waste and recycling quantities from the proposed units.
                                    Waste        Estimated Waste   Estimated Waste
                    Number
  Waste Type                   Generation Rate      Generation        Generation
                    of rooms
                               (L/occupant/wk)       (L/week)         (m3/week)
      General                        60               960               0.96
                      16
      Recycling                      60               960               0.96


The development is expected to generate approximately 960L per week of general waste and
960L per week of recycling material.

3.3        WASTE MINIMISATION INITIATIVES

To minimise waste to landfill, the following waste minimisation measures will be
implemented at the site:
      •    Provision of clearly labelled recycling bins within the waste storage area;
      •    Educational signage for residents regarding waste separation;
      •    Encouragement of cardboard flattening prior to disposal;
      •    Provision for periodic bulky waste collection through private contractor;
      •    Body corporate oversight of waste contractor engagement.
These measures align with the policy objective of encouraging waste reduction, reuse and
recycling.


RH2601-90                                   Revision A, March 2026                                      Page 4

Log in to download the original (RESPONSE TO FURTHER ADVICE - Waste Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.