B Current Decision Notice · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 21

Text shows just the words. Original shows the document exactly as it was published.

                                          Officer:            Jack Lewis
                                          Direct Telephone:   07 53296236
                                          Fax:                07 5329 6501
                                          Our Reference:      JLEWIS:132007.2398.01
                                          Your Reference:     30060
24 June 2014



RSL Care Limited
C/- THG Resource Strategists
PO Box 1038
FORTITUDE VALLEY QLD 4006


Dear Sir/Madam

                             Compiled Decision Notice
                              Sustainable Planning Act 2009

I refer to your request to extend the relevant period of an existing approval. On 24 June 2014,
Council decided your request.

Details of the decision are as follows:
1     APPLICATION DETAILS

Application No:                 132007.2398.01
Street Address:                 4 Lamonts Rd & 19 Trading Post Rd COOROY QLD 4563
Real Property Description:      Lot 1 RP215922, Lot 2 RP165418
Planning Scheme:                The Noosa Plan (16 September 2013)
2     DECISION DETAILS
Council on 8 February 2010 decided to issue the following type of approval:-
     Development Permit for Material Change of Use – Multiple Housing Type 3 - Retirement
      & Special Needs
In relation to representations, Council on 23 June 2010 decided to:
A.    Agree to amend Conditions 2.2, 17, 18, 19, 23, 37 & 49
B.    Amend Condition 33

In relation to the request to extend the relevant period of the existing approval, Council on
24 June 2014 decided to:
A.    Approve a change to Condition 6 extending the relevant period for 2 years to
      23 June 2016.

3     RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval finishes on 23 June 2016.



                                                                                      Page 1 of 21
Full text of the other 20 pages

Page 2

                                                                               132007.2398.01


4    CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
1.   Development, including staging of the development, shall be undertaken in accordance
     with this approval and must generally comply with the approved plans of development.
     The approved plans are titled and numbered: -
     Site Masterplan                          0805-TP03     Revision B     1 November 2008
     Schedule of Independent Living Units     0805-TP04     Revision B     1 November 2008
     Masterplan Staging                       0805-TP05     Revision B     1 November 2008
     Village Community Centre – Plans &       0805-TP06     Revision B     9 March 2009
     Elevations
     Village Community Centre – Roof Plan     -             -              -
     Apartment Building – Floor Plans         0805-TP07     Revision B     1 November 2008
     Apartment Building – Roof Plan           -             -              -
     Apartment Building – Elevations          0805-TP08     -              June 2008
     Aged Care Residence – Floor and Roof     0805-TP09     Revision B     9 March 2009
     Plans


     Aged Care Residence – Elevations         0805-TP10     Revision B     9 March 2009
     External materials & colour palette      0805-TP11     -              June 2008
     Typical Sections                         0805-TP13     -              June 2008
     Standard Aged Care Unit Type Z1-B        -             -              October 2007
     Plan & Elevations - Floor Plan (Hip
     Roof)
     Standard Aged Care Unit Type Z1-B -      -             -              October 2007
     Elevations
     Standard Aged Care Unit Type Z2-B        -             -              30       September
     Reversed Plan & Elevations – Floor                                    2008
     Plan (Hip Roof)
     Standard Aged Care Unit Type Z2-B        -             -              30       September
     Reversed - Elevations (Skillion Roof)                                 2008
     Standard Aged Care Unit Type Z3-B        -             -              October 2007
     Plan & Elevations – Floor Plan (Hip
     Roof)
     Standard Aged Care Unit Type Z3-B –      -             -              October 2007
     Elevations
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed Plan – Floor Plan (Hip                                  2008
     Roof)
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed – Elevations (Gable &                                   2008
     Hip Roof)
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed – Elevations (Hip Roof)                                 2008

     prepared by Smith and Tracey Architects and as may be amended by these conditions.



                                                                               Page 2 of 21

Page 3

                                                                               132007.2398.01

General
2.   Prior to the issue of a Development Permit for Operational Works, amended architectural
     plans shall be submitted demonstrating a revised layout having regard to the conditional
     requirements contained herein:-
     2.1   A mix of independent living units and residential aged care, with a maximum of
           179 independent living units and 120 aged care beds.
     2.2   A maximum of 8 building forms (single or duplex form) and driveway accesses
           shall be provided to Trading Post Road.
     2.3   Truncation at Elm and Pearsons Road for existing powerlines.
3.   Security in the form of a cash bond or trading bank guarantee to the sum of $100,000
     must be submitted, to secure performance of all conditions of this approval, prior to the
     commencement of Stage 1 of the development. The cash bond or trading bank
     guarantee will be returned on performance of the conditions of approval less any costs
     incurred by Council in respect of enforcing performance of this permit.
4.   The requirements of this development approval are to be effected, prior to the use of the
     premises. Council reserves the right to call upon the bond or guaranteed sum referred
     to in this approval to effect compliance with conditions.
5.   The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.
6.   The Development Permit for a material change of use of premises lapses if the use has
     not commenced by 23 June 2016. The uncompleted aspects of this development
     approval lapses if the whole of the approved use has not happened by 23 June 2018.
Staging
7.   The staging of the development shall be in accordance with the plan titled Masterplan
     Staging 0805-TP05 Revision B dated 1 November 2008 prepared by Smith and Tracey
     Architects. The following works shall be undertaken and completed prior to the
     commencement of use of Stage 1:-
     7.1   All access, roadworks and frontage works including footpaths as required by
           conditions of this approval;
     7.2   Bus stop works as required by conditions of this approval;
     7.3   Fencing, including all acoustic fencing as required by the approved Acoustic
           Report; to all site boundaries;
     7.4   Landscaping treatments to open space areas including the establishment and
           rehabilitation of all detention basins, the establishment of landscaping buffers to
           site boundaries and adjoining residential properties and street trees; and
     7.5   Payment of relevant bonds as required by conditions of this approval.
Landscaping
8.   A Landscape Plan shall be prepared by a suitably qualified Landscape Architect or
     Horticulturalist and shall be in accordance with Council’s Landscaping Code of The
     Noosa Plan and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.
     The Landscaping Plan shall be submitted and approved as part of an application for
     Operational Works. The Landscaping Plan shall address landscaping treatments for the
     development including internal streetscapes and open space areas, adjoining road
     network and properties.




