Attached to the e-mail 132007.2398.02 Request to change existing approval (1 of 3) Cover letter and site, floor & elevation plans.
132007.2398.01
Erosion and Sediment Control
90. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
Contributions Towards Council Infrastructure
91. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the
cost of providing and/or upgrading various infrastructure at the rates applicable at the
time of payment. An estimate only of the contribution amounts under the current Council
policies and requirements is outlined in the table below:
Rebate for
Total Eligible
INFRASTRUCTURE NETWORK
Contributio Community
Organisation Total
n Amount
Stage PSP 12 PSP 16 PSP 17 PSP 20 Rural / Local Applicable Charitable non- Payable
Public Rural Water Pathway Roadworks to profit for
Developme $
Open Sewerage Headworks Trunk community
Space Headworks Network nt services
(Park) facilities
Stage 1 $105,504 $202,017 $197,531 $49,374 $17,848 $572,274 100% $0
Stage 2 $22,936 $65,655 $59,003 $10,495 $7,349 $165,438 100% $0
Stage 3 $31,673 $90,667 $81,480 $14,492 $10,149 $228,461 100% $0
Stage 4 $14,198 $40,644 $36,525 $6,497 $4,549 $102,413 100% $0
Stage 5 $22,936 $65,655 $59,003 $10,495 $7,349 $165,438 100% $0
Stage 6 $26,212 $75,035 $67,432 $11,994 $8,399 $189,072 100% $0
Stage 7 $19,659 $56,276 $50,574 $8,995 $6,299 $141,803 100% $0
Stage 8 $21,844 $62,529 $56,193 $9,995 $6,999 $157,560 100% $0
Stage 9 $13,106 $37,517 $33,716 $5,997 $4,200 $94,536 100% $0
Total = $278,068 $695,995 $641,457 $128,334 $73,141 $1,816,995 100% $0
Please note that these amounts are all subject to variations in the Consumer Price
Index, All Groups Brisbane from December 2009 until the date of payment. All
contributions must be paid prior to commencement of use.
General
92. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
application for Operational Works.
93. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. The design shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes
or services, all existing and proposed services required by the development shall be
shown on the plans.
94. To facilitate production of As Constructed drawings it is suggested that all design
drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).
Page 12 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
B CURRENT DECISION NOTICE.pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.