Skip to the record
Noosa’s premier civic archive.

Council archive · source document

07/2174 - Response to Information Request [As Published] · 132007.2174

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

-7-
The Rational Method was used to check adopted discharge rates. Parameters
adopted were generally based on recommendations in Australian Rainfall &
Runoff (iEAust 1997), and the Queensland Urban Drainage Manual (1994).

The pre and post development catchments for the development site outlined in
Drawing DE07731/01 in Appendix A. Detailed hydrologic calculations for the
intemal pre and post catchment, listing ail variables adopted, have been included
in Appendix B.

Results indicating the effectiveness of the proposed mitigation methods for the

ARI storms investigated are detailed in Table 3.1 below.

Table 3.1

Model Results

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARI Site Catchment Discharge (m*/sec) Detention
Storm CASE 1 Pre-Development CASE 2 CASE 3 System
Details Post- Post-Dev | Water Depth

Development | with Basin (m)

XP-RAFTS Rational XP-RAFTS | XP-RAFTS
Method

2 year 0.057 0.035 0.084 0.057 0.29
5 year 0.075 0.049 0.080 0.069 0.39
10 year 0.084 0.057 0.089 0.080 0.44
20 year 0.097 0.068 0.101 0.097 0.48
50 year 0.103 0.086 0.108 0.102 0.49
100 year 0.115 0.100 0.120 0.114 0.51

 

 

Site specific intemal catchment mitigation infrastructure used to model discharges
from the site is summarised below. Refer to Drawings DEO7731/02 in Appendix A
for details.

3.2 Mitigation Infrastructure Details

Details of the detention basin used to model discharges from the site is
summarised below.

Adopted Basin parameters are:

e Low level pipe outlet: 0.0m (assumed detention)

e Low level pipe outlet type: RCP

e Low level pipe outlet specification: 1x225mm diameter

e Weir height: 0.4m (above assumed detention)

e Weir width: 0.6m

e Depth over weir (Q1o0): 0.11m

* Total storage volume required: 11.3m?

e Detention depth in basin (Q100): 0.51m (above assumed detention)

Refer to Drawing DE07731/02 in Appendix A for details. Refer Appendix B for
RAFTS output results.

 

AA07731SMP
January 2008
ATs

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2174 - Response to Information Request [As Published].pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.