                                                                               Page 3 of 21

Page 4

                                                                                  132007.2398.01

The detailed Landscaping Plans shall identify and/or address the following:-
      8.1   Street tree planting to Pearsons Road and Trading Post Road to allow good shade
            canopy once fully mature;
      8.2   Existing vegetation to be removed, with this vegetation clearly identified on site for
            inspection by Council;
      8.3   Existing vegetation to be retained and measures employed to ensure vegetation
            retention;
      8.4   Landscaping treatments to internal road network and between buildings;
      8.5   Landscaping treatments to open space areas, including any rehabilitation and
            planting enhancement requirements around the drainage basins within the site;
      8.6   Landscaping buffers and fencing to Elm Street, Pearsons Road, Trading Post
            Road and Lamonts Road;
      8.7   Landscape buffers and fencing to adjoining properties;
      8.8   The location of pedestrian pathways and seating within the site and on the road
            reserve adjoining the site.
      Such landscaping is to be completed in accordance with the approved landscaping plan
      prior to acceptance of the development on maintenance.
9.    Existing trees on the site and within road reserves are to be retained, except where
      required to be removed due to building operations or the conduct of the approved use.
10.   All underground services, drainage, footpaths, bike paths, roads and other site works
      shall be located to minimise adverse impacts on retained vegetation, particularly their
      root systems.
Public Open Space
11.   Communal recreational facilities shall be located a minimum of 15 metres from
      bedrooms of Independent Living Units and Aged Care Residence.
12.   Seating shall be provided in communal areas and along pedestrian pathways within the
      site.
Acoustics
13.   The site is to be developed in accordance with the recommendations of the Acoustic
      Report as prepared by ASK Consulting Engineers (Project 499IR0IVoI dated 12 March
      2009 and the addendum dated 20 March 2009), which include the use of minimum
      construction methods for buildings and acoustic barriers along site boundaries.
14.   The acoustic report shall be amended, where appropriate, to include additional
      measures required to address potential road noise on habitable rooms and private open
      space areas from haulage vehicles along Lamonts Road.
15.   Where mechanical ventilation systems are to be used for the development, the most
      energy efficient systems shall be installed.
16.   On completion of the development, the developer is required to submit to Council a
      written certification from an Acoustic Consultant confirming that the proposed noise
      barriers meet the noise limits for each adjoining residence as outlined under the Acoustic
      Report for the subject site.
Fencing
17.   Fencing shall be erected on all boundaries of the site and shall have a minimum height
      of 1.5 metres Trading Post Road and Pearsons Road and 1.8 metres on all other
      boundaries with the exception of those fences which are required to have a greater
      height for the purpose of meeting acoustic requirements.

                                                                                   Page 4 of 21

Page 5

                                                                                 132007.2398.01

18.   All fencing to road frontages of the site shall be setback a minimum of 1 metre with an
      average of 2 metres and be screened with landscaping, with the exception of:-
      18.1. Where open or transparent (ie. minimum 50%) fencing is provided to Pearsons,
            Trading Post and Lamonts Road, fencing may be incorporated within a minimum 2
            metre wide landscape area and/or
      18.2 Where fencing to Trading Post Road is provided in alignment with the front
           building facades of the independent living units, a minimum 2 metre wide
           landscape area is to be provided within the front building setback.
Building Setbacks
19.   All buildings shall be setback a minimum of 6 metres to Elm Street, Pearsons Road and
      Lamonts Road. A minimum setback of 4.5 metres applies to Trading Post Road,
      providing garages are setback a minimum of 5.5 metres.
20.   All buildings shall be setback a minimum distance that is equivalent to half their building
      height to adjoining properties, excluding to Lot 1 on RP 165418 where a minimum
      setback of 2 metres is required.
21.   The distance between any part of any building shall be a minimum of 1.5 metres plus 0.5
      metres for each storey of the building with the greatest number of storeys.
Built Form
22.   Buildings shall be varied in their architectural style, construction materials, colours and
      finishes with no more than four (4) adjoining or consecutive independent living units
      having the same external colours, materials or finishes.
23.   All buildings shall comprise eave overhangs of a minimum 600mm to 75% of the
      buildings, with the exception of approved design types Z1-B, Z2-B and Z3-B (including
      reversed designs), where no or limited eave overhangs are permitted to one side of the
      building.
24.   Transformers, waste storage areas, etc shall be screened to reduce their visual
      intrusiveness.
Aged Care Residence
25.   A maximum of 82 employees at anyone time are permitted to be engaged in the
      operation of the aged care residence.
26.   Employees and visitors of the aged care residence shall be encouraged to utilise the
      site’s vehicular access from Lamonts Road.
Lot Amalgamation and Road Dedication
27.   All separate, adjoining lots that form part of this application shall be amalgamated into
      one undivided allotment in accordance with Section 3.7.3 of the Integrated Planning Act
      and the Plan of Survey submitted for registration at the Land Titles Office. The Plan of
      Survey must also include any land dedication required by this permit. Proof of title being
      issued for the amalgamated lot shall be submitted to Council prior to the issue of the
      Development Permit for Operational Works.
28.   Prior to commencement of use the applicant shall dedicate road reserve truncation at the
      intersection of Pearsons Road with Elm Street to ensure that the existing power lines
      crossing this corner of the site be located within the road reserve. The new boundary
      line setback from the power line shall be in accordance with ENERGEX’s requirements
      and adequate to accommodate any proposed or future pathway at this corner of the site.




