Skip to the record
Beware of cheap imitations.

Council archive · source document

B Current Decision Notice · 132007.2398

Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.

of 21

Text shows just the words. Original shows the document exactly as it was published.

                                                                               132007.2398.01


4    CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
1.   Development, including staging of the development, shall be undertaken in accordance
     with this approval and must generally comply with the approved plans of development.
     The approved plans are titled and numbered: -
     Site Masterplan                          0805-TP03     Revision B     1 November 2008
     Schedule of Independent Living Units     0805-TP04     Revision B     1 November 2008
     Masterplan Staging                       0805-TP05     Revision B     1 November 2008
     Village Community Centre – Plans &       0805-TP06     Revision B     9 March 2009
     Elevations
     Village Community Centre – Roof Plan     -             -              -
     Apartment Building – Floor Plans         0805-TP07     Revision B     1 November 2008
     Apartment Building – Roof Plan           -             -              -
     Apartment Building – Elevations          0805-TP08     -              June 2008
     Aged Care Residence – Floor and Roof     0805-TP09     Revision B     9 March 2009
     Plans


     Aged Care Residence – Elevations         0805-TP10     Revision B     9 March 2009
     External materials & colour palette      0805-TP11     -              June 2008
     Typical Sections                         0805-TP13     -              June 2008
     Standard Aged Care Unit Type Z1-B        -             -              October 2007
     Plan & Elevations - Floor Plan (Hip
     Roof)
     Standard Aged Care Unit Type Z1-B -      -             -              October 2007
     Elevations
     Standard Aged Care Unit Type Z2-B        -             -              30       September
     Reversed Plan & Elevations – Floor                                    2008
     Plan (Hip Roof)
     Standard Aged Care Unit Type Z2-B        -             -              30       September
     Reversed - Elevations (Skillion Roof)                                 2008
     Standard Aged Care Unit Type Z3-B        -             -              October 2007
     Plan & Elevations – Floor Plan (Hip
     Roof)
     Standard Aged Care Unit Type Z3-B –      -             -              October 2007
     Elevations
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed Plan – Floor Plan (Hip                                  2008
     Roof)
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed – Elevations (Gable &                                   2008
     Hip Roof)
     Standard Aged Care Unit Duplex Type      -             -              30       September
     Z4-B Reversed – Elevations (Hip Roof)                                 2008

     prepared by Smith and Tracey Architects and as may be amended by these conditions.



                                                                               Page 2 of 21

Used in these records

About this file

File size
121 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

B CURRENT DECISION NOTICE.pdf · 121 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.