Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RESPONSE TO FURTHER ADVICE - Waste Management Plan

of 12
                                                                                          Waste Management Plan
                                                                                 Proposed Workers Accommodation
                                                                                     23 Bottlebrush Avenue, Noosa

4.0 WASTE AND RECYCLING STORAGE

Section 4 outlines the general design criteria of the waste storage and servicing areas as
required by SC6.10 PSP9 Waste Management, Noosa Plan 2020 (September 2020) along with
a description of the proposed bins to be used. Should the proposed development be unable
to meet any of the following requirements, alternative arrangements may be negotiated with
Council at the appropriate time.

4.1             BIN STORAGE AREA
The development is proposed to include a dedicated wheelie bin storage area at ground level
for the storage of all general waste and recycling material (refer to Figure 2). The wheelie bin
storage area will be designed and constructed to meet Council’s design requirements as listed
below. The bin storage area will be:
  1.      Located at ground level with convenient access;
  2.      Adequately screened from public view;
  3.      Well venalated and well lit;
  4.      Include smooth, impervious flooring;
  5.      Include drainage connected to sewer for bin wash-down;
  6.      Include tap and hose connecaon;
  7.      Provide sufficient circulaaon space around each of the bins;
  8.      Avoid obstrucaon of exits or fire egress paths.

4.2             RESPONSIBILITIES
  1.      Residents will be responsible for transporting waste to the common waste storage
          area.
  2.      Site management will ensure bins are presented for collection by Council’s service
          provider. Site management will also be responsible for washing bins and maintaining
          the amenity of the bin storage area.
  3.      Council collection contractor to undertake weekly servicing of the general waste and
          recycling bins.

4.3             PROPOSED WASTE BINS
To ensure that the bin storage area provided for the development is sufficiently sized, details
of the type and quantity of waste and number of bins to be stored are provided in Table 2
below.
Table 2: Details of waste and bins required for the proposed development.
                    Waste
                                                 Servicing
  Waste Type       Quantity   Proposed Bins                                        Comments
                                               frequency*
                   (L/week)

                               2 x 360L         Three per
      General        960                                     The proposed bins provide 2,160L weekly capacity for
                              wheelie bins        week
                                                             both general waste and recycling. This exceeds the
                                                             calculated weekly generation of 960L for each waste
                               2 x 360L         Three per    stream, providing operational buffer capacity.
   Recycling         960
                              wheelie bins        week




RH2601-90                                     Revision A, March 2026                                         Page 5

Log in to download the original (RESPONSE TO FURTHER ADVICE - Waste Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.