                                                                                  Page 5 of 21

Page 6

                                                                                   132007.2398.01

Vehicle Access, Roadworks and Frontage Works
29.   All pathways and roadworks required by this approval including the works required by
      Department of Main Roads (DMR) on Cooroy Connection Road (Elm Street) at its
      intersections with Pearsons Road and Lamonts Road, and the roadworks required by
      Council on Trading Post Road, Pearsons Road and Lamonts Road must be included in
      Stage 1 of the development with the exception of roadworks relating to the site’s access
      from Lamonts Road which must be carried out as part of the development of the aged
      care residence (whether or not staged) or the commencement of works for the
      development of Stages 8 or 9, whichever comes first .
30.   The applicant must design and construct kerb and channel along the western side of
      Pearsons Road with any associated road widening and drainage works to achieve Local
      Road standard for Urban area (8m Kerb to Kerb) in accordance with Council’s Planning
      Scheme Policy 5 - Engineering Design Standards – Roads, Drainage and Earthworks.
      The existing kerb line at the intersection of Pearsons Road and Elm Street must also be
      upgraded in accordance with Department of Main Roads Standard to match the
      proposed new width and new kerb line of Pearsons Road or as may be specified by
      Department of Main Roads in the operational works approval. A Development Permit for
      Operational Works shall be required.
31.   The applicant must construct a cul-de-sac head at the end of Trading Post Road in
      accordance with Section 3.12 of Council’s Planning Scheme Policy 5 - Engineering
      Design Standards – Roads, Drainage and Earthworks. A Development Permit for
      Operational Works shall be required.
32.   The applicant must design, construct and seal Lamonts Road from Elm Street to 10m
      beyond the access to the development site in accordance with Council’s Planning
      Scheme Policy 5 - Engineering Design Standards – Roads, Drainage and Earthworks
      with 7m wide seal and flush kerb be provided on both sides of the seal. The intersection
      of Lamonts Road with Elm Street must be designed in accordance with Department of
      Main Roads Standard or as may be specified by Department of Main Roads in the
      operational works approval for this intersection. Accesses to other properties shall be
      adjusted as necessary to match the new levels of Lamonts Raod. A Development
      Permit for Operational Works shall be required.
33.   The site shall have only three main (3) vehicular accesses to Council’s roads network
      including a gated emergency vehicles access from Pearsons Road. There shall be no
      other vehicular accesses from the site or from any unit within the site directly to Council’s
      roads (excluding 6 driveway crossovers to Trading Post Road).
34.   The access crossings shall be designed and constructed to Council’s design standards
      and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing
      pedestrians movements along the footpath without any step or level difference. All
      access driveways must comply with AS/NZS 2890.1:2004 and AS 2890.2:2002. A
      Development Permit for Operational Works shall be required.
35.   Footpath improvements such as topsoiling, grassing, and tree planting are required to
      the all road frontages of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
36.   A new 2m wide concrete path shall be constructed along the Trading Post Road frontage
      of the site in accordance with Council’s design standards and to an alignment that
      protects any significant vegetation and underground services. The path shall extend
      around the cul-de-sac and join to the existing path on the opposite side of Trading Post
      Road. A Development Permit for Operational Works shall be required.




                                                                                    Page 6 of 21

Page 7

                                                                                132007.2398.01

37.   A new 2m wide concrete path shall be constructed along the Pearsons Road frontage of
      the site and be extended along Elm Street to connect to the required bus stop on Elm
      Street. The path shall be in accordance with Council’s design standards and to an
      alignment that protects any significant vegetation and underground services. Two
      pedestrian accesses to the site shall be provided along Pearsons Road frontage to
      provide connection between the internal and external pathways. A development Permit
      for Operational Works shall be required.
38.   A pedestrian refuge island shall be constructed on Pearsons Road near its intersection
      with Elm Street to provide connection between the new pathway in Pearsons Road and
      the pathway in Elm Street.
39.   Pram ramps shall be installed at road intersections and wherever needed to direct
      pedestrians across the road. All pram ramps must be constructed in accordance with
      Council’s design standards.
40.   All paths, pram ramps, driveways and parking areas shall be designed and constructed
      to ensure pedestrian safety using non-slip materials, to produce an evenly graded
      surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
      Australian Standard 1428.1 Design for Access & Mobility.
41.   Where applicable, all redundant vehicular crossings to the site shall be removed and
      replaced by kerb and channel and footpath paving or landscaping in accordance with
      Council’s Standard prior to the commencement of the use.
42.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
      footpath, the driveway and any associated fencing or vegetation near the driveway shall
      comply with the minimum sight line requirements as defined in AS/NZS 2890.1:2004,
      section 3.2.4.
Bus Stop
43.   The applicant shall design and construct a bus stop on Elm Street to the frontage of Lot
      135 MCH 978 (north of 156 Elm Street) at approximately 70m south of the centre line of
      Pearson Road intersection. A Development Permit for Operational Works shall be
      required.
44.   The proposed bus stop is to be “Indented” and be an “Intermediate Bus Stop” design
      according to the TransLink Public Transport Infrastructure Manual shown on:
      http://www.transinfo.qld.gov.au/qt/TransLin.nsf/index/ptim. The bus stop shall contain all
      Mandatory and Preferred components as stated in Chapter 2 of the manual.
45.   The design for the bus stop shall consider a Pedesrian Refuge Island and a coupled bus
      stop (indented but unsheltered) on the opposite side of Elm Street for future
      construction.
46.   The bus stop required on Elm Street must be included in Stage 1 of the development.
Internal Driveways and Parking
47.   The internal roads shall be concrete or bitumen sealed driveway of a minimum width of
      6m for Primary Roads and 5.5m for Secondary roads and must comply with AS 2890.2-
      2002. A Development Permit for Operational Works shall be required.
48.   All parking areas and garages must be in compliance with the requirement of the current
      Australian standards applicable to their use (AS/NZS 2890.1-2004 and/or AS 2890.2-
      2002) with a minimum head clearance (headroom) at any point of 2.3m.
49.   All vehicles shall enter and leave the site in a forward direction with the exception of
      vehicles leaving driveway accesses of the duplex from independent living units fronting
      Trading Post Road.




                                                                                 Page 7 of 21

Page 8

                                                                                      132007.2398.01

50.   Carparking shall be provided within the site generally as shown on drawing titled
      Schedule of Independent Living Units 0805-TP04 Revision B 1 November 2008, except
      as modified herein.
51.   Carparking shall be provided at a minimum rate of 1 space per independent living unit for
      resident parking and 1 space per 4 independent living units for visitor parking; and 1
      space per 2 employees based on the maximum number of employees engaged at any
      one time at the aged care residence and 1 space per 5 beds or occupants of the aged
      care residence.
52.   A minimum of two clearly defined disabled car space shall be provided to service the
      aged care residence and village community centre.
53.   All staff carpark spaces shall be clearly defined by line marking each space with the
      words “Staff Parking Only” and by sign posting each space with a similar wording.
54.   All carparking shall be kept maintained and line-marked in a condition fit for use.
55.   An emergency parking bay shall be available at all times in front of the community village
      centre and the aged care residence.
56.   Parking shall be provided for boats, trailers and caravans etc.
57.   Visitor car parking shall be conveniently located to all independent living units, village
      community centre and the aged care residence.
Earthworks
58.   All excavation and filling works required on site must be carried out in accordance with
      Council’s Planning Scheme Policy PSP5 – Engineering Design Standards.                  A
      Development Permit for Operational Works shall be required.
59.   Fill imported to the site may only be from a site licensed with The Environmental
      Protection Agency or from a site for which a Development Permit for Operational Works
      has been issued approving the export of fill.
60.   A registered practicing Geotechnical Engineer shall test the existing ground conditions
      for suitability of placing additional fill, prior to such fill being placed.
      Filling works shall be restricted to the subject site itself, and the finished fill levels are to
      taper to the existing levels on the property. Batters shall be at a maximum grade of 1:4
      unless retained by an engineer-designed wall or approved retention method.
61.   Following completion of the filling works and prior to endorsement of the Plan of Survey,
      the registered practicing Geotechnical Engineer supervising the works shall submit
      compaction tests across the entire filled areas and make recommendations if special
      foundations requirements will apply.
62.   Earthworks carried out on site must not adversely affect the drainage conditions on any
      other properties or existing roads. Filling works required on site shall not cause
      additional ponding of water on any adjoining lands or the blockage of, or interference
      with, any natural watercourses. Detailed site surveys indicating natural surface levels
      and contours of the affected properties (eg Lot1 RP165418) must be provided with the
      application for a Development Permit for Operational Works for Filling and Drainage.
      This may require the design and construction of drainage pipes and/or an overland flow-
      path within the development site that caters for drainage from the adjoining sites for a
      design storm with an Average Recurrence Interval of 1 in 100 years.
Vegetation Protection & Preservation
63.   Vehicular pavements within the drip zone of any of the existing trees on site to be
      retained shall be designed as a pervious pavement (such as grass paving cells or
      similar), as this will allow water that falls on this surface to penetrate to the trees root
      system. The pavement shall be constructed so as not to damage the tree or their root

                                                                                       Page 8 of 21

Page 9

                                                                                    132007.2398.01

      system and in this regard temporary fencing shall be provided around the trees during
      construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and
      extent of the pervious pavement and the temporary fencing prior to obtaining a
      Development Permit for Operational Works.
64.   Where retained trees are located in areas proposed to filled on site (or are located on
      neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
      material from being placed on the trees root system. To this end the design of the filling
      works will need to incorporate terracing around the tree or a similar means of ensuring
      that the natural ground level around the trees remains generally the same as existing.
      These measures shall clearly be shown on the plans submitted for Operational Works
      approval and any drainage required to drain these areas shall also be shown on the
      plans.
Stormwater Drainage
65.   A suitably qualified Registered Professional Engineer, specialising in hydraulics shall
      prepare engineering drawings and specifications for stormwater designs and shall be
      submitted in conjunction with an application for a Development Permit for Operational
      Works.
66.   Peak discharges of stormwater shall be managed in accordance with the Concept
      Stormwater Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy
      prepared by Brown Consulting dated June 2008 and any subsequent amendments
      approved by Council.
67.   Stormwater pipelines within the site shall cater for 1 in 10 Years storm event and
      secondary flowpaths shall be provided within the site to cater for 100 years storm event.
68.   The development must not adversely impact on the existing drainage conditions on other
      properties including not depriving dams on other properties of their natural stormwater
      runoff.
69.   The applicant shall revise the Concept Stormwater Management Plan for Cooroy
      Retirement Village Trading Post Road, Cooroy prepared by Brown Consulting dated
      June 2008 to detail a stormwater treatment train that can achieve Load Reduction
      Targets for Total Suspended Solids, Total Phosphorous and Total Nitrogen in
      accordance with the Healthy Waterways Water Sensitive Urban Design – Technical
      Guidelines for South East Queensland (2006). This revised stormwater treatment train
      for the site shall ensure that nutrients can be adequately treated prior to release off site.
      The revised Concept Stormwater Management Plan shall specify water quality
      objectives for stormwater prior to it leaving the site to ensure the modelled outcomes are
      achieved. All stormwater runoff treatment must be undertaken within the development
      areas of the site.
      The applicant shall submit an amended plan for Council approval prior to a Development
      Permit for Operational Works being issued.
70.   Stormwater Quality Improvement Devices as detailed within the Concept Stormwater
      Management Plan for Cooroy Retirement Village Trading Post Road, Cooroy prepared
      by Brown Consulting dated June 2008 and any updates approved by Council shall be
      installed within the development to ensure compliance with the designated water quality
      objectives are achieved. Stormwater likely to contain grease and oil (i.e. from carparking
      areas) shall be managed via grease and oil arrestors prior to treatment within
      bioretention basins and wetlands.
71.   Wetlands and bioretention basins shall be designed and constructed in accordance with
      Healthy Waterways Water by Design Construction and Establishment Guidelines:
      Swales, Bioretention Systems and Wetlands February 2009.


                                                                                    Page 9 of 21

Page 10

                                                                                      132007.2398.01

72.   A Stormwater Monitoring and Maintenance Plan (SMMP) shall be prepared ensure
      stormwater treatment infrastructure is performing its intended purpose. The SMMP shall
      be approved by the Council’s CEO or delegated officer prior to issue of any Operational
      Works Approval. The SMMP shall specify:
      72.1    performance indicators including water quality objectives;
      72.2    monitoring schedule to ensure specified performance indicators are achieved;
      72.3    maintenance schedule for all elements of the stormwater treatment train;
      72.4    reporting requirements;
      72.5    corrective actions for non compliance with performance indicators; and
      72.6    responsibility framework.
Sewer Mains
73.   The site must be connected to Council's existing sewerage reticulation system by gravity,
      and be constructed in accordance with Council's standards and requirements at no cost to
      Council.
74.   The sewer connection shall be generally in accordance with the Sewerage Layout Plan
      Drawing No N07058-DA10 Issue E dated 22/01/09 and the Proposed Sewer Details
      N07058-DA20 Issue (A) dated 22/01/2009 by Brown Consulting. A Development Permit
      for Operational Works is required.
75.   A new sewer connection must be provided within the property boundary of Lot 4 RP
      215922.
76.   The applicant must provide written approval from all property owners through which
      external sewers will traverse, to enter, construct and provide a sewer easement. This must
      be submitted prior to the associated development application for Operational Works.
Water Supply
77.   The site must be connected to Council's existing town water supply and be constructed in
      accordance with Council's standards and requirements at no cost to Council.
78.   Works be carried out in accordance with the approved findings of the water supply
      network analysis by Worley Parsons and dated 10 June 2008
79.   The existing 100mm diameter watermain within Pearson Road must be upgraded
      between the existing 150mm diameter main in Carruthers Court to the existing 150mm
      diameter main to the North in Pearsons Road
80.   The water connection to the water reticulation system shall extend to the property boundary
      and be metered. All fees for the supply of water meters shall be paid to the Council
81.   For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the
      development shall be served by:
      81.1 Single Body Corporate water meter to measure the total water consumption
             (including fire hose reels, but excluding fire hydrants and fire sprinkler systems)
      81.2 Individual water meters to each tenement capable of being separately rated. These
           meters must be supplied and installed in accordance with Councils requirements
      81.3 All water meters must be located in an easily assessable location to facilitate
           unhindered reading by Council and/or Council’s contracted water meter readers,
           and not behind fences or locked gates
      81.4 A fire service (fully testable single detector check with metered bypass), where
           applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
           reels)


                                                                                      Page 10 of 21

Page 11

                                                                                  132007.2398.01

82.   Fire hydrants are to be provided throughout the development in accordance with Council
      Engineering Design Standards and in accordance with Queensland Fire Service
      Standards.
Service Easements
83.   A registered easement shall be created over the zone of influence of the proposed sewer
      mains within the subject site and on the adjoining property Lot 4 RP 215622. The
      easements shall generally be parallel to and centred over the sewer main and be
      equivalent in width to twice the depth to invert level of the sewer at the deepest point
      (measured from the finished surface) and be no less than 3.0m wide overall. In this
      regard a licensed surveyor shall accurately locate all sewer mains and determine the
      necessary width of the easement, which shall be shown on any plans submitted for
      Operational Works / Building Works approval. To this extent the surveyor shall certify
      that the sewer and the zone of influence is wholly contained within the easement to be
      created. The applicant must be pay all costs associated with the acquisition and the
      registration of easement/s.
84.   The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
      writing that the Title Deed and the easement documents will be lodged at the Land Titles
      Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.
      A duly executed copy of the easement shall be submitted to Council for perusal prior to
      the use commencing.
Power Supply
85.   An underground electricity service shall be provided to the site if not already provided.
      In this regard, an approved ENERGEX Electrical Design Consultant shall work in
      conjunction with Council’s Manager - Works Support to prepare detailed designs of the
      electrical proposal.
      The detailed deigns shall then be submitted to ENERGEX for approval and a copy of
      their approval submitted to Council in conjunction with a “Certificate of Electricity Supply
      for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design
      Consultant) prior to Council endorsing the Plan of Survey.
      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant
      shall be wholly at the applicant’s expense and shall not entail a financial encumbrance
      on future purchasers of the proposed lots.
86.   The requirements of ENERGEX shall be satisfied in relation to any existing services
      traverse the site. Written confirmation by ENERGEX that satisfactory arrangements have
      been made to formalise any required easements and/or existing informal services shall
      be submitted prior to Council endorsing the Plan of Survey.
87.   Streets lighting and pathways lighting throughout the development site must be provided
      in accordance with Australian Standards.
88.   Street lighting shall be provided along Pearsons Road frontage of the site in accordance
      with Australian standards.
Telecommunication
89.   The requirements for TELECOMMUNICATION services shall be satisfied in relation to
      the provision of new telephone services to the developed site. In this regard written
      confirmation from an approved telecommunication agency shall be submitted to the
      Council prior to Council endorsing the Plan of Survey.




                                                                                  Page 11 of 21

Page 12

                                                                                                        132007.2398.01

          Erosion and Sediment Control
        90.     Any person acting on this permit shall prevent erosion and sediment export from leaving
                the site. Site control measures such as silt fencing, controlled gravel access to the site
                and controlled disposal of waste, will be necessary.
                In this regard plans detailing the methods of controlling erosion and sediment are
                required to be submitted to the Council for approval prior to obtaining a Development
                Permit for Operational Works.
          Contributions Towards Council Infrastructure
        91.     Monetary contributions shall be paid to Sunshine Coast Regional Council towards the
                cost of providing and/or upgrading various infrastructure at the rates applicable at the
                time of payment. An estimate only of the contribution amounts under the current Council
                policies and requirements is outlined in the table below:
                                                                                                  Rebate       for
                                                                                    Total         Eligible
              INFRASTRUCTURE NETWORK
                                                                                    Contributio   Community
                                                                                                  Organisation          Total
                                                                                    n                                  Amount
Stage         PSP    12   PSP      16   PSP     17    PSP     20    Rural / Local   Applicable    Charitable non-      Payable
              Public      Rural         Water         Pathway       Roadworks       to            profit      for
                                                                                    Developme                             $
              Open        Sewerage      Headworks     Trunk                                       community
              Space       Headworks                   Network                       nt            services
              (Park)                                                                              facilities
Stage 1        $105,504      $202,017      $197,531       $49,374        $17,848      $572,274         100%              $0
Stage 2         $22,936       $65,655       $59,003       $10,495         $7,349      $165,438         100%              $0
Stage 3         $31,673       $90,667       $81,480       $14,492        $10,149      $228,461         100%              $0
Stage 4         $14,198       $40,644       $36,525        $6,497         $4,549      $102,413         100%              $0
Stage 5         $22,936       $65,655       $59,003       $10,495         $7,349      $165,438         100%              $0
Stage 6         $26,212       $75,035       $67,432       $11,994         $8,399      $189,072         100%              $0
Stage 7         $19,659       $56,276       $50,574        $8,995         $6,299      $141,803         100%              $0
Stage 8         $21,844       $62,529       $56,193        $9,995         $6,999      $157,560         100%              $0
Stage 9         $13,106       $37,517       $33,716        $5,997         $4,200        $94,536        100%              $0
Total =        $278,068      $695,995      $641,457      $128,334        $73,141     $1,816,995        100%              $0


                Please note that these amounts are all subject to variations in the Consumer Price
                Index, All Groups Brisbane from December 2009 until the date of payment. All
                contributions must be paid prior to commencement of use.
          General
        92.     A suitably qualified Registered Professional Engineer shall prepare engineering
                drawings and specifications for all engineering works that will become Council
                infrastructure, which shall be submitted in conjunction with an application for a
                Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
                zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
                application for Operational Works.
        93.     Digital detailed designs including drawings, calculations, specifications and a schedule of
                works, shall be submitted with any application for a Development Permit for Operational
                Works in respect of roadworks and stormwater drainage works. The design shall be in
                accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
                Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes
                or services, all existing and proposed services required by the development shall be
                shown on the plans.
        94.     To facilitate production of As Constructed drawings it is suggested that all design
                drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
                (Guidelines on the use of ADAC are available at www.adac.com.au).


                                                                                                       Page 12 of 21

Page 13

                                                                                  132007.2398.01

95.   A construction management plan/strategy shall be prepared by a suitably qualified
      Registered Professional Engineer and submitted to Council in conjunction with any
      application for Operational Works. The construction management plan shall ensure no
      damage occurs to Council services and that any adverse impact on the local area due to
      the construction works is within the acceptable limit and properly managed to the
      satisfaction of Council.
96.   A Traffic Management Plan for the each separate demolition and construction phase of
      the development shall be submitted to and approved by Council at least 5 working days
      prior to the commencement of any Demolition or Building works or at least 5 working
      days prior to the pre-start meeting for Operational Works. The Traffic Management Plan
      shall include but not be limited to:
      96.1 Mitigate any adverse impact and disturbance on the local residential area and on
           the traffic in the local and main roads to acceptable limits;
      96.2 Mitigate dust disturbance caused by vehicles and machinery movements;
      96.3 Limiting the routes for the heavy vehicles to the major road network and limit the
           use of the local roads within residential area as access to the site;
      96.4 Indicate provision for on-site and off-site parking for the required workforce;
      96.5 Indicate the location of loading and unloading areas;
      96.6 Indicate the location of any “holding” areas for heavy vehicles and
      96.7 Operating hours.
      It is be noted that the Elm Street frontage of site shall not be used for access, parking or
      loading and unloading during construction (and post construction) phase unless a
      specific written permit obtained from the Department of Main Roads.
97.   Any damage caused to any public utility during the course of construction shall be
      repaired to Council’s standards and at no cost to Council.
98.   Any alteration of any public utility or other facilities necessitated by the development of
      the land or associated construction works external to the site shall be at no cost to
      Council.
99.   The transportation of all materials to and from the site shall be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site shall be covered to prevent materials including dust being
      windblown from the vehicle.
100. As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted to
     Council for checking and for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to
      roadworks, pathway, sewer main, water supply main, finished ground levels and
      pavement surface levels and drainage structures that will become Council asset. The
      data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been
      supplied and accepted by Council.
Waste Management
101. A Waste Management Plan (Operational) generally in accordance with Planning Scheme
     Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
     Premises”, must be submitted for the day-to-day operation of the development and
     approved by Council’s Health Section prior to issue of development permit for

                                                                                  Page 13 of 21

Page 14

                                                                                132007.2398.01

     operational works. The Waste Management Plan (Operational) is to incorporate the
     following changes to the proposed development:-
     101.1 The proposed general waste bulk bin storage areas at the Aged Care Residence,
           Apartment Building, Village Community Centre and temporary service to the
           Independent Living Units whilst under construction, will require HRV 12.5m length
           travel path and turning access.
     101.2 If the waste storage area at the Aged Care Residence is not roofed, then the
           actual bunded bin wash area is to be decreased in size to a maximum one square
           metre area.
     101.3 The waste storage area at the Apartment Building is to be relocated to the western
           end of the adjoining car parking spaces, to allow ease of access for collection and
           avoid the unnecessary manoeuvring through this car park.
     101.4 The waste storage areas at the Aged Care Residence, Apartment Building, Village
           Community Centre and temporary service to the Independent Living Units whilst
           under construction, each require their own separate bin wash facility.
     101.5 Submit details for approval of the proposal for bin washing of the recycling bins
           located at the service nodals.
     101.6 Council will not provide a roadside collection service to the 80L and/or 120L
           general waste wheelie bins at the Independent Living Units after their completion.
           The following options must be considered including client costings, and an
           alternative proposed for approval.
           101.6.1 Option 1: Continue the temporary service of the bulk bins as a
                   permanent arrangement. This requires:
                        Details of the permanent waste storage area (location, size, bin wash,
                         etc).
                        HRV 12.5m length travel path and turning access for collection.
                    OR
                    Option 2: Provide a roadside collection service of 240L general waste
                    wheelie bins (one bin shared between two units). This requires:
                        10m vehicle length (not 9m as proposed) travel path and turning
                         access for collection.
                        Where possible bins are to be placed on one side of the road only to
                         prevent duplication of travel path and minimise service time and
                         travel.
                        The “Turning Path 3” at the north western corner cul-de-sac to be
                         deleted. The bins for these nine units are to be placed at the nearest
                         trafficable thoroughfare for collection without any unnecessary
                         reversing or turning.
102. Provide an adequate number of recycling bins (240L or 1.1 cu.m. bulk) at the waste
     storage areas of the Aged Care Residence, Apartment Building, Village Community
     Centre and temporary service to the Independent Living Units whilst under construction.
     The proposed HRV 12.5m length travel path and turning access to these areas will
     suffice for collection.
103. The 240L recycling wheelie bin service to the completed Independent Living Units
     requires:
     103.1 Size of the service nodals to increase to accommodate eight bins i.e. one bin
           shared between two units.


                                                                               Page 14 of 21

Page 15

                                                                                        132007.2398.01

     103.2 10m vehicle length (not 9m as proposed) travel path and turning access.
     103.3 Bulk bins (1.1 cu.m.) may also be considered provided HRV 12.5m length access
           is available.
104. Plans are to be submitted for approval by Council’s Environmental Health Section of the
     HRV 12.5m and 10m length waste vehicle travel paths and turning access. Plans must
     clearly show routes and ensure that vehicle overhangs when turning are clear of all
     obstructions e.g. posts, poles, fences, landscaping, etc.
105. All road traffic islands are to be trafficable for the waste vehicles.
106. All bins are to be placed in the correct position for collection at the roadside without the
     need of the driver leaving the waste collection vehicle.
107. Council’s waste collection service during Stage 1 will not commence until the required
     road access and waste storage facilities (including temporary ones), are in place.
108. A Waste Management Plan (construction and demolition) shall be submitted prior to
     demolition, removal or relocation of any building other than a shed. Waste Management
     Plan (construction and demolition) is also required for construction of 15 or more
     dwelling units or for any business use of greater than 500m².
     Waste Management Plans (construction and demolition) are required to be submitted in
     accordance with Planning Scheme Policy 11, Waste Management Plans see table
     below. Waste storage areas are to provide for adequate separation of all reusable,
     recyclable and waste materials. These shall be located so that they are convenient and
     safe to use. The Plan shall contain the following information:
           The site area for the storage and separation of waste is to be shown on the plan
            drawings accompanying the application.
           A waste management table as indicated below is to be completed showing how
            waste material is to be segregated - recycled – reused or disposed.
    MATERIALS ON-SITE                       DESTINATION
                                            Re-use and Recycling                      Disposal
    Expected waste              Estimated   On-site            Off-site               *specify
    materials                   volume      *specify proposed *specify                contractor    and
                                (m³)        re-use or on-site contractor      and     landfill site or
                                            recycling          recycling outlet       other     disposal
                                            methods                                   site
    Excavation material
    Green waste
    Bricks
    Concrete
    Timber-please specify
    Plasterboard
    Metals - please specify
    Asbestos
    Other - please specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to be
      completed by the demolition contractor.

      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free. Higher
      gate fees are charged for loads of mixed waste.




                                                                                       Page 15 of 21

Page 16

                                                                                  132007.2398.01

Mosquito Protection
109. Submit a Management Plan for the control of mosquitos from the three large water
     basins, including form of construction of basins, vegetation in and along the shoreline,
     on-going monitoring and eradication treatments. Plan is to be approved by Council’s
     Environmental Health Section.
110. Doors and windows of the Aged Care Residence, Apartments, Community Centre and
     Independent Living Units are to be fitted with insect screens.
Noise Management
111. The location and operational hours of mechanical plant equipment including domestic air
     conditioning units, is not to create a noise nuisance to occupiers.
112. Noise from building works associated with residential development shall comply with the
     following –
     112.1 Limited to between 7:00am to 6:30pm Monday to Saturday.
     112.2 All reasonable measures are taken to minimise noise emissions.
     112.3 Not permitted on Sunday or public holidays.
113. All water taps from the onsite rainwater storage system are to be labelled “Not fit for
     drinking”.

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger         Referral Status    Referral Agency           Referral Address
 100 metres of a State-   Concurrence        Department of Main        PO Box 1983
 Controlled Road                             Roads                     GYMPIE QLD 4570
 Railway Corridor         Concurrence        Queensland Transport      Transport Planning
                                                                       GPO Box 213
                                                                       BRISBANE QLD 4001

A copy of any referral agency conditions was attached to the original approval.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in Item 4
Consolidated Assessment Manager Conditions, Condition 1.




                                                                                  Page 16 of 21

Page 17

                                                                                             132007.2398.01


7    ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1    The applicant is advised that development contributions and infrastructure charges
     applicable to this development approval have been based on the following Uses Class/
     Uses and applicable quantities:-
         Existing Development                   Approved Development
         Existing Use Class /   Existing        Approved Use
                                                                     Approved Quantity
         Use                    Quantity        Class / Use
                                                                     Stage 1 = 120 single beds + 21x 2 bed
                                                                     units
                                                                     Stage 2 = 21x 2 bed units
                                                                     Stage 3 = 29 x 2 bed units
                                1 Lot & house   Multiple Housing -   Stage 4 = 13 x 2 bed units
                                                Type 3 -
         Detached House         +
                                                Retirement &         Stage 5 = 21 x 2 bed units
                                1 Vacant Lot    Special Needs
                                                                     Stage 6 = 24 x 2 bed units
                                                                     Stage 7 = 18 x 2 bed units
                                                                     Stage 8 = 20 x 2 bed units
                                                                     Stage 9 = 12 x 2 bed units

2.   The applicant is informed that payment via credit card transaction will not be an
     acceptable method of payment for development contributions conditioned in this permit
     or for infrastructure charge notices issued separately.
3.   The requirement for payment of infrastructure contributions has been assessed in
     accordance with Council’s policy “Infrastructure Contributions (Charges) Rebates for
     Eligible Community Organisations”. This approval is based on the organisation type and
     purpose of development in accordance with Table 1 of the policy as detailed in the
     contribution condition of the Development Permit.
4.   The applicant is advised that a Compliance Permit for all plumbing and drainage works
     within the boundaries of the development site shall be obtained from Council’s Plumbing
     Services Section prior to obtaining a Development Permit for Building Works.
5.   A separate loop of water main should be installed within the property boundary for domestic
     and fire services. Fire hydrants and fire sprinklers are should be connected to the fire main.
     Fire hose reels and the domestic supply to be connected to the metered domestic service.
6.   The applicant is advised that this development may require the provision of fire hydrants
     and a booster pump in accordance with the Building Code of Australia, and in
     consultation with Queensland Fire Services to ensure suitable fire fighting infrastructure
     is provided. To this end any necessary fire hydrants shall be clearly shown on the plans
     submitted for both Operational Works and Building Works approvals and if a booster
     pump is deemed necessary, the plans shall indicate where the fire truck is to be
     accommodated in order to provide boosting to the water supply.
7.   A Waste Management Plan shall be in accordance with Planning Scheme Policy No. 9
     and further, shall include the following information: -
             The types of waste that will be generated from the activities approved within the
              development.
             Estimated volumes or tonnage of both recyclables and waste generated.
             Methods to be used for dealing with garden waste.

                                                                                             Page 17 of 21

Page 18

                                                                                132007.2398.01

           Initiatives to minimize waste either by waste prevention, reduction, re-use or
            recycling.
           Description of procedures for getting all waste to the bins; the storage of bins and
            the collection of bins by the contractor.
           A description of the design details of waste storage and recycling areas including
            size, location, elevation and floor plan, methods of bin washing and system to
            prevent storm water getting into sewer via the bin wash.
           A description of types and volume of waste storage containers to be used.
           The waste and recycling storage area shall include the provision of containers for
            all waste and recycling materials including putresable matter, non-recycling waste,
            paper/ cardboard, glass, aluminium/steel cans, waste oil, styro-foam boxes, etc,
            and bin washing facilities connected to sewer.
           A detailed description of vehicular access to collect waste. Where collection is off
            street, access must allow vehicles to enter and leave the site in a forward
            direction.
8.    The food operations at the Aged Care Facility and the Community Centre require:-
      8.1   Plans and application is to be made to Council’s Environmental Health Section for
            approval prior to any building approval, fitting out or use of the premises.
      8.2   A statement indicating the purpose of the food premises, type of food sold,
            proposed menu and maximum number of patrons at any time, is to accompany the
            application for plan approval.
      8.3   Construction and use of the food premises should comply with Council’s Food
            Premises Policy and the Food Safety Standards (both available from Council).
      8.4   Toilets for customers and staff to be provided in accordance with Building Code of
            Australia. Obtain advice from a building certifier on numbers and standards,
            including disable access.
      8.5   Plans and approval is required for any mechanical exhaust ventilation system,
            which should comply with AS1668. A certificate from the installer certifying the
            system complies with the Standard must be obtained and lodged with Council prior
            to commencement of trade.
      8.6   Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006,
            must obtain a Food Licence from Council, prior to use of those premises.
9.    The development should be undertaken and operated in a manner that causes no
      detrimental effect upon the amenity of the neighbourhood by reason of the creation of
      excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
      odours) nuisance or any other emissions in accordance with the nuisance provisions of
      the Environmental Protection Regulation 1998 or Council’s Local Law No. 12 – Control
      of Nuisances.
10.   In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
      paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be
      placed where it could reasonably be expected to move into a roadside gutter, storm
      water drain or a watercourse. On the spot fines apply for such offences.
11.   The plans for the proposed building work have not been assessed for compliance with
      the requirements of the Building Code of Australia as they relate to people with
      disabilities. Your attention is drawn to the matter that either or both the Disability
      Discrimination Act 1992 (Commonwealth) and the Anti-Discrimination Act 1991
      (Queensland) may impact on the proposed building work.
12.   Sunshine Coast Regional Council recommends that the following matters be considered
      to address equitable access and facilities in the building:-

                                                                                Page 18 of 21

Page 19

                                                                                    132007.2398.01

     12.1 The building and environs should be designed to meet the requirements of the
          Human Rights and Equal Opportunity Commission “Advisory Notes on Access to
          Premises” and AS1428.2;
     12.2 Applicants should be aware that a “Disability Standard on Access to Premises is
          being developed and most likely will result in changes to the Building Code of
          Australia;
     12.3 Any services and facilities in the building complex must allow independent,
          dignified and equitable use of the services and facilities for all people.
     12.4 This proposal has not been assessed in relation to the spread of fire between
          properties/buildings. It is the building certifiers responsibility to assess the
          requirements for fire services, fire separation and appropriate methods of
          construction as part of the building works approval process. Referral to the
          Queensland Fire and Rescue Service (QFRS) may be required as part of the
          Building Approval process.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the activity
does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of
care. Substantial monetary penalties may apply to individuals or corporations breaching this
duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity that is harming or
is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural
heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not Applicable

9     PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable

10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development        Subject of the required Development Permit
 Permit required

 Development Permit for     All Building Works
 Building Works

 Development Permit for     Landscaping, site civil works including earthworks, roadworks including
 Operational Works          works required by Department of Main Roads, access, internal roads
                            and carparking, stormwater drainage including dams and underground
                            stormwater harvesting tanks, frontage works including pathways, sewer
                            reticulation, water reticulation, erosion & sediment control


11    SELF ASSESSABLE CODES
Not Applicable


                                                                                   Page 19 of 21

Page 20

                                                                                132007.2398.01


12      SUBMISSIONS
There were 2 properly made submissions about the original development application. Please
refer to the Negotiated Decision Notice dated 24 June 2010 for the name and address of the
principal submitter for each properly made submission.
13      REASONS / GROUNDS FOR APPOVAL
Not Applicable
14      RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.
15      OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies of which are
available on line at www.noosa.qld.gov.au, or at Council offices.

DECISION NOTICE HISTORY
Original Decision Notice - 8 February 2010
Negotiated Decision Notice - 23 June 2010
Compiled Decision Notice – 24 June 2014


Yours faithfully




KERRI COYLE
MANAGER PLANNING AND ENVIRONMENT


Encl.    Appeal Rights



cc       Unitywater




                                                                               Page 20 of 21

Page 21

                                                                                          132007.2398.01



                                           Appeal Rights
                                           SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                           REGULATION 2009



The following is an extract from the Sustainable
Planning Act 2009 (Chapter 7)


466      Appeals about decisions             relating   to
         permissible changes
(1)      For a development approval given for a
         development application, the following persons
         may appeal to the court against a decision on a
         request to make a permissible change to the
         approval—
         (a)       if the responsible entity for making the
                   change is the assessment manager for
                   the application—
                   (i)       the person who made the
                             request; or
                   (ii)      an entity that gave a notice
                             under section 373 or a pre-
                             request response notice about
                             the request;
         (b)       if the responsible entity for making the
                   change is a concurrence agency for the
                   application—the person who made the
                   request.
(2)      The appeal must be started within 20 business
         days after the day the person is given notice of
         the decision on the request under section 376.
(3)      Also, a person who has made a request under
         section 369 may appeal to the court against a
         deemed refusal of the request.
(4)      An appeal under subsection (3) may be started at
         any time after the last day the decision on the
         matter should have been made.




                                                                                          Page 21 of 21

Used in these records

About this file

File size
121 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

B CURRENT DECISION NOTICE.pdf · 121 